|
| 1 | Dismantling of VLRA Battery Set of Capacity 200AH to 900AH including disconnecting power cables along with all accessories | Dismantling of VLRA Battery Set of Capacity 200AH to 900AH including disconnecting power cables along with all accessories |
| 2 | Dismantling of VLRA battery set of Capacity 1000AH to 1500AH including disconnecting power cables along with all accessories | Dismantling of VLRA battery set of Capacity 1000AH to 1500AH including disconnecting power cables along with all accessories |
| 3 | Dismantling of VLRA battery set of capacity 2000AH to 4000AH including disconnecting power cables along with all accessories | Dismantling of VLRA battery set of capacity 2000AH to 4000AH including disconnecting power cables along with all accessories |
| 4 | Dismantling of VLRA Power Plant including disconecting power cables with all accessories | Dismantling of VLRA Power Plant including disconecting power cables with all accessories |
| 5 | Installation of VRLA Battery 400AH TO 600AH connecting HRC fuse testing and commissioning of the above battery AND PP set on available exchange load as required | Installation of VRLA Battery 400AH TO 600AH connecting HRC fuse testing and commissioning of the above battery AND PP set on available exchange load as required |
| 6 | Installation of VRLA Battery1000AH TO 1500AH connecting HRC fuse testing and commissioning of the above batteryPP set on available exchange load as required | Installation of VRLA Battery1000AH TO 1500AH connecting HRC fuse testing and commissioning of the above batteryPP set on available exchange load as required |
| 7 | Installation of VRLA Battery2000AH TO 4000AH connecting HRC fuse testing and commissioning of the above battery and PP set on available exchange load as required | Installation of VRLA Battery2000AH TO 4000AH connecting HRC fuse testing and commissioning of the above battery and PP set on available exchange load as required |
| 8 | Installation of VRLA Power Plant connecting HRC fuse testing and commissioning of the above batter and PP set on available exchange load as required | Installation of VRLA Power Plant connecting HRC fuse testing and commissioning of the above batter and PP set on available exchange load as required |
| 9 | Additional charges to shift the VRLA Battery 400AH TO 900AH set to upper floor at siteIn the case of buildings where lift facility is not available | Additional charges to shift the VRLA Battery 400AH TO 900AH set to upper floor at siteIn the case of buildings where lift facility is not available |
| 10 | Additional charges to shift the VRLA Battery1000AH TO 2000AHset to upper floor at siteIn the case of buildings where lift facility is not available | Additional charges to shift the VRLA Battery1000AH TO 2000AHset to upper floor at siteIn the case of buildings where lift facility is not available |
| 11 | Additional charges to shift the VRLA Power Plant to upper floor at siteIn the case of buildings where lift facility is not available | Additional charges to shift the VRLA Power Plant to upper floor at siteIn the case of buildings where lift facility is not available |
| 12 | Installation of Battery PP sets LiIon 300 AH to 900 AH and PP connecting HRC fuse testing and commissioning of the above batteryPP set on available exchange load as required | Installation of Battery PP sets LiIon 300 AH to 900 AH and PP connecting HRC fuse testing and commissioning of the above batteryPP set on available exchange load as required |
| 13 | Installation of Battery PP sets LiIon above 900 AH and PP connecting HRC fuse testing and commissioning of the above batteryPP set on available exchange load as required | Installation of Battery PP sets LiIon above 900 AH and PP connecting HRC fuse testing and commissioning of the above batteryPP set on available exchange load as required |
| 14 | Additional charges to shift the Liion BBPP 400AH TO 900AHandPP set to upper floor at site In the case of buildings where lift facility is not available | Additional charges to shift the Liion BBPP 400AH TO 900AHandPP set to upper floor at site In the case of buildings where lift facility is not available |
| 15 | Additional charges to shift the Liion BBPP above 900AHandPP set to upper floor at site In the case of buildings where lift facility is not available | Additional charges to shift the Liion BBPP above 900AHandPP set to upper floor at site In the case of buildings where lift facility is not available |
| 16 | Transportation of Battery Power plant Liion BBPP from BA Stores or any sites as instructed by site in charge | Transportation of Battery Power plant Liion BBPP from BA Stores or any sites as instructed by site in charge |
| 17 | Loading and unloading charges | Loading and unloading charges |