|
| 1 | Dismantling of pump body and its all parts & accessories cleaning all parts scraping of rust & other foreign material & make it ready for repair/replacement of new parts including of unserviceable point complete in all respect as per direction of Engineer In Charge. |
| 2 | P/F of new impeller with Bronze Metal complete in all respect as per direction of Engineer In Charge. |
| 3 | P/F of new Cast iron diffuser complete in all respect as per direction of Engineer In Charge. |
| 4 | P/F of Roller Thrust Bearing NU 29410 complete in all respect as per direction of Engineer In Charge. |
| 5 | P/F Ball Bearing 6314 ECP/C3 SKF make complete in all respect as per direction of Engineer In Charge. |
| 6 | P/F of Rolling Bearing NU-413 SKF make complete in all respect as per direction of Engineer In Charge. |
| 7 | P/F Neckring (Gun Metal) new Complete in all respect as per direction of Engineer In Charge. |
| 8 | P/F Guide Bush of bronze grade -318 complete in all respect as per direction of Engineer In Charge. |
| 9 | P/F Distance bush of stainless steel grade-410 complete in all respect as per direction of Engineer In Charge. |
| 10 | P/F Suction & delivery Case sleeve of SS-410 complete in all respect as per direction of Engineer In Charge. |
| 11 | P/F Gland plate bushes complete in all respect as per direction of Engineer In Charge. |
| 12 | P/F of lock nut for set both side complete in all respect as per direction of Engineer In Charge. |
| 13 | P/F of chuck nut set both side complete in all respect as per direction of Engineer In Charge. |
| 14 | P/F Stainless steel grade SS-410 keys for impellers complete in all respect as per direction of Engineer In Charge. |
| 15 | P/E new rubber “O”ring for stage bowl complete in all respect as per direction of Engineer In Charge. |
| 16 | P/F of pump shaft sleeves of stainless steel grade-410 complete in all respect as per direction of Engineer In Charge. |
| 17 | Repair of Bearing brackets, brazing & turning as per bearing bush complete in all respect as per direction of Engineer In Charge. |
| 18 | Balancing of pump assembling complete in all respect as per direction of Engineer In Charge. |
| 19 | Painting of Diffuzer and Pump body from inside and outside with primer & paints complete in all respect as per direction of Engineer In Charge. |
| 20 | Assembling of all parts accessories of pump complete fixing on bed couple with motor complete in all respect as per direction of Engineer In Charge. |
| 21 | Carriage of pump from pump house to work shop and back to the pump house i/c loading unloading with hydra and manual labour complete in all respect as per direction of Engineer In Charge. |