| 1 | Dismandling the old RR stone at the rate inculiding labour charges etc.complete complaying with standard specification |
| 2 | Dismandling the Rcc slab at the rate inculiding labour charges etc.cpmplete complaying with standard specification |
| 3 | Earthwork excavating for open excavation and depositing on Bank within initial lead of 10mt and lift of 2m in Hard stiff clay , stiff black cotton , hard red earth, shales ,murram, gravel , stoney earth and earth mixed with small size boulders etc., complete complying with standard specification. |
| 4 | Cement concrete in 1:4:8[one cement and four m. sand and Eight aggregate ] using 40 mm size ISS grade machine crushed chips including the cost of mixinglaying curing etc., complete complying with standard specification. |
| 5 | Supplying and Erecting Steel Centering for sides and soffits including supports and strutting plane surfaces such as RCC Slabs, Rectangular Beams, TEE or ELL Beams, Lintels, Bed blocks, Staircase waist and Landing slabs, Landing Beams, canopy etc., with all cross brasings using mild steel sheets of size 90cmx60cm and 10 gauge stiffened with welded MS angles of size 25mmx25mmx3mm for boarding laid over silver oak (CW) joists of size 10cmx6.5 cm spaced at about 90cm c/c and supported by causrina props of 10cm to 13cm dia spaced at 75cm c/c etc., complete complying with standard specification and as Directed . |
| 6 | Below 1 metre |
| 7 | Reinforced cement concrete in 1:11/2:3[One cement ,One and half m. sand and Three aggregate ] using 20 mm size IRC grade machine crushed chips and excludingcost of reinforcement and centering works and including the cost of mixing,laying , curing ,and etc.,complete complying with standard specification . |
| 8 | Supplying and fabrication of steel placing in position of RTS or MS rods and the cost including all materials and labour charges with conveyance charges to work site and labour charges etc.complete complying with standard specification- |
| 9 | Supplying and fabrication of steel placing in position of RTS or MS rods and the cost including all materials and labour charges with conveyance charges to work site and labour charges etc.complete complying with standard specification- |
| 10 | Plastering in cm1:3 mix using 12mm thick at the rate inculiding cost and conveyance of all materials and labour charges etc.complete copmlaying with standard specification |
| 11 | Plastering in cm1:5 mix using 12mm thick at the rate inculiding cost and conveyance of all materials and labour charges etc.complete copmlaying with standard specification |
| 12 | Plastering in cm1:3 mix using 20mm thick at the rate inculiding cost and conveyance of all materials and labour charges etc.complete copmlaying with standard specification |
| 13 | Supply and fixing of cost iron manohole cover with approved quality and the rate inculiding cost and conveyance of all materials and labour charges etc.complete copmlaying with standard specification |
| 14 | Distembering and two coat using emulision paint with approved colour paintquality and the rate inculiding cost and conveyance of all materials and labour charges etc.complete copmlaying with standard specification |
| 15 | Supplying and delivery of following dia \"B\" class GI Pipe , with standard weight and brand and the rate including all cost and conveyance of all materials to site and Labour charges etc complete complying with standard specification. |
| 16 | 50mm B\"Class GI pipe |
| 17 | Laying and jointing G.I pipes and G.I specials to proper gradient and alignment and testing the pipe with water and the rate including cost and conveyance of all charges etc., complete. |
| 18 | 50mm B\"Class GI pipe Please Enable Macros to View BoQ information |