|
| 1 | Procurement Of Ips |
| 2 | Supply, Installation & Commissioning of SMPS based Integrated Power Supply System (IPS) in RE section for 4 Line as per RDSO specification no. RDSO/SPN/165/2023 Ver 4.0 or latest along with LMLA battery bank of 110V/200AH as per drg attached without AFTC RE area Lenght of Cable requirement form IPS to ASM room is 50 mtrs and lenght of cable requirement from IPS to battery room is50 mtrs. [ Warranty Period: 30 Months after the date of delivery ][Quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total PO value variation Permitted: Max 8 lacs ] ]SENIOR SECTION Delhi 1.00 Set |
| 3 | Supply, Installation and commissioning of IPS as per RDSO Spec. No. RDSO/SPN/165/2023 Ver. 4 Amd. 1 or latest. [ Warranty Period: 30 Months after the date of delivery ][Quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total PO value variation Permitted: Max 8 lacs ] ] |
| 4 | Supply, Installation and commissioning of SMPS based integrated power supply system for Station as per RDSO/SPN/165/2023 Ver. 4.0 or Latest. The Battery shall be 300AH. Cable requirement shall be 30 mtrs from IPS to ASM room and 10 mtrs from IPS to Battery room. [ Warranty Period: 30 Months after the date of delivery ][Quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total PO value variation Permitted: Max 8 lacs ] ] |
| 5 | Supply, Installation and Commissioning of SMPS based Integrated Power Supply System for IBS and LC gate in RE Area as per RDSO Specn. No. RDSO/SPN/165/2023 version 4.0 Dt. 20.06.2024 or latest and DRG No. CSTE 61554 2 to 7 along with VRLA battery cells of 200AH. [ Warranty Period: 30 Months after the date of delivery ][Quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total PO value variation Permitted: Max 8 lacs ] ] |
| 6 | Supply, Installation and commissioning of SMPS based Integrated Power Supply (IPS) system as per RDSO Specn no. RDSO/SPN/165/2023 ver 4.0 Amendment 1.0 or latest along with 300 AH VRLA Battery Cells. [ Warranty Period: 30 Months after the date of delivery ][Quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total PO value variation Permitted: Max 8 lacs ] ] |
| 7 | Supply, Installation and commissioning of SMPS based Integrated Power Supply (IPS) system as per RDSO Specn no. RDSO/SPN/165/2023 ver 4.0 Amendment 1.0 or latest along with 300 AH VRLA Battery Cells. [ Warranty Period: 30 Months after the date of delivery ][Quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total PO value variation Permitted: Max 8 lacs ] ] |
| 8 | Supply and commissioning of IPS as per RDSO /SPN/165/2023 Ver.4.0 or latest amendment and as per dig. Attached (Annexure-LIX) and commissioning of IPS as per RDSOs letter no.STS/E/IPS/Gant. Dated 03.04.2008). [ Warranty Period: 30 Months after the date of delivery ][Quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total PO value variation Permitted: Max 8 lacs ] ] |
| 9 | Supply and commissioning of IPS as per RDSO/SPN/165/2023 Ver. 4.0 or latest amendment and as per drg. attached (RDSO Drg. No.SDO/IPS/PI-6L/RE/004 and commissioning of IPS as per RDSOs letter no.STS/E/IPS/Genl. Dated:03.04.2008),drg attached. [ Warranty Period: 30 Months after the date of delivery ][Quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total PO value variation Permitted: Max 8 lacs ] ] |
| 10 | SMPS based Integrated Power supply (IPS) up to 6 Lines in RE area confirming to RDSO Specn. No. RDSO/SPN/165/2023 Version 4.0 with latest amendment and to the Sketch attached in annexure B including power supply for axle counters (hassdac), Data logger and EI module ufsbi. IPS should be supplied with uncharged 55 Nos. low maintenance cells 2V 300 Ah cells. (Whenever installation &commissioning is required, firm will charge cells and commission the same with minimum one month notice period. (STR No. SIQ 0110 Ver 3.0) [ Warranty Period: 30 Months after the date of delivery ][Quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total PO value variation Permitted: Max 8 lacs ] ] |
| 11 | Supply, Installation and commissioning of SMPS based integrated power supply system for Station as per RDSO/SPN/165/2023 Ver. 4.0 or Latest. The Battery shall be 300 AH. Cable requirement shall be 30 mtrs from IPS to ASM room and 10 mtrs from IPS to battery room. [ Warranty Period: 30 Months after the date of delivery ][Quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total PO value variation Permitted: Max 8 lacs ] ] |
