Tender For Miscellaneous Works For Ensuring Fast Commissioning Of Plant For Fgd Project. In Connection With Supply & Installation Of Flue Gas Desulphurization (Fgd) Package At Paras Thermal Power Station 2 X 250 Mw Of Unit-03 &04, Paras, Akola, Maharashtra Dismentaling of RCC/PCC of Size (65Mx1.0Mx.200M) for all types of structures, at all levels, including all labour, equipment, scaffolding, staging, stacking of serviceable material upto a lead of 500 m and disposal of unserviceable material upto a lead of 2 Km. beyond the plant boundary or as directed by the Engineer, cutting of reinforcement, propping, shoring, enclosures, including all labour, material, equipment, handling, transportation, etc., all complete, as per specifications, drawings and instructions of the Engineer. in the Duct section 5&6. Providing and laying nominal mix Plain Cement Concrete of M 15 (with graded aggregate of nominal size 20mm) specified below, at all levels, for all kinds of works, such as mass concrete, lean concrete, bed blocks, mud-mat, grading, underbed, filling, screed concreting, paving, plinth protection, damp proof course, drains, gully chambers, trenches, etc., with all labour, material, formwork,equipment, handling, batching, transporting, pumping, including mix design, mixing (no stacking of material shall be done near the work area where concrete is being placed), conveying, placing and compacting, protecting and curing, testing, for all working conditions, etc., all complete, as per specifications, drawings and instructions of the Engineer. Providing and laying design mix cement concrete, for Reinforced Cement Concrete works, as specified below, at all levels, for all kinds of works, with 20 mm nominal size graded stone aggregate (unless specified otherwise), with all labour, material, equipment, handling, batching, transporting, testing, pumping, including mix design, mixing, conveying, placing andcompacting, protecting and curing, testing, cleaning and finishing, rendering to give a smooth and even surface, for all working conditions, preparation of scheme for concreting and getting it approved by the Engineer, etc., all complete, as per specifications, drawings and instructions of the Engineer. M-25 Grade BANDR INTENDED RATE QUANTITY Excavation including stacking of excavated material (rock/ soil) required for backfilling away from the excavated pit upto a lead of 1.00 Km., backfilling with selected excavated material (for all lifts) by mechanical means in layers not exceeding 300 mm compact thickness (higher layer thickness upto 500 mm in case of compaction using special type of equipment, such as vibratory roller etc.) to minimum 95 % Standard Proctor Density at optimum moisture content and filling the interstices with selected excavated materials, disposal of surplus excavated material outside the plant boundary upto a total lead of 5.00 Kms. for all types of work, at all levels, all complete, as per specifications, drawings and instructions of the Engineer