|
| 1 | Supplying empty cement bags & filling with available soil/ OB/ good earth including stiching of bags, transporting the filled bags at required places laying in layers with all lead and lift and materials and labours, tools plants required to complete the job as per the instructions of the EIC. |
| 2 | Cleaning of hume pipes, box culvert by mechanical means/ manual means by excavating accumulated easrth inside the hume pipe and at the mouth of hume pipes etc including getting out and disposal of excavated earth lead upto 50m and lift upto 1.50m as directed by the EIC. All kinds of soil |
| 3 | Regular cleaning work during monsoon period and other miscellaneouc civil works such as removal of spillover earth work on CTR road, cleaning of road side berms of CTR road. Cutting of drain to drain off the water from road surface, cleaning of small drains etc. as per instruction of EIC. |
| 4 | Laying & placing RCC hume pipe of 1200 mm dia at different locations with all labours as per instruction of the Engineer-in-charge. ( Labour rate only ). |
| 5 | Laying & placing RCC hume pipe of 900 mm dia. At different locations with all labours as per instruction of the Engineer-in-charge. ( Labour rate only ). |
| 6 | Laying & placing RCC hume pipe of 600 mm dia. At different locations with all labours as per instruction of the Engineer-in-charge. ( Labour rate only ). |
| 7 | Supplying and stacking at site. 63 mm to 45 mm size stone aggregate. ( Payment will be made for the quantity of stack after deduction of 7.50% for voids.) |
| 8 | Supplying and stacking at site. 53 mm to 22.4 mm size stone aggregate.( Payment will be made for the quantity of stack after deduction of 7.50% for voids.) |
| 9 | Supplying and stacking at site. 13.20mm to 0.09 mm size stone aggregate. |
| 10 | Laying, spreading and compacting stone aggregate of specified sizes to WBM specifications in uniform thickness in pot holes and depressions of WBM surface, hand picking, applying requisite type of screening / binding material to fill up interstices of coarse aggregate, compacting with mechanical means to the required density including transportation from stock at mine premises at different locations all complete as per the direction of Engineer in charge. |
| 11 | Earth work in excavation by mechanical means in drain / nallah of required size & shape in ordinary soil, soft rock, muddy soil etc. & disposal of excavated earth by levelling & dressing to a lead of 0 to 25 metres from the edge of nallah as per the instruction of the Engineer-in-charge including all lead & lift, hire charges & running cost of all machines, driver, khalasi, chowkidar etc. all complete. |
| 12 | Earth work in excavation by mechanical means in drain / nallah of required size & shape in ordinary soil, soft rock, muddy soil etc. & disposal of excavated earth by levelling & dressing to a lead of 0 to 1.00 KM from the edge of nallah as per the instruction of the Engineer-in-charge including all lead & lift, hire charges & r unning cost of all machines, driver, khalasi, chowkidar etc. all complete. |
| 13 | Total impact of GST for the purpose of CTC Please Enable Macros to View BoQ information |