Name of Work:- Dismantling the dummy machine hole in Main Cross Street in Zone 4 in Ward No 39.
Sl. No.
Item Description
1
Dewatering using 10 HP diesel engine pumpset including Hire charges, cost of Diesel, Engine oil, pump operator, labour charges, conveyance of pumpset and fuel to site and back, loading, unloading and any other incidental charges etc., complete
2
Diesel Pump set for 10 HP
3
Supply, delivery and fixing of the following ISI make water supply materials including all labour charges etc., complete
4
200mm dia PVC Pipe
5
Barricading work (Where, there is less traffic areas and broader roads etc.) for laying of pipe line using casurina poles at 1.50m center to center (8cm to 10cm dia and 1.80m height) vertical with horizontal poles in three rows including painting the vertical poles inthe road facing sides with ready mix paint,tying the vertical and horizontal poles with coir rope including fixing charges and fixing 75mm dia reflectors including earth work excavation for fixing vertical posts and finally removing and stacking the materials safely for further use etc., complete and as directed by TWAD Board officers.
6
Earth work excavation and depositing on bank with initial lead of 10m and lift of 2.00m in narrow trenches for laying of pipes for water supply and sewerage works in the following types of soil strata as directed by departmental officers
7
Lowering PVC pipes and specials to trench andlaying to proper grade and alignment and as directed by the TWAD Officers
8
200 mm dia PVC pipe
9
Refilling excavated earth etc., complete as per the standard specification
10
Shoring, and strutting with sheet piles of size width 400 mm x height of 3m x thickness of 9mm as per IS 2314-1986 by driving on both sides of the trench from Ground Level up to the required depth and connecting the above sheet piles by horizontal strutting with sheet piles at an interval of 1.0m, fixing the sheet piles by connecting the horizontal strutting with casurina poles of 8cm to 10cm dia. at 1.50m interval and including removing the sheet piles after the pipelines are laid, jointed, tested, and stacking it safely for other uses. It includes the cost of sheet piles and casurina poles including labour charges for erecting the sheet piles, driving the sheet piles, removing the sheet piles, fixing Casurina poles, etc., complete and all other incidental charges for the depths
11
(i) 0 to 6 m
12
Plain Cement Concrete 1:2:4 (one cement, two Crushed Stone Sand (M- Sand) and four coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.