Tender For Mentioned In Tender And Schedule Of Work( 20 )Items As Given Below ,[1] Earth Wrk,Excav,30M Along Rail 2151.000 M3,[2] Earth Wrk,Excav,30M Along Rail 5640.000 M3,[3] Back Filg,Ballast,Iron Ore,Rubbish 1038.000 M3,[4] Back Filg,Ballast,Iron Ore,Rubbish 2700.000 M3,[5] Chng,Rail,Disman Old Rail&Linking 477.000 M,[6] Chng,Rail,Disman Old Rail&Linking 1200.000 M,[7] Chng,Lever Box With/W/O Cong Rod 39.000 Ea,[8] Chng,Lever Box With/W/O Cong Rod 102.000 Ea,[9] Chng,Tongue Rail Ensuring Setting Of Pt 60.000 Ea,[10] Chng,Tongue Rail Ensuring Setting Of Pt 157.000 Ea,[11] Jt Squaring 197.000 Ea,[12] Jt Squaring 518.000 Ea,[13] Gauging,Individual Sleeper 1196.000 M,[14] Gauging,Individual Sleeper 3141.000 M,[15] Svcg,Pt 798.000 Ea,[16] Svcg,Pt 2095.000 Ea,[17] Transpt,Rail 39.000 Ea,[18] Transpt,Rail 104.000 Ea,[19] Drsng&Lvlg,Side Of Rail Track 995.000 M2,[20] Drsng&Lvlg,Side Of Rail Track 2613.000 M2