Auxiliary Air Reservoir 150 Liters Capacity and Drain Cock Assembly ( for main line ICF coaches ) Drawing No.:- RDSO / CG-K4026, alt . (1) items-1 & 2 Specification: - C -K407 (Rev.-2) Amndt.1 In the relevant Drawing No. CG-K4026, alt . (1) vide Note No.-2 it is mentioned that- \"Inspection andtest shall confirm to the requirements of section III of IS:2825 \" 1- After perusal section III of IS:2825 itis observed that -Inspection of Class II Pressure Vessel may be carried out according to clause 8 (8.1 to8.7.11) in Three stages - Stage I- Material Inspection. Stage II -During Fabrication/Welding. Stage III - After Fabrication complete and finished Pressure Vessel. [ Warranty Period: 30 Months after the date of delivery ][Quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total PO value variation Permitted: Max 8 lacs ] ]
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.