| 1 | Excavation of HT Pole Pit |
| 2 | Pole Erection |
| 3 | Fixing of Base Plate |
| 4 | Excavation of stay pit |
| 5 | Erection of Stay set |
| 6 | Fixing of V Cross Arm |
| 7 | Fixing of 11KV TI fitting |
| 8 | Fixing of 11KV Strain Disc with MP |
| 9 | Fixing of 11KV Pin with Insulator |
| 10 | Fixing of Tapping Channel X arm |
| 11 | Paving of Conductor ASCR 7/2.59Sqmm |
| 12 | Paving of Conductor ASCR 7/3.35Sqmm |
| 13 | Laying of 1 Run XLPE 3X300mm Cable & Covered the cable with V trouph and river sand |
| 14 | Excation of Trench per Laying of XLPE Cable 1 Run |
| 15 | Erection of 11KV 3X300mm OD End Termination Kit |
| 16 | Dismantling of ACSR 7/3.15mm |
| 17 | Fixing of Guarding X arm |
| 18 | Release and Reuse of ACSR 7/2.59mm |
| 19 | Loading and Unloadin of New & Old Poles |
| 20 | Pole Transporting from Road Side to Pole pit |
| 21 | Pole earthing |
| 22 | Pole Concreting |
| 23 | Release and Reuse of 3 phase X arm |
| 24 | Release and Reuse of LT Shackle |
| 25 | Release and Reuse of LT Pin |
| 26 | Release and Reuse of Aluminium Knob |
| 27 | Excavation of pole pit for 8m PSC pole |
| 28 | Erection of 8m PSC pole |
| 29 | Fixing of Base plate |
| 30 | Dismantling of RCC Pole scrap |
| 31 | Excavation of Stay pit |
| 32 | Erection of Stay set |
| 33 | Fixing of 3 Phase Cross Arm |
| 34 | Fixing of Single Phase Cross Arm |
| 35 | Dismantlng of Single Phase cross arm |
| 36 | Dismantlng of 3 Phase cross arm |
| 37 | Fixing of LT Shackle with Metal Parts |
| 38 | Dismantling of LT Shackle with Metal Parts |
| 39 | Fixing of LT Pin with Insulator |
| 40 | Dismantling of LT Pin with Insulator |
| 41 | Fixing of Aluminium Knob |
| 42 | Dismantling of Aluminium Knob |
| 43 | Paving of Conductor AAAC 7/3.15mm |
| 44 | Paving of Conductor AAAC 7/2.50mm |
| 45 | Dismanling of Conductor ACSR 7/2.50mm |
| 46 | Loading and Unloading of 8m PSC Poles |
| 47 | Pole Transporting from Road Side to Pole pit |
| 48 | Pole earthing |
| 49 | Pole Concreting |
| 50 | Structure erection complete excluding transformer erection |
| 51 | Erection of transformer in structure for all capacities |
| 52 | Transporting of DT/Metering Set |
| 53 | Erection/Dismantling of Metering set Please Enable Macros to View BoQ information |