| 1 | Foundation excavation in hard soil including levelling and dressing the bed and sides depositing muck within initial lead and lift etc. complete as per direction of Engg-in-Charge . |
| 2 | Filling foundation and plinth with sand well watered and rammed including cost,conveyance and royality of sand etc. complete as per direction of Engg-in-Charge . |
| 3 | Cement concrete 1:3:6 using 4cm. size HBG crusher broken metal including cost,conveyance and royality of materials curing etc. complete as per direction of Engg-in-Charge . |
| 4 | R.C.C. work M-20 grade using 20mm.and down grade HBG crusher broken chips including hoisting,laying, cost,conveyance and royality of materials curing including centering and shuttering etc. complete as per direction of Engg-in-Charge . |
| 5 | Column base |
| 6 | Plinth band |
| 7 | Column and beam |
| 8 | Supplying,fitting and placing uncoated HYSD bar reinforcement as per drawing and technical specification including cost,conveyance and all taxes of steel and binding wire etc.complete as per direction of Engg-in-Charge . |
| 9 | Brick work with Fly Ash Bricks having crushing strength 100-150 kg/sq.cm in c.m. 1:6 in F & P including cost conveyance and royality of materials curing etc. complete as per direction of Engg-in-Charge . |
| 10 | Brick work with Fly Ash .Bricks having crushing strength between 100kg/sq.cm to 149kg/sq.cm in c.m. 1:6 in Sup.Str. including cost conveyance and royality of materials curing etc. complete as per direction of Engg-in-Charge . |
| 11 | Cement Concrete (1:2:4) with 12 mm size broken hard granite chips for R.C.C. works including hoisting and laying etc. complete as per direction of Engg-in-Charge . |
| 12 | 12mm. thick cement plaster in c.m. 1:6 over brick masonry including cost conveyance and royality of materials curing etc. complete as per direction of Engg-in-Charge . |
| 13 | Wall Priming one coats on new work with wall water bound primer of approved shade as per direction of Engg-in-Charge . |
| 14 | Ground Floor |
| 15 | First Floor |
| 16 | Second Floor |
| 17 | Wall painting two coats on new work with Plastic emulsion paint of approved shade as per direction of Engg-in-Charge . |
| 18 | Ground Floor |
| 19 | First Floor |
| 20 | Wall painting two coats on new work with Weather coat paint of approved shade as per direction of Engg-in-Charge . |
| 21 | Ground Floor |
| 22 | First Floor |
| 23 | Second Floor |
| 24 | Red Oxide Priming one coat with Red oxide primer of approvedquality etc. complete as per direction of Engg-in-Charge .Data for 9.30 Sqm.. |
| 25 | Enamel Painting two coats with enamel paint of approved quality etc. complete as per direction of Engg-in-Charge .Data for 9.30 Sqm.. |
| 26 | Fixing Granite tiles of size above 0.4 Sqm. (20mm. thick) in floors,treads or steps and landings on 25 mm thick CM (1:1) jointed with neat cement slurry mixed with pigments to match the shades includind cost for rubbing, polishing & cost of marbel tiles etc. complete as per direction of Engg-in-Charge |
| 27 | Supplying,fitting & fixing of stainless steel of 304 grade in main gate using 75mm.x38mm.x2mm thick square pipe at 150 mm distance |
| 28 | Provision of signage(Stainless steel letters of size 10\") |
| 29 | Supplying and fixing of 60 mm thick cement concreteinterlocking paver block of M30 grade of approved make design, colour and size made by block making machine with propert compaction laid in required pattern etc. Complete in all respect conforming to IROSP-63:2018 (As per SOR 2022, Page 233) |
| 30 | Providing & fixing false ceiling of Alm anodised T section no 3215 with 2\"-0\" center to centre,L section no 1705 up to 15 micron on 4 walls to be fixed by means of steel screw and PVC plug and the Alm grid 2\"-0\"x2\"-0\" with 17.5mm thick gypsum Board Please Enable Macros to View BoQ information |