| 1 | Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3 (Excluding G.S.T.) |
| 2 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader/tractor mounted appropriate equipment on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specificatin Clause 401.(For Grading I Material). (Excluding G.S.T.) |
| 3 | Providing, laying, spreading and compacting stone aggregates of specific sizes to Water Bound Macadam Sub-base/Base (WBM Grading 3) specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405 (By Mechanical Means') .(Excluding G.S.T.) |
| 4 | Providing, laying, spreading Material on a prepared sub base (WBM), Cement @ 4% by weight to the spread Material manually mixing in place with rotavator and compacting with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer to sub-base. (Excluding G.S.T.) |
| 5 | Providing and applying primer coat of Low Porosity with Bitumen emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at rate of 0.70 Kg/Sqm using mechanical means as per Technical Specification Clause 502. (Excluding G.S.T.) |
| 6 | Providing and applying tack coat with VG-10 using bitumen distributor at the rate of 0.30 kg per sqm on the prepared granular surfaces treated with primer/Bituminous surface as per Technical Specification Clause 503. (Excluding G.S.T.) |
| 7 | Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates using VG-10 to required line, grade and level to serve as wearing course on a previously prepared base by manual means, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades as per Technical Specification Clause 508 ( By Manual Means) . (Excluding G.S.T.) |
| 8 | Providing and laying seal coat by manual means with VG-10 sealing the voids in a Bituminous surface laid to the specified levels, grade and cross fall using Type 'C' as per Technical Specification Clause 510 ( By Manual Means). (Excluding G.S.T.) |
| 9 | Construction of un-reinforced, without dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days. (Excluding G.S.T.) |
| 10 | Providing Plain Concrete (1:3:6) in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203. (Excluding G.S.T.) |
| 11 | Providing Reinforced Concrete M20 (1:1.5:3) in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 (Excluding G.S.T.) |
| 12 | Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202 (Excluding G.S.T.) |
| 13 | Supply, Laying & Fixing of of 350 mm dia NP-3 RCC Hume Pipes including all material, labour & T&P etc. (Excluding G.S.T.) |
| 14 | Construction of Patri on both side of the road with Carted Earth Cartage of Earth 5.00 Km with all lift and lead, transporting to site ,spreding grading to required slope and compacting as per SOR SI No 253 & 261 (C). complete in all respects (Excluding G.S.T.) |
| 15 | Brick lining on both side of the road of M-150 bricks 7 cm. wide. 11 cm. deep, laid with mud mortar including labour & supply of bricks finished to the required template and in proper alignment and also including dressing and ramming the excavated earth as directed by the Engineer-in-charge. Excluding GST (Excluding G.S.T.) |
| 16 | M-150 Brick on edge pavement on parties with bricks, laid dry joints filled with local sand including preparation of base to proper slope, and its ramming, spreading layer of 1 cm. (3/8\\") depth of local sand over the subgrade and including supply of all materials, labour Tools &plants etc. required for proper completion of the work. (Excluding G.S.T.) Please Enable Macros to View BoQ information |