| 1 | Dismentaling of old surface b/w in cement motar etc all complet.SI no. 693 |
| 2 | Earth Work in Excavation in silty soil including dressing and ramming of bottom and disposal of surplus excavated earth etc all complet. |
| 3 | Providing and laying Cement concrete 1:4:8 mix (1 cement, f/sand, graded brick aggregate 40 mm) including supply of all materials. Labour and T&P etc.required for proper completion of the work and curing complete, also including cost of formwork in foundation and floors.Si no 275 |
| 4 | M-150 class Brick work over base concreate in Cement Mortar 1:4 including all material, labour, T&P etc. complete. |
| 5 | 20 mm thick Plaster with 1:2 mix (cement& C/sand mortor) with neat cement 3 mm floting coatetc all complet. |
| 6 | R.C.C. work with 1:2:4 cement, coarse sand and 20 mm guage approved stone grit to cover the crossing over drain etc all complet. |
| 7 | M.S. Iron work for R.C.C. cover and main road slab with cutting and binding etc all complet |
| 8 | Mild steel or iron work of heavy size and sections such as trusses, built up gates, door frames etc.wrought to required shape as necessary for bending etc. including supply of steel and its wastage including cost of bolts, nuts if required, welding, grinding and making holes as required for completion of work. |
| 9 | P/Lof Vertified Tiels withbase mortar 1:2 mix (cement,C/sand) and jointing by cement silury etc all complete. |
| 10 | 15 mm. Thick plaster with cement mortar in proportion of 1 : 3 cement & Corse sand of b/w etc all complet . SI no 587(3) |
| 11 | Painting 1st coat over priming coat on steelsuperior synthetic enamelto give an even shade and including cleaning the surface with one coat Priming coat withcost of all materials labour tools and plants etc. required for proper completion of the work. |
| 12 | S/L/R/C of G.S.B.stone grite with consolidation of dust and water etc all complet.(As pwd Analeses) |
| 13 | P/L 80 mm paver Interlocking tiels rabber molded including fine sand coussning and making camber in Road etc all complet. |
| 14 | Supply and fixing of 6 feet height with Complite Base and foundation with steel Canopi complite work as per Direction of E/I |
| 15 | Providing 12.5 m Heigh mask light at varius lcation under PT .D.D.U. with conectonetc all complet |
| 16 | S/F of Soler light high mars electric pole with 110 watt 2 no bettary including box ( 12 volt ,100 AH tubebettary) 5 m hight poll including Instalation complet fitting etc all complet |
| 17 | S/F of Making musical Fountain with lighting arrangment with modular fabricating including boring workwith marbal finishing etc all complet |
| 18 | S/F of Delenator |
| 19 | S/FCAT EYE |
| 20 | S/F M.S/ steel railing Around the Fountain |
| 21 | S/F M.S/ steel Stair of Statu |
| 22 | LED Board |
| 23 | add 2 % contengency |