|
| 1 | Dismantling of 2 Nos. 62.5 KVA DG sets complete with batteries, exhaust pipes, cables, panel (inside canopy) from RSU Chirag Delhii/c dismantling of all cable, earthing & exhaust pipe connection etc. complete as reqd. |
| 2 | Dismantling of 3x7.5 TR Ductable AC units from RSU Chirag Delhii/c dismantling ofindoor & outdoor units, piping, cable tray, drain pipe and cable, connection etc. complete as reqd. |
| 3 | Dismantling of one 1x95 KVA AVR from RSU Chirag Delhii/c dismantling of all type cables, earthing connection etc. complete as reqd. |
| 4 | Dismantling of the following material from RSU Chirag Delhi i/c dismantling of all types of cables/conduits, earthing connection etc. complete as reqd.: Capacitor Panel, AVR By Pass Panel, L T Panel, AC Panel,Fire Panel, wall fans, Fittings, Phase reversal, Change Over switches, Distribution Boards, Cable Trays, Cables, Ceiling/wall fans,Exhaust Fans, and Fire Detectors etc complete as required. |
| 5 | Loading & Unloading of DG sets with associate material i/c transportation from RSU Chirag Delhi to T.E. Bldg. Nehru Place by heavy labour, chain pulley/hydra etc. as reqd. |
| 6 | Loading & Unloading of 3x7.5 TR Ductable AC units i/c indoor units & outdoor units, piping, cable tray and cable, etc. i/c transportation from RSU Chirag Delhi to T.E. Bldg. Nehru Place, by heavy labour, chain pulley/hydra etc. as reqd. |
| 7 | Loading & Unloadingof 1x95 KVA AVR with associated material etc.complete as reqd. i/c Transportation from RSU Chirag Delhi to T.E. Bldg. Nehru Place, by heavy labour, chain pulley/hydra etc. as reqd. |
| 8 | Shifting of the following material from RSU Chirag Delhi i/c loading of all types of cables/conduits, earthing connections, Capacitor Panel, AVR By Pass Panel, LT Panel, AC Panel,Fire Panel, wall fans, Fittings, Phase reversal, Change Over switches, Distribution Boards, Cable Trays, Cables, Ceiling/wall fans,Exhaust Fans, and Fire Detectors etc. unloading at T.E. Bldg., Nehru Place and location as per the directions of Engineer-in-charge. Note: 1) The agency has to prepare a detailed Inventory of all items to be dismantled i/c quantity before dismantling and shifting to other site and submit it to the Engineer-in-charge for taking gate pass. 2) The agency is fully responsible for any misplaced/short material receipt from RSU site and suitable recovery will be made for any such item. 3) The cables will be rolled into loops and approximate length should be mentioned in inventory. 4) The dismantled items alongwith inventory will be handed over to Engineer-in-charge, after shifting the material at site. |