Name of Work:- RE-EXCAVATION AND CLEANING OF WATER BODY AT 3L DR GS BOSE ROAD IN WARD NO 67 UNDER BOROUGH VII (2nd call)
Sl. No.
Item Description
1
BUILDING WORKS (A) EARTH WORK,ANTITERMITE TREATMENT 8. Pumping out water from ponds or tanks .(Payment if permitted will be made on the quantity of water calculated on the basis of initial water level and final level on consideration being made for any water that may have been added through percolation or otherwise).
2
EARTHWORK FOR RIVERS, CHANNELS, CANALS, EMBANKMENTS ETC.1.23 Cutting uprooting and clearing jungles including shrubs, water weeds, bushes, trees, plants, upto 30 cm. girth including removing as directed by Engineer-in-charge.
3
EARTHWORK FOR RIVERS, CHANNELS, CANALS, EMBANKMENTS ETC.1.12.Earthwork in re-excavation / silt clearance in drainage channel in all kinds of soil including sludge, slush mixed with all sorts of industrial wastes and municipal garbages, polypacks, carcasses, small khatal effluents, night soil etc. by mathor labour as may be necessary and depositing the same in places as directed by the Engineer-in-charge , in such a manner, without causing much hindrance to traffic and posing health hazard and making arrangement to maintain the site in workable condition and rough dressing when dry including making arrangement of bailing out of any seepage water and removal of sand or soil blown from underneath, removal of khatal, temporary latrines, clearing and removing all kinds of semi compact masses formed by water hyacinth, jungles up to 30 cm girth, and burning them to ashes or removing outside Government land in conformity with the Municipal rules, including shoring shuttering as required, nicking out lines etc. (Measurement : Pre-work and Post-work level section. Pre- work section to be taken after removal of water hyacinth and all other floating materials etc.) (a) By manual means within an initial lead of 30 M and an initial lift of 1.50 M
4
BUILDING WORKS (B) DISMANTLING, CUTTING CHASE, HOLES ETC 13. Removal of rubbish,earth etc. from the working site and disposal of the same beyond the compound, in conformity with the Municipal / Corporation Rules for such disposal, loading into truck and cleaning the site in all respect as per direction of Engineer in charge
5
Estimated amount
6
Add: 9%SGST
7
Add: 9%CGST
8
1% LWC Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.