| 12 | Supply, Installation and commissioning of SMPS based integrated power supply system for Station as per RDSO/SPN/165/2023 Ver. 4.0 or Latest. The Battery shall be 300 AH. Cable requirement shall be 30 mtrs from IPS to ASM room and 10 mtrs from IPS to battery room. [ Warranty Period: 30 Months after the date of delivery ][Quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total PO value variation Permitted: Max 8 lacs ] ] |
| 13 | Supply Installation and Commissioning of SMPS based Integrated power supply IPS for station as per specification RDSO/SPN/165/2023 version 4.0 or latest. [ Warranty Period: 30 Months after the date of delivery ][Quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total PO value variation Permitted: Max 8 lacs ] ] |
| 14 | Supply, Installation and Commissioning of SMPS based Integrated Power Supply System for IBS and LC gate in RE Area as per RDSO Specn. No. RDSO/SPN/165/2023 version 4.0 Dt. 20.06.2024 or latest and DRG No. CSTE 61554 2 to 7 along with VRLA battery cells of 200AH. [ Warranty Period: 30 Months after the date of delivery ][Quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total PO value variation Permitted: Max 8 lacs ] ] |
| 15 | Supply, Installation and commissioning of SMPS based integrated power supply system for Station as per specification RDSO/SPN/165/2023 Ver. 4.0 or Latest. [ Warranty Period: 30 Months after the date of delivery ][Quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total PO value variation Permitted: Max 8 lacs ] ] |
| 16 | Supply, Installation and commissioning of SMPS based integrated power supply system for Station as per specification RDSO/SPN/165/2023 Ver. 4.0 or Latest. [ Warranty Period: 30 Months after the date of delivery ][Quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total PO value variation Permitted: Max 8 lacs ] ] |
| 17 | Supply, Installation and commissioning of SMPS based Integrated power supply IPS for station as per specification RDSO/SPN/165/2023 version 4.0 or latest. [ Warranty Period: 30 Months after the date of delivery ][Quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total PO value variation Permitted: Max 8 lacs ] ]SSE/C/SIGNAL/JALLANDHAR Punjab 1.00 Set |
| 18 | Supply, installation and commissioning of SMPS based Integrated power supply system for station as per RDSO/SPN/165/2023 Ver. 4.0 or latest. The Battery shall be 300 AH. Cable requirement shall be 30 mtrs from IPS to ASM room and 10 mtrs from IPS to battery room. [ Warranty Period: 30 Months after the date of delivery ][Quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total PO value variation Permitted: Max 8 lacs ] ] |
| 19 | Supply, installation and commissioning of SMPS based Integrated power supply system for station as per RDSO/SPN/165/2023 ver. 4.0 or latest. The Battery shall be 300 AH. Cable requirement shall be 30 mtrs from IPS to ASM room and 10 mtrs from IPS to battery room. [ Warranty Period: 30 Months after the date of delivery ][Quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total PO value variation Permitted: Max 8 lacs ] ] |
| 20 | Supply, Installation & Commissioning of SMPS based Integrated Pwer Supply system (IPS) in RE section for 4 line as per RDSO specification no. RDSO/SPN/165/2023, VER- 4.0 or LATEST along with LMLA battery bank of 110V/200AH as per drg no attached without AFTC RE area length of cable requirement from IPS to ASM room is 50 mtrs and length of cable requirement from IPS to battery roomis 50 mtrs. [ Warranty Period: 30 Months after the date of delivery ][Quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total PO value variation Permitted: Max 8 lacs ] ]SENIOR SECTION Delhi 1.00 Set |
| 21 | SMPS based Integrated Power Supply (IPS) for Railway Signalling as per RDSO/SPN/165/2023 version 4.0 or amendment 1. [ Warranty Period: 30 Months after the date of delivery ][Quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total PO value variation Permitted: Max 8 lacs ] ]Page 4 of 18 Run Date/Time: 02/01/2026 16:30:18STORES/NORTHERN RLYTENDER DOCUMENT |
