| 1 | Earth work in excavation of foundation trenches or drains in all sorts of soil (including mixed soil but excluding laterite or sand stone) including removing spreading or stacking the spills within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches. Leveling dressing and ramming the bottom. Bailing out water as required complete. |
| 2 | Cement concrete with 30mm. down graded shingles excluding shuttering.1:3:6 |
| 3 | Brick work with 1st class bricks with 6:1 cement morter |
| 4 | Ordinary cement concrete (mix 3:1:5:1) M20 with graded stone chips (20mm.down excluding shuttering and reinforcement, if any in ground floor as per IS 456-2000 |
| 5 | Hire and labour charges for shuttering with centering and necessary staging up to 4m. Using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs beams, columns, lintels curved or straight including fitting. Fixing and striking out after completion of works. When the height of particular floor is more than 4m. the equivalent floor ht. shall be taken as 4m. and extra for works beyond the initial 4m. ht. shall be allowed under 12(e) for every 4m. or part thereof) |
| 6 | Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc, including supply of rods, initial straightening and removal of loose rust (if necessary) cutting to requisite length , hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every inter-section, complete as per drawing and direction. |
| 7 | Plaster (to wall, floor, ceiling etc.) with sand and cement morar including rounding off or chamfering corners as directed and raking out joints or roughening of concrete surface. including throating , nosing and drip course where necessary ( ground floor) ii) With 4:1 cement morter c)10 mm thick plaster |
| 8 | Neat cement punning about 1.5 mm thick in wall dado, window, sills, floor, drain etc. |
| 9 | Supply and fitting fixing of UPVC pipes (B type ) 110mm |
| 10 | Supplying, fitting and fixing in position R.C.C manhole/pit cover |
| 11 | Supplying, fitting and fixing in position Sign board |
| 12 | Model Estimate of Siltchamber 0.6mx0.6mEarth work in excavation of foundation trenches or drains in all sorts of soil (including mixed soil but excluding laterite or sand stone) including removing spreading or stacking the spills within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches. Leveling dressing and ramming the bottom. Bailing out water as required complete |
| 13 | 125mm thick brick |
| 14 | PWD(Bldg.) NBCC-I Page No.:-15 / ItemNo :-7 Ordinary cement concrete (mix 3:1:5:1) M20 with graded stone chips (20mm.down excluding shuttering and reinforcement, if any in ground floor as per IS 456-2000 |
| 15 | Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc, including supply of rods, initial straightening and removal of loose rust (if necessary) cutting to requisite length , hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every inter-section, complete as per drawing and direction. |
| 16 | Plaster (to wall, floor, ceiling etc.) with sand and cement morar including rounding off or chamfering corners as directed and raking out joints or roughening of concrete surface. including throating , nosing and drip course where necessary ( ground floor) |
| 17 | Neat cement punning about 1.5 mm thick in wall dado, window, sills, floor, drain etc. |
| 18 | GST 18 % |
| 19 | Cess 1 % Please Enable Macros to View BoQ information |