| 1 | Percentage BoQ BoQ_Ver3.0 Percentage Normal INR Only INR Select, At Par, Excess (+), Less (-) IOCL Tender Inviting Authority: EXECUTIVE ENGINEER REW DIVISION KATHUA Name of Work; Construction of Cummunity composite pit at Siara Pyt Siara Block Bani District Kathua under SBM-G for the year 2025-26. ESTT AMOUNT 0.50 LACS Contract NO:- SBM-G 2025-26 Name of the Bidder/ Bidding Firm / Company : PRICE SCHEDULE(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only ) NUMBER # TEXT # TEXT # NUMBER # TEXT # NUMBER NUMBER TEXT TEXT # NUMBER # TEXT# TEXT # NUMBER # NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER # NUMBER # TEXT TEXT NUMBER # NUMBER # DATE NUMBER # NUMBER # TEXT # S. No. Item Description Item Code / Make Quantity Units Estimated Rate inRs. P Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE In Figures To be entered by the Bidder Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category TOTAL AMOUNT inRs. P TOTAL AMOUNT With Taxes TOTAL AMOUNT In Words |
| 2 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:All kinds of soil |
| 3 | Dry Stone Aggregate 40 mm size |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) |
| 5 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in :Cement mortar 1:6 ( 1 cement : 6 coarse sand) |
| 6 | Honey-comb brick work 10/11.4 cm thick with common burnt clay (non-modular) bricks of class designation 75 in superstructure above plinth level upto floor five level in cement mortar 1:4 (1 cement : 4 coarse sand) including curing complete |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form work for: |
| 8 | Foundations, footings, bases for columns |
| 9 | 12mm Cement plaster of mix:1 : 6 ( 1 cement : 6 fine sand) |
| 10 | Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc. complete.40mm thick with 20 mm nominal size stone aggregate. |
| 11 | Structural steel work in single section , fixed with or without connection plate, incl cutting ,hosting, fixing in position and applying a priming coat of approved steel primer all complete |
| 12 | Colour washing such as green blue or buff to give an even shade New work (two or more coats) with a basecoat of white washing with lime |
| 13 | Carriage/consumption of Material |
| 14 | Sand for 90 Km by MT |
| 15 | Agg for 90 Km by MT |
| 16 | Agg. above 90Km by MT |
| 17 | Brick for 160Km by MT |
| 18 | Add provision for Fibre sheet |
| 19 | CIB (citizen information Board ) Total in Figures Excess(+) 1.0 Full Conversion INR 50629.72 50629.72 INR Fifty Thousand Six Hundred & Twenty Nine and Paise Seventy Two Only 4.0 Construction of chamber for 100mm sluice plates item5 10.0 Nos Quoted Rate in Figures Select 0.0 0.0 INR Zero Only Quoted Rate in Words INR Zero Only Please Enable Macros to View BoQ information |