| 22 | Supply, Installation & Commissioning of SMPS based Integrated Power Supply system (IPS) in RE section for 6 line as per RDSO specification no. RDSO/SPN/165/2023 Ver. 4.0 or latest along with LMLA battery bank of 110V/300AH as per drg no. attached without AFTC RE area. Length of Cable requirement from IPS to ASM room is 50 mtrs and length of cable requirement from IPS to battery room is 50 mtrs. [ Warranty Period: 30 Months after the date of delivery ][Quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total PO value variation Permitted: Max 8 lacs ] ] |
| 23 | Supply and commissioning of IPS as per RDSO/SPN/165/2023 Ver.4.0 or latest amendment and as per drg. attached (RDSO Drg. No.SDO/IPS/PI-6L/RE/004 and commissioning of IPS as per RDSOs letter no.STS/E/IPS/Genl.Dated:03.04.2008),drg attached. [ Warranty Period: 30 Months after thedate of delivery ][Quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total PO value variation Permitted: Max 8 lacs ] ] |
| 24 | Supply and commissioning of IPS as per RDSO Specn. No. RDSO/SPN/165/2023 Ver. 3.0 or latest amendment. [ Warranty Period: 30 Months after the date of delivery ][Quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total PO value variation Permitted: Max 8 lacs ] ] |
| 25 | Supply and commissioning of IPS as per RDSO/SPN/165/2023 Ver.4.0 or latest amendment and as per drg. attached (RDSO Drg. No.SDO/IPS/PI-6L/RE/004 and commissioning of IPS as per RDSOs letter no.STS/E/IPS/Genl.Dated:03.04.2008),drg attached. [ Warranty Period: 30 Months after thedate of delivery ][Quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total PO value variation Permitted: Max 8 lacs ] ] |
| 26 | Supply and commissioning of IPS as per RDSO /SPN/165/2023 Ver. 4.0 or latest amendment and as per dig. Attached (Annexure-LIX) and commissioning of IPS as per RDSOs letter no. STS/E/IPS/Gant. Dated 03.04.2008). [ Warranty Period: 30 Months after the date of delivery ][Quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total PO value variation Permitted: Max 8 lacs ] ] |
| 27 | Supply and commissioning of IPS as per RDSO/SPN/165/2023 Ver. 4.0 or latest amendment and as per drg. attached (RDSO Drg. No.SDO/IPS/PI-4L/RE/002 and commissioning of IPS as per RDSOs letter no.STS/E/IPS/Genl. Dated:03.04.2008). [ Warranty Period: 30 Months after the date of delivery ][Quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total PO value variation Permitted: Max 8 lacs ] ] |
| 28 | Supply, Installation, Testing & Commissioning of SMPS based Integrated Power Supply (IPS) in RE section for 6 Line as per RDSO specification no. RDSO/SPN/165/2023 Ver.4 or latest Amendment as per detailed description attached as Annesure along with VRLA battery bank of 110V/300AH. [ Warranty Period: 48 Months after the date of delivery ][Quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total PO value variation Permitted: Max 8 lacs ] ] |
| 29 | Supply, installation & Commissioning of SMPS based Integrated Power Supply system (IPS) in RE section for LC Gate as per RDSO specification No. RDSO/SPN/165/2023 version 4.0 or latest along with LMLA battery bank of 110V/200AH as per drg no. attached without AFTC RE area. Length of Cable requirement from IPS to ASM room is 50 mtrs and length of cable requirement from IPS to batteryroom is 50 mtrs. [ Warranty Period: 30 Months after the date of delivery ][Quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total PO value variation Permitted: Max 8 lacs ] ] |
| 30 | Supply, Installation & Commissioning of SMPS based Integrated Power Supply (IPS) system as per RDSO specification no. RDSO/SPN/165/2023 Ver. 4.0 Amendment 1.0 or latest along with 300AH VRLA Battery Cells. [ Warranty Period: 30 Months after the date of delivery ][Quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total PO value variation Permitted: Max 8 lacs ] ] |
| 31 | Supply, Installation & Commissioning of SMPS based Integrated Power Supply system (IPS) in RE section for 6 line as per RDSO specification no. RDSO/SPN/165/2023 Ver. 4.0 or latest along with LMLA battery bank of 110V/300AH as per drg no. attached without AFTC RE area. Length of Cable requirement from IPS to ASM room is 50 mtrs and length of cable requirement from IPS to battery room is 50 mtrs. [ Warranty Period: 30 Months after the date of delivery ][Quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total PO value variation Permitted: Max 8 lacs ] ] |
| 32 | Supply and commissioning of 4 line IPS as per RDSO/SPN/165/2023 Ver.4.0 amdt. 1 or latest amendment and as per drg. attached (RDSO Drg. No.SDO/IPS/PI-4L/RE/002. [ Warranty Period: 30 Months after the date of delivery ][Quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total PO value variation Permitted: Max 8 lacs ] ] |
| 33 | Supply and commissioning of IPS as per RDSO/SPN/165/2023 Ver.4.0 or latest amendment and as per drg. attached (RDSO Drg. No.SDO/IPS/PI-6L/RE/004 and commissioning of IPS as per RDSOs letter no.STS/E/IPS/Genl.Dated:03.04.2008),drg attached [ Warranty Period: 30 Months after the date of delivery ][Quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total PO value variation Permitted: Max 8 lacs ] ] |
| 34 | Supply and commissioning of IPS as per RDSO/SPN/165/2023 Ver. 4.0 or latest amendment and as per drg. attached (RDSO Drg. No.SDO/IPS/PI-6L/RE/004 and commissioning of IPS as per RDSOs letter no.STS/E/IPS/Genl.Dated:03.04.2008),drg attached [ Warranty Period: 30 Months after thedate of delivery ][Quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total PO value variation Permitted: Max 8 lacs ] ] |
| 35 | Supply, Installation and Commissioning of SMPS based Integrated Power Supply System for IBS and LC gate in RE Area as per RDSO Specn. No. RDSO/SPN/165/2023 version 4.0 Dt. 20.06.2024 or latest and DRG No. CSTE 61554 2 to 7 along with VRLA battery cells of 200AH. [ Warranty Period: 30 Months after the date of delivery ][Quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total PO value variation Permitted: Max 8 lacs ] ] |
| 36 | Supply installation and commissioning of SMPS BASED IPS confirming to RDSO specification No. RDSO/SPN/165/2023 Ver. 4.0 Amdt. 1 or latest as per attached drawing for IPS up to 6 Lines along with 300 AH LMLA battery. [ Warranty Period: 30 Months after the date of delivery ][Quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total PO value variation Permitted: Max 8 lacs ] ] |
| 37 | SMPS based Integrated Power Supply (IPS) for Railway Signalling as per RDSO/SPN/165/2023 Version 4.0 with Amendment 1. [ Warranty Period: 30 Months after the date of delivery ][Quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total PO value variation Permitted: Max 8 lacs ] ] |
| 38 | Supply, installation and commissioning of SMPS based Integrated power supply system (IPS) in RE section as per RDSO/SPN/165/2023 ver. 4.0 or latest along with battery bank of 110V/300AH. Cable requirement from IPS to ASM room is 30 mtrs and 30 mtrs from IPS to battery room. [ Warranty Period: 30 Months after the date of delivery ][Quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total PO value variation Permitted: Max 8 lacs ] ] |
| 39 | Supply, installation and commissioning of SMPS based integrated power supply system for station as per RDSO/SPN/165/2023 ver. 4.0 or latest. The Battery shall be 300 AH. Cable requirement shall be 30 mtrs from IPS to ASM room and 10 mtrs from IPS to battery room. [ Warranty Period: 30 Months after the date of delivery ][Quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total PO value variation Permitted: Max 8 lacs ] ] |
| 40 | Supply, Installation and commissioning of SMPS based integrated power supply system for Station as per specification RDSO/SPN/165/2023 Ver. 3.0 or Latest. [ Warranty Period: 30 Months after the date of delivery ][Quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total PO value variation Permitted: Max 8 lacs ] ] |
| 41 | Supply and commissioning of IPS as per RDSO/SPN/165/2023 Ver. 4.0 or latest amendment and as per drg. attached (RDSO Drg. No. SDO/IPS/PI-6L/RE/004 and commissioning of IPS). [ Warranty Period: 30 Months after the date of delivery ][Quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total PO value variation Permitted: Max 8 lacs ] ] |
| 42 | SUPPLY OF SMPS BASED MINI INTEGRATED POWER SUPPLY SYSTEM for LC gate as per RDSO spec no. RDSO/SPN/165/2023 ver.4.0 or latest amendment as per guide line of RDSO, along with 110 V low maintenance batteries, surge protection devices including Commissioning of IPS as per RDSO Letter no. STS/E/IPS/GENLdt-03.04.2008, Item no. A & C. [ Warranty Period: 30 Months after the date of delivery ][Quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total PO value variation Permitted: Max 8 lacs ] ] |
| 43 | Supply and commissioning of IPS as per RDSO/SPN/165/2023 Ver.4.0 or latest amendment and as per drg. attached (RDSO Drg. No.SDO/IPS/PI-6L/RE/004 and commissioning of IPS). [ Warranty Period: 30 Months after the date of delivery ][Quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total PO value variation Permitted: Max 8 lacs ] ] |
| 44 | Supply and Commissioning of IPS (4 Line) as Per RDSO/SPN/165/2023 ver.4.0 Or Latest Amendment and as Per Drg. Enclosed and Commissioning of IPS as Per RDSOs Letter No. STS/E/IPS/GENL. dt. 03.04.2008 [ Warranty Period: 30 Months after the date of delivery ][Quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total PO value variation Permitted: Max 8 lacs ] ]Page 8 of 18 Run Date/Time: 02/01/2026 16:30:18STORES/NORTHERN RLYTENDER DOCUMENT |
| 45 | Supply installation and commissioning of SMPS BASED IPS confirming to RDSO specification No. RDSO/SPN/165/2023 Ver. 4.0 Amdt. 1 or latest as per attached drawing for IPS up to 6 Lines along with 300 AH LMLA battery. [ Warranty Period: 30 Months after the date of delivery ][Quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total PO value variation Permitted: Max 8 lacs ] ] |
| 46 | Supply Installation and Commissioning of SMPS based LC gate IPS conforming to RDSO Specn. No. RDSO/SPN/165/2023 Ver 4.0 with amendment 1 or latest amendment and sketch no. SDO/IPS/LC/07 IPS for interlocked LC-Gate RE/NRE area along with 200AH LMLA battery. [ Warranty Period: 30 Months after the date of delivery ][Quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total PO value variation Permitted: Max 8 lacs ] ] |
| 47 | Supply and commissioning of IPS as per RDSO/SPN/165/2023 Ver.4.0 or latest amendment and as per drg. attached (RDSO Drg. No.SDO/IPS/PI-6L/RE/004 and commissioning of IPS. [ Warranty Period: 30 Months after the date of delivery ][Quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total PO value variation Permitted: Max 8 lacs ] ] |
| 48 | Supply, Installation & Commissioning of SMPS based Integrated Power Supply system (IPS) in RE section as per RDSO specification no. RDSO/SPN/165/2023 Ver.4.0 or latest along with LMLA battery bank of 110V/300AH as per attached drawing up to 4 lines. [ Warranty Period: 30 Months after the date of delivery ][Quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total PO value variation Permitted: Max 8 lacs ] ] |
| 49 | Supply, Installation and Commissioning of SMPS based Integrated power supply (IPS) system as per RDSO Spec. No.RDSO/SPN/165/2023 version 4.0 Amendment 1.0 or latest along with 300 AH VRLA Battery Cells. [ Warranty Period: 30 Months after the date of delivery ][Quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total PO value variation Permitted: Max 8 lacs ] ] |
| 50 | Supply & Installation of SMPS based Integrated Power Supply System (IPS) as per RDSO specification No. RDSO/SPN/165/ 2023 Ver. 4.0 or latest along 110 V, 300 AH,Low maintenance batteries as per RDSO Specn. No: IRS: S-88/2004 or latest [ Warranty Period: 30 Months after the date of delivery ][Quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total PO value variation Permitted: Max 8 lacs ] ] |
| 51 | Supply, Installation and Commissioning of SMPS based Integrated power supply (IPS) system as per RDSO Spec. No.RDSO/SPN/165/2023 version 4.0 Amendment 1.0 or latest along with 300 AH VRLA Battery Cells. [ Warranty Period: 30 Months after the date of delivery ][Quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total PO value variation Permitted: Max 8 lacs ] ] |
| 52 | Supply, Installation and Commissioning of SMPS based Integrated power supply (IPS) system as per RDSO Spec. No.RDSO/SPN/165/2023 version 4.0 Amendment 1.0 or latest along with 300 AH VRLA Battery Cells. [ Warranty Period: 30 Months after the date of delivery ][Quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total PO value variation Permitted: Max 8 lacs ] ] |
| 53 | Supply, Installation and Commissioning of SMPS based Integrated power supply (IPS) system as per RDSO Spec. No.RDSO/SPN/165/2023 version 4.0 Amendment 1.0 or latest along with 300 AH VRLA Battery Cells. [ Warranty Period: 30 Months after the date of delivery ][Quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total PO value variation Permitted: Max 8 lacs ] ] |