| 1 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. |
| 2 | Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) |
| 3 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. |
| 4 | Extra for cutting reinforcement bars manually/ by mechanical means in R.C.C. or R.B. work (Payment shall be made on the cross sectional area of R.C.C. or R.B. work) as per direction of Engineer in-charge. |
| 5 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials accumulated in site by mechanical/ manual means, including loading, transporting, unloading etc to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved. |
| 6 | Dismantling of existing 18 Metre height Roof Top Tower (weight upto 2400 Kgs) including marking, dismembering of tower materials, Gantry and antana fixtures and mountings carefully and cautiously without damge to the members and near by structures and stacking the members neatly as directed by the Engineer-in-charge. |
| 7 | Note 1. Necessary safety measures shall be adopted while dismantling the tower to ensure the safety of men and materials and adjacent properties. |
| 8 | Note 2. The safe custody of tower materials will be the responsibility of the agency from the time of dismantling till the handing over of tower to concerned authorities. |
| 9 | Transportation of 18M height RTT, tower materials (upto 2400 Kgs) including ladders, gusset plates, working platform, cable trays, antenna fixtures etc., from NBSNL sites (Thangam Middle School / Authoor) to SIPCOT store yard (or) assigned by the SSA authorities including loading, unloading, and lifting of materials and transporting the empty and ladened vehicle to the weigh bridge for weighing the tower materials including weighing charges etc., complete as directed by the Engineer in charge. |
| 10 | Desending of building rubbish / malba / similar unserviceable, dismantled/ demolished from the old BTS plarform in the cramped second floor terrace of old NBSNL site by manual means including arranging rope & pulley etc to the ground level without disturbing the other units working within and nearby buildings after ensuring safety measures to men and materials all as per the directions of Engineer-in-charge. |
| 11 | Dismantling of existing 21 Metre height Roof Top Tower (weight upto 2700 Kgs) including marking, dismembering of tower materials, Gantry and antana fixtures and mountings carefully and cautiously without damge to the members and near by structures and stacking the members neatly as directed by the Engineer-in-charge. |
| 12 | Note 1. Necessary safety measures shall be adopted while dismantling the tower to ensure the safety of men and materials and adjacent properties. |
| 13 | Note 2. The safe custody of tower materials will be the responsibility of the agency from the time of dismantling till the handing over of tower to concerned authorities. |
| 14 | Transportation of 21M height RTT, tower materials (upto 2700 Kgs) including ladders, gusset plates, working platform, cable trays, antenna fixtures etc., from old NBSNL sites Alaganeri to Melapalayam store yard (or) assigned by the SSA authorities including loading, unloading, and lifting of materials and transporting the empty and ladened vehicle to the weigh bridge for weighing the tower materials including weighing charges etc., complete as directed by the Engineer in charge. |
| 15 | Credit for taking away recovered steel reinforcement / Mild steel bars (unserviceable) in available diameters and avaialable lengths and shape. Please Enable Macros to View BoQ information |