| 1 | Laying and Jointing PVC Pipe. Heading |
| 2 | Earth work in rough excavation, banking excavated earth in layers notexceeding 20 cm in depth, breaking clods, watering, rolling each layerwith ½ tonne roller or wooden or steel rammers, and rolling every 3rd andtop-most layer with power roller of minimum 8 tonnes and dressing up inembankments for roads, flood banks, marginal banks and guide banks orfilling up ground depressions, lead upto 50 m and lift upto 1.5 m : |
| 3 | Dewatering Charge |
| 4 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-incharge.All kinds of soil |
| 5 | Providing concrete for plain concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 |
| 6 | Construction of un-reinforced, plain cement concrete pavement thicknes as per drawing over a prepared sub base with 43 grade cement as per clause 1501.2.2 M-30 (grade ) coarse sand fine aggregates confirming to I.S. 383 maximum size of coarse aggregate not exceeding 25 mm , mixed in a concrete mixture of not less then 0.2 cum capacity using approved mixed design lead in approved fixed side form works (steel channel,laying and fixing of 125micron thick polythin film wedges,steel plates including levelling the form works as per dwawing ), spreading the concrete with shovel ,rakes compacted using plate vibrator and finished in continious operation including provision of contraction and expension ,contruction joints applying debonding strip as approved, curring of concrete slab for fourteen days curring compound (where specified) and water finishing to lines and grade as per drawing and technical specification clase 1501. |
| 7 | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203. |
| 8 | Supplying, fitting, and placing M.S bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202. |
| 9 | Steel work welded in built up sections/ framed work, including cutting,hoisting, fixing in position and applying a priming coat of approved steelprimer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gatesand similar works |
| 10 | R.C.C. Standards post/ struts/rails/ pales of mix 1:1.5:3 (1cement : 1.5 coarsesand : 3 graded stone aggregate 12.5 mmnominal size) with wooden plugs or 6 mm bar nibs whereverrequired as per direction of Engineer-in- charge (cost of earthworks in excavation, concrete works in foundation to be paidseparately). |
| 11 | Fencing with R.C.C. post placed at required distance, embedded in cementconcrete blocks, every 15th post, last but one end post and corner postshall be strutted on both sides and end post one side only, provided withhorizontal lines and two diagonals of barbed wire weighing 9.38 kg per 100metres (minimum), between the two posts fitted and fixed with G.I. stapleson wooden plugs or G.I. binding wire tied to 6 mm bar nibs fixed whilecasting the post (cost of R.C.C. posts, struts, earth work and concrete tobe paid for separately) :- Payment to be made per metre cost of total lengthof barbed wire used. |
| 12 | Laying Brick soling layer on prepared sub-grade with brick on end edging according to lines, graded and cross-section shown on the drawing filling joint with sand and earth, spresding 25 mm thick layer of earth over brick soling, watering and rolling the same with three wheeled road roller 80-100 kN as pes Technical Specification Clause 412 |
| 13 | Brick masonry work in cement mortar in foundation complete excluding pointing and plastering as per drawing and technical specifications Clauses 600, 1202 & 1203 |
| 14 | Plastering with cement mortar (1:4), 12 mm thick on brickwork in substructure as per technical specification Clauses 613.4 & 1204 |
| 15 | Providing and applying white cement based putty of average thickness1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete. |
| 16 | Finishing walls with Acrylic Smooth exterior paint of required shade : New work (Two or more coat applied @ 1.67 ltr/10 sqmover and including priming coat of exterior primer applied@ 2.20 kg/10 sqm) |
| 17 | Providing and Laying Reinforced Cement Concrete Pipe NP3 as per design in Single Row |
| 18 | Coursed rubble masonry (Second sort) with hard stone in foundation andplinth with :Cement mortar 1:6 (1 cement : 6 coarse sand) |
| 19 | 40 mm thick rubbed stone flooring over 20 mm (average) thick base ofcement mortar 1:5 (1 cement : 5 coarse sand) with joints 3 mm thick,side buttered with cement mortar 1:2 (1 cement : 2 stone dust) admixedwith pigment to match the shade of stone and pointing with same mortar. |
| 20 | Providing and stacking of Bottle palm of ht. 270-300 cm bottom girth 40-50 cm well developed in big HDPE bags as per direction of the officer-in-charge |
| 21 | Providing and displaying of Areca Palm having ht. 2.40 m to 2.70 m with 12 to 14 suckers, well developed, fresh and healthy with lush green foliage in 35 cm size of Bucket type cement pots & as per direction of the officer-in-charge |
| 22 | Providing and displaying of Raphis palm specimen having ht. 1.50 m to1.65 m with 40 to 50 lush green suckers, well developed, fresh & healthyfoliage leaves in 40 cm size of Earthen Pot/Chali/Tray & as per direction ofthe officer-in-charge |
| 23 | Providing and stacking of Ficus religiosa (Peepal) of height 150-165 cm. in big poly bags of size 30 cm as per direction of the officer-in-charge. |
| 24 | Providing and stacking of Mangifera indica (Mango-grafted ) of height 60-75 cm. in big poly bag of size 25 cm as per direction of the officer-in-charge. |
| 25 | Providing and stacking of Azadirachta indica ( Neem ) of height 120-130cm in big polybag of size 25 cm as per direction of the officer-in-charge. |
| 26 | Providing and stacking of Bassia latifolia (Mahua) of height 90-105 cm. in big polybag of size 25 cm as per direction of the officer-in-charge |
| 27 | Providing and stacking of Polyalthia longifolia (Ashok) of height 180-195 cm. in gunny bag of size 30 cm as per direction of the officer-in-charge. |
| 28 | Digging holes in ordinary soil and refilling the same with the excavatedearth mixed with manure or sludge in the ratio of 2:1 by volume (2 parts ofstacked volume of earth after reduction by 20% : 1 part of stacked volumeof manure after reduction by 8%) flooding with water, dressing includingremoval of rubbish and surplus earth, if any, with all leads and lifts (cost ofmanure, sludge or extra good earth if needed to be paid for separately) |
| 29 | Providing & laying Selection no. 1 doob grass turf with earth 50mm to60mm thickness of existing ground prepared with proper level and rammingwith required tools wooden and than rolling the surface with light rollermake the surface smoothen and light watering the same maintenance for30 days or more till the grass establish properly,as per direction of officerin charge |
| 30 | Supplying and stacking at site dump manure from approved source,including carriage upto 5 km lead complete (manure measured in stackswill be reduced by 8% for payment) |
| 31 | supply & fixing of LOOM SOLAR Solar Street Light Luminaire, Power of light source 30 Watt The color temperature of white LEDs used in the system 5500 degree K 6500 degree K.Number of light source 1,Luminaire System Efficacy - Lumen output - (Lumen/watt) 125,The temperature of heat sink 20 degree centigrade above ambient temperature during operation,CRI(%) 70,LED chip Efficacy (Lumen/watt) 160,Power of light source 30 Watt,Light source White LED Generic Solar Street Light Luminaire shall conform to MNRE specification , Solar Street Light (LED based) consist of white LED luminaire ( LED + Driver) |
| 32 | survey and marking |
| 33 | Cleaning and disposal of sludge Hydaulic Excavator 0.90 cum |
| 34 | Cleaning and disposal of sludge Tractor with trolley |
| 35 | S/F of sign board Please Enable Macros to View BoQ information |