|
| 1 | Dismantling and transportation of 1000mm PVC belting from one district to another district in UG up to end of track line for a lead of 1 KM |
| 2 | Dismantling belt from -7D/-11LS to -7D/-21LS = 260 x 2 = 520 mtrs. , Distance of Transportation = 300 mtrs. (-7D/-11LS to -13L/-17D) |
| 3 | Dismantling belt from -13L/-7D to -13L/-17D = 260 x 2 = 520 mtrs. , Distance of Transportation = 400 mtrs. (-13L/-7D to -3L/-14D) |
| 4 | Dismantling belt from -8L/-7D to -8L/-17D = 260 x 2 = 520 mtrs. , Distance of Transportation = 400 mtrs. {-8L/-7D to 0L/MD (Seam-II)} |
| 5 | Change of PVC belting on conveyor structure |
| 6 | From 02LS/01D to -7D/-21LS (510 x 2 = 1020 mtrs.) |
| 7 | From -13L/-7D to -13L/-17D (260 x 2 = 520 mtrs.) |
| 8 | From -8L/-7D to -8L/-17D (260 x 2 = 520 mtrs.) |
| 9 | From 0L/01R to -3L/-14D (180 x 2 = 360 mtrs.) |
| 10 | Dismantling of belt structure of 1000mm and transportation of the same up to end of track line at a lead of 100 m in UG |
| 11 | Dismantling structure from -7D/-11LS to -7D/-21LS = 260 mtrs. , Distance of Transportation = 300 mtrs. (-7D/-11LS to -13L/-17D) |
| 12 | Dismantling structure from -13L/-7D to -13L/-17D = 260 mtrs. , Distance of Transportation = 400 mtrs. (-13L/-7D to -3L/-14D) |
| 13 | Dismantling structure from -8L/-7D to -8L/-17D = 260 mtrs. , Distance of Transportation = 400 mtrs. {-8L/-7D to 0L/MD (Seam-II)} |
| 14 | Installation of Belt Structure of 1000mm in UG gallery |
| 15 | From 02LS/01D to -7D/-21LS (510 mtrs.) |
| 16 | From -13L/-7D to -13L/-17D (260 mtrs.) |
| 17 | From -8L/-7D to -8L/-17D (260 mtrs.) |
| 18 | From 0L/01R to -3L/-14D (180 mtrs.) |
| 19 | Dismantling, transportation and installation of 1000 mm size tail end drum, drum base, tail end guard, side plate/loading chute, decking plate in UG within a lead of 100 mtr. |
| 20 | Dismantling at -7D/-21LS, Transportation of 300 mtrs. from -7D/-21LS to -13L/-17D (04 shiftings at a span of 50 mtrs.) and installation at -13L/-17D |
| 21 | Dismantling at -7L/-16D, Transportation of 450 mtrs. from -7L/-16D to -8L/-17D (04 shiftings at a span of 50 mtrs.) and installation at -8L/-17D |
| 22 | Dismantling at -13L/-17D , Transportation of 400 mtrs. from -13L/-17D to -3L/-14D (02 shiftings at a span of 50 mtrs.) and installation at 02L/-17D |
| 23 | Dismantling and transportation of 1000 mm size double drive drum with loop take-up up to the track end with a lead of 100 m |
| 24 | Dismantling at -17L/-7D, Transportation of 260 mtrs. from -17L/-7D to -8L/-17D and installation at -8L/-17D |
| 25 | Dismantling at -13L/-7D, Transportation of 260 mtrs. from -13L/-7D to 0L/01R and installation at 0L/01R |
| 26 | Dismantling at -8L/-7D, Transportation of 200 mtrs. from -8L/MD to MD/0L and installation at MD/0L |
| 27 | Installation of 1000 mm size double drive drum with loop take-up |
| 28 | Installation at 02LS/01D |
| 29 | Installation at -13L/-7D |
| 30 | Installation at -8L/-7D |
| 31 | Installation at 0L/01R |
| 32 | Total impact of GST for the purpose of CTC Please Enable Macros to View BoQ information |