Tender For Construction, maintenance and dismantling of Nagvasuki pontoon bridge and its approach road for Magh Mela 2025-26. - Leveling and Dressing of road surface (4 cm deep) including cutting/filling including labour, T&P etc., complete in all respect as per direction of Engineer-in-Charge. (SOR Pg. 51 SI No.-25 ) Excluding GST. 2 Earth work in cutting or filling in embankment for cambering of approach link road including proper longitudinal and side grade and slope as per level given at site including cost of all labour and T&P etc. dressing & disposal of earth by head load on spoil bank of river on shore complete in all respect as per direction of Engineer-in-Charge. etc. required for proper completion of work.Excluding royalty & GST. (Maximum average top width of embankment 12 mtr & maximum average height 35 cm.) Excluding GST. 3 Earth work in cutting or filling in embankment for cambering of approach link road including proper longitudinal and side grade and slope as per level given at site including cost of all labour and T&P etc. dressing & disposal of earth by head load on spoil bank of river on shore but for one lift extra for Kagar cutting/Filling complete in all respect as per direction of Engineer-in-Charge. etc. required for proper completion of work.Excluding GST. (Maximum average top width of embankment 12 mtr & maximum average height 35 cm.) Excluding GST. 4 Cartage, laying and fixing of R.S. Joist (5.00 Rm.) from central store (Kanihar) to bridge/pile/road site including loading, unloading, labour, T&P etc. & placing complete in all respect as per direction of Engineer-in-Charge. required for proper completion of work. Excluding GST.( SI No. -11 Pg.53) 5 Cartage, laying and fixing of Railing posts from central store (Kanihar) to bridge/pile/road site including loading, unloading, labour, T&P etc. & placing complete in all respect as per direction of Engineer-in-Charge. required for proper completion of work. Excluding GST. ( SI No. -23 Pg.51) 6 Cartage, laying and fixing of Sal Sleeper from central store (Kanihar) to bridge/pile/road site including loading, unloading, labour, T&P etc. & placing complete in all respect as per direction of Engineer-in-Charge. required for proper completion of work. Excluding GST. (SI No. -9(I) Pg.53) 7 Cartage, laying and fixing of Sal edging from central store (Kanihar) to bridge/pile/road site including loading, unloading, labour, T&P etc. & placing complete in all respect as per direction of Engineer-in-Charge. required for proper completion of work. Excluding GST. (SI No. -9(II) Pg.53) 8 Cartage, laying and fixing of Iron anchor from central store (Kanihar) to bridge/pile/road site including loading, unloading, labour, T&P etc. & placing complete in all respect as per direction of Engineer-in-Charge. required for proper completion of work. Excluding GST. 9 Cartage, laying and fixing of Chequered plate from central store (Kanihar) to bridge/pile/road site including loading, unloading, labour, T&P etc. & placing complete in all respect as per direction of Engineer-in-Charge. required for proper completion of work. Excluding GST. (SI No. -7 Pg.53) 10 Cartage, laying and fixing of Other material such as washer, M.S plate, wire rope & Nut Bolts etc. from central store (Kanihar) to bridge/pile/road site including loading, unloading, labour, T&P etc. & placing complete in all respect as per direction of Engineer-in-Charge. required for proper completion of work. Excluding GST. (SI No. -16 Pg.51) 11 Cartage of pontoons by Truck/ Trailor from Kanihar Store to site of work including loading, unloading, with the help of crane, labour, T&P etc. complete in all respectas per direction of Engineer-in-Charge.( SI No. -1A Pg.53) Exluding GST. 12 Supply and laying of wooden anchor for UP stream of size 2.4x1.8x3.1m.with 10 & 15cm. eucalyptus balli including