|
| 1 | Description of Items : |
| 2 | Design, supply, deliveryat site, installation, testing and commissioning of 6 passengers lift in the machine room with gearless machine for G+2 floors with AC VVVF drive control for constant load of 408 Kg respectively traveling @ 1.0 mps with Simplex operation without attendant, car position indicators, battery operated alarm bell and emergency light, stainless steel finish car interior, power operated center opening automatic sliding stainless steel doors for car entrance and hoist way entrance etc. including all steel, civil and electrical materials as specified such as machine beams, buffer support channels, fascia plates, landing sills, pit ladder metal screen in elevator pit etc., as per the specification including cost of all civil and electrical works required for installation of elevator in the existing lift well and machine room, scaffolding, cutting holes, grouting and making good to damages in wall, floor, ceiling etc. for fixing accessories, foundation bolts etc., hoist way wiring and other associated Wirings including Fireman\"s switch complete in all respect as per direction of Engineer-in-charge. the Lift car should be fabricated by utilising maximum Space in the lift well. (i.e. moving car should be customized according to lift well size only). Warranty of the lift should be 3 years from the date of handing over of the lift |
| 3 | Dismantling of old lifts |
| 4 | Civil and Electrical works as per the site conditions |
| 5 | Buyback Amount for disposal ( loading/unloading, freight charges etc in the scope of contractor only) |
| 6 | Supply of all required spares and Annual Comprehensive Maintenance Contract (AMC) after the expiry of the guarantee period of 3 YEARS including cost, conveyance, loading, unloading, royalties, taxes of all materials and cost of all labors, sundries etc., as per the direction of the Engineer -in -charge. 1st Year CAMC charges |
| 7 | Supply of all required spares and Annual Comprehensive Maintenance Contract (AMC) after the expiry of the guarantee period of 3 YEARS including cost, conveyance, loading, unloading, royalties, taxes of all materials and cost of all labors, sundries etc., as per the direction of the Engineer -in -charge. 2nd Year CAMC Charges |
| 8 | Supply of all required spares and Annual Comprehensive Maintenance Contract (AMC) after the expiry of the guarantee period of 3 YEARS including cost, conveyance, loading, unloading, royalties, taxes of all materials and cost of all labors, sundries etc., as per the direction of the Engineer -in -charge.3rd Year CAMC Charges |
| 9 | Supply of all required spares and Annual Comprehensive Maintenance Contract (AMC) after the expiry of the guarantee period of 3 YEARS including cost, conveyance, loading, unloading, royalties, taxes of all materials and cost of all labors, sundries etc., as per the direction of the Engineer -in -charge.4th Year CAMC Charges |
| 10 | Supply of all required spares and Annual Comprehensive Maintenance Contract (AMC) after the expiry of the guarantee period of 3 YEARS including cost, conveyance, loading, unloading, royalties, taxes of all materials and cost of all labors, sundries etc., as per the direction of the Engineer -in -charge.5th Year CAMC Charges |