Name of Work:- Cleaning and Excavation of MC land at Roop Nagar in Ward No.-12, Municipal Corporation Ynr-Jag
Sl. No.
Item Description
1
Execution of topographical and cadastral survey works involving demarcation of pond boundary using total station/GPS, and detailed contouring of the pond area before and after excavation. The scope includes preparation and submission of accurate level sheets indicating contour intervals and demarcation details, ensuring horizontal and vertical control in accordance with standard surveying practices, and as per the instructions of the Assistant Engineer. The work shall be completed in all respects, including field data collection, plotting, and documentation.
2
[10.100.2]Cement Concrete 1:8:16 Flooring 2. Cement Concrete 1:8:16 with stone aggregate 40 mm size in foundation and plinth. [Through Rate]
3
[3.1.3]By Mechanical Transport including loading, unloading and stacking 3. Manure or sludge [5km]
4
[34.29.2]GI barbed wire fencing 2. G.I Barbed Wire Fencing 1.8 Metre High Providing and fixing 1.8 metres high GI barbed wire fencing with 2.4 m angle iron posts 50 mm x 50 mm x 6 mm placed every 3 metres centre to centre founded in M15 grade cement concrete, 0.6 metre below ground level, every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and provided with 12 horizontal lines and 2 diagonals interwoven with horizontal wires, fixed with GI staples, turn buckles etc complete as per clause 807 [Through Rate]
5
[4.12.1]Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by Engineer-in-charge. 1. All kinds of soil [Through Rate]
6
[6.1.1]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 1. 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size) [Through Rate]
7
[6.30.1]Centering and shuttering including strutting, propping etc. and removal of form for 1. Foundations, footings, bases of columns, etc. for mass concrete [Through Rate]
8
[7.70]Extra for bailing / pumping out standing water of pond caused by springs, sub soil water, canal or river seepage and broken water mains or drains except rain water collected in the trenches or foundations before laying brick work. [Through Rate] Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.