Set of Nitrile bonded cork gasket for three phase loco main Transformer, one set consisting of 14 items in 78 nos. Materials should be as per RDSO TC. No.- ELRS/TC/0076 (Rev.-2 or latest) Dt.-1.10.2019 & SKTECH No.- ELW/BSL/3-PH/SK No. 303 (Alt.-1 or latest). Item Details as per SKTECH No.- ELW/BSL/3-PH/SK No. 303 (Alt.-1 or latest). (Make ABB, BHEL, CGL, EMCO, High Volt, Stesalit, Bombay oilSeal, NU-Cork, Cortica, Talbros, Bharat Corrub, Indian Cork). Shelf life of this item is 24 months (2 years) being the material is Nitrile and should be delivered within 6 months after manufacturing date.(Ref.- RDSOs Handbook on Up-keeping of rubber items). [ Warranty Period: 24 Months after the date of delivery ][Quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total PO value variationPermitted: Max 8 lacs ] ]Electic Loco Shed Stores/BKSC, Jharkhand 44.00 SetSERElectric Loco Shed Stores/BNDM, Odisha 9.00 SetSERElectric Loco Shed Stores/ROU, Odisha 6.00 Set
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.