|
| 1 | Demolition above GL up to floor two level i/c disposal of unserviceable materials and disposal of unserviceable material with in 20 metres lead as per direction with in all leads and lifts as directed by the Engineer-in-Charge. |
| 2 | Dressing the ground including cutting and filling upto 15cm with in all leads and lifts as per the direction of Engineer in Charge. |
| 3 | Excavated in earth work and disposal of all excavated earth such as pick work jumper work, blasting wprk in hard/soft rocks i/c dewatering in saturated soil up to all leads and lift disposed earth to be levelled and neatly dresses with in all leads and lift as Per directed by the Engineer-in-Charge. |
| 4 | Wire crate of GI Wire filled with boulder with square cut faces against the wire ( Wire crate to be measured and paid for separately) with in all leads and lift to the entire satisfaction of Engineer in charge. |
| 5 | Providing/laying wire crates made of G.I wire filled with boulders with square cut faces against the wire (boulder filling to be measured and paid separately) G.I wire 5mm thick corresponding to SWG-6 15cmx15cm mesh with in all leads and lifts as per direction of the Engineer-in-Charge. |
| 6 | Stone soling properly hand packed filling interstices consolidatimg with spalls and murrum or earth etc 100mm spread thickness (finished work including materials and labour complete in all respect with in all leads and lifts as per direction of the Engineer-in-charge. |
| 7 | Providing and laying cement concrete 1:3:6(1:cement :3 sand:6 graded stone aggregate 20 mm nominal sixe) and curing complete excluding cost of form work in foundation and plinth including carriage of material with in all leads and lifts, as per direction and entire satisfaction of the Engineer-in-Charge. |
| 8 | Random rubble masonary/ Polygonal rubble masonary (Uncoursed/ brought to courses) with hard stone of approved quality in foundation and plinth including levelling up with cement concrete 1:6:12 (1Cement: 6 Sand: 12 Graded stone aggregate 20mm nominal size) in Cement mortor 1:6 (1Cement: 6 Sand) in breast walls and retaining walls. |
| 9 | Brick work using common burnt clay building bricks of approved quality in super structure in cement mortar 1: 4 (1 cement : 4 sand) above plinth level up to floor two level (1st class bricks)with in all leads and lifts as per direction of the Engineer-in-charge. |
| 10 | Half Brick work using common burnt clay building bricks of approved quality in super structure in cement mortar 1: 4 (1 cement : 4 sand) above plinth level up to floor two level (2nd class bricks)with in all leads and lifts as per direction of the Engineer-in-charge. |
| 11 | Providing form work with steel plates 3.15mm thick welded with angle iron in frame 30x30x5mm so as to give a fair finish including centring, shuttering strutting and propping etc. with wooden batten and ballies, in all heights of propping and centring below supporting floor to ceiling not exceeding 4 mtrs and removal of the same for insitu-reinforced concrete and plain concrete work in |
| 12 | In flat surfaces with steel plates such as soffits of suspended floors, roofs, landing and the like floor etc upto all thickness in all leads and lifts as per direction and to the entire satisfaction of Engineer-in-charge. |
| 13 | Providing and laying cement concrete 1:1.5:3(1: cement :1.5 sand :3 graded crushed stone agg. of 20mm. Nominal size) and curing complete excluding the cost of form work and reinforcement for reinforced concrete work in |
| 14 | Suspended floor roofs, landing and shelves and their support balconies, beams, girders, bressumers and contilever upto floor two level with in all leads and lifts as per direction of the Engineer-in-charge. |
| 15 | Providing mild steel/tor steel (reinforcement for RCC work) including bending,binding and placing in positioncomplete in all respect including all leads and lifts as per the direction and entire satisfaction of Engineer-in-Charge. |
| 16 | 15 mm cement plaster in single coat on the rough side of brick/concrete/stone walls for interior plastering up to floor to level i/c arises, internal rounded angles, chamfers and/or rounded angles not exceeding 80 mm in girth and finished even and smooth in c:m 1:6 (1 cement : 6 sand). With in all leads and lifts as per the direction of Engineer in Charge. |
| 17 | WHITE GLAZED TILES 6mm IN FLOORING ,TREAD ,STEPS & LANDING LAID ON A BED 12 mm THICK CEMENT MORTOR (1:3) FINISHED WITH FLUSHED POINTING IN WHITE CEMENT. With in all leads and lifts as per the direction of Engineer in Charge. |
| 18 | WHITE GLAZED TILES 6mm IN SKIRTING,RISERS OF STEPS & DADO LAID ON 12 mm THICK CEMENT MORTOR (1:3) & JOINTED WITH CEMENT SLURRY.With in all leads and lifts as per the direction of Engineer in Charge. |
| 19 | Removing dry or oil bound distemper by washing and scraping and sand papering the wall surface smooth including necessary repairs to scratches complete.With in all leads and lifts as per the direction of Engineer in Charge. |
| 20 | Applying Birla White wall care Putty over plaster surface after throughly brushing the surface free from mortar drops , dust , loose , materails and other to give matters sand parpered smooth to give final matter finish to the surface complete With in all leads and lifts as per the direction of Engineer in Charge. |
| 21 | Distempring (two coat ) with oil bound washable distemper of approved brand and manufacture and of required sdahe on undecorated wall surface to give an even dshgade over and including a priming coat with distemper primer of approved brand and manufacture after thoroughly brushing free from mortar dropping and forign matter and also including preparing the surface even and sand arpered smooth.With in all leads and lifts as per the direction of Engineer in Charge. |
| 22 | Removing old paint or polish from wood and wood based surfaces with paint remover of approved brands and manufacture and making the surface even with Paint remover of approved brand and manufacture With in all leads and lifts as per the direction of Engineer in Charge. |
| 23 | Applying priming coat over new wood and wood based surfaces after and including prepering the surface by thoroughly cleaning oil,grease,dirt and other foreign matter) sand papering and knotting. Readymixed paint brushing with white lead for priming With in all leads and lifts as per the direction of Engineer in Charge. |
| 24 | Painting two coats (excluding priming coat)on new wood and wood based surface under coat with enamel and finishing coating with flat oil paint,brushing to give an even shade including cleaning of all dirt,dust and other foreign matter,sand papering and stopping With ready mixed paint.With in all leads and lifts as per the direction of Engineer in Charge. |
| 25 | Providing wood work in frames of doors, windows, clerestory windows and other frames wrought ,framed and fixed in position. With in all leads and lifts as per the direction of Engineer in Charge. |
| 26 | Providing and fixing panelled glazed or panelled and glazed shutters for doors windows i/c black enamelled iron butt hinges with necessary screws: 40 m.m thick 2nd class deodar wood.With in all leads and lifts as per the direction of Engineer in Charge. |
| 27 | P/F anodized aluminium tower bolt anodized transparent or dyed to required shade and color with screws etc. complete 200x10mm. With in all leads and lifts as per the direction of Engineer in Charge. |
| 28 | P/F anodized aluminium sliding door bolts and nuts screws etc. complete 250x16mm.With in all leads and lifts as per the direction of Engineer in Charge. |
| 29 | P/F anodized aluminium Handles anodized transparent or dyed to required shade and color with screws etc. complete.With in all leads and lifts as per the direction of Engineer in Charge. |
| 30 | 125mm |
| 31 | P/F Oxidized M.S hooks and eyes.With in all leads and lifts as per the direction of Engineer in Charge. |
| 32 | Providing and fixing of Sanitary fitting Water tank 500Ltr 1 Nos, Gi pipe 15mm dia 2 No, GI Elbow 15mm 5 Nos,control valve 1 No, Float valve,Tap long nose 1 No toilet seat weatern type with flush tank 1 No long bends 1 no, angle cock, waste coupling 4 inch 1 no, PVC pipe 110 mm 1 no, PVC Elbow 110 mm 1 no with in all leads and lifts as per the direction of Engineer in Charge. |
| 33 | Finishing wall with water profing cement paint of approved brand and manufacture and of required shade on undecorated wall surfaces (two coats) to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials as per direction of Engineer-in-charge |
| 34 | Providing and fixing of Electricty fitting led bulb (9 watt), switch board 3 M, Switch (6Amp) led tube set, Angle holder 2 ways, celling rose, PVC cassing turlite spektr 200 w LED flood light cool white 6500K color temperature LED Lampl IP 66 waterproof surge protection focus light for factory, Garage parkign, Garden, playground & shop as per market rate with in all leads and lifts as per the direction of Engineer in Charge |
| 35 | Steel work welded in built-up section,trusses and framed work including cutting hoisting, fixing in position and applying a priming coat of red lead paint in grating, framed guard bar, ladders, railing, brackets and similars work with in all leads and lifts as per the direction of Engineer-in Charge. Please Enable Macros to View BoQ information |