|
| 1 | Supply of steel wire rope 20-25 mm dia for pulling of pantoon at the time of errection of disconnection of pantoon bridge. S.No. 40 |
| 2 | Supply of railing wire 10 mm. dia. |
| 3 | Supply of PP Rope |
| 4 | Supply of eucliptus ballies 4\" |
| 5 | Heavy Repair by Iron sheet/minor repair by Iron sheet patches of damaged pantoon with welding including all complete. |
| 6 | Supply of wooden Anchor for given proper alignment to pantoon bridge dureing operation period. S.No. 26 |
| 7 | Supply of Nariyal Rope 8-10 mm. dia for getting stay of pantoons at the time of errection and disconnection. S. No. 12 |
| 8 | Supply of Kolkata sutli for mislenious use of errection and diconnection of pantoon bridge. S.No. 4 |
| 9 | Supply of Iron Washer. S.No. 5 |
| 10 | Supply of large bamboos 35 to 40 feet long &10-15 cm dia. S.No. 13 |
| 11 | Supply of Empty Cement Bag. |
| 12 | Supply of Small bamboos 20 to 25 feet long & 8-10 cm. dia S.No. 14 |
| 13 | Supply of eucliptus ballies 6\" |
| 14 | Supply of Powal in bundel |
| 15 | Railing wire clamp |
| 16 | Hiring of one ordinary Small boat with mallaha for look out the bridge at the time of errection and diconnection & operation period.S.No. 22ii |
| 17 | Cartage of following material from gang hut to place of pantoon bridge I/C loading unloading & carriage and all T&P etc. distance 3 Km. average. S.No. 11 |
| 18 | Carriage and laying of sal sleeper including loading, unloadig, cost of carriage etc. S.No. 7 |
| 19 | carrying Sal Sleepar of edging including loading,unloading. |
| 20 | Carriage and laying of R.S. Joist 5 mtr. Long including loading, unloadig, cost of carriage etc. |
| 21 | Fixing of Railing post in position including fixing of nut, bolt etc. |
| 22 | Laying of Wooden anchor in the river on the up stream/down stream side of the pantoon bridge side including their viewing packing the sand S.No-6 at every 10m. |
| 23 | Making Barrier on both side of pantoon bridge with ballies and construction of Gang Hut |
| 24 | Cartage and Laying of chequered plate including loading, unloading cost of carriage etc. S.No. 2 |
| 25 | Errection of Pantoon Bridge at Asewa Ghat including dragging out the pantoon from dry bed to the river water and making pair and anchoring them in the down stream, carrying the pantoon pair from the place of anchoring, additional haulage of pantoon, sinki |
| 26 | Mallah for watching and maintaning bridge in working condition. |
| 27 | Extraction wire rope from railing post and making roll complete work. |
| 28 | Small boat with Mallaha required for errection of pantoon bridge doiring working condtition |
| 29 | Cartage of different material and extraction of vertical piles pigs with the help of tripot and chain pully and cartage of material from the place of bridge to gang hut I/E is I/C loading, unloading carriage and stacking in store. |
| 30 | Dismentling of chequried plate road and lifting of chequired plate laying in the alignment of road for loading into inlcuidng loading unloading at the store site |
| 31 | Cartage of pantoon after dismentling from bridge laying in dry bed/shallow water, rolling shifting upto river bank. |
| 32 | Additional Hulage of pantoon in river (1.00 km Above ) |
| 33 | Extraction wire rope from railing post and making roll complete work. |
| 34 | Local Shifting of railling post distance from Yamuna river bank at pantoon bridge site including loading unloading at the store site complete work |
| 35 | Local Shifting of RS Joist in distance at the river bank pantoon bridge site including loading, unloading labour upto site complete work |
| 36 | Local Shifting of Sal sleeper with in distance from Yamuna river bank at pantoon bridge site including loading unloading at the store site complete work |
| 37 | Local Shifting of Sal eding with in distance distance from Yamuna river bank at pantoon bridge site including loading unloading at the store site complete work |
| 38 | Maintenance of pantoon during rainy season extra mallaha (Four Month) |
| 39 | Small boat with Mallah required for maintainance of pantoon during rainy season.(One Nos. for three time mallahs in rainy season) SI N0-22(i) Please Enable Macros to View BoQ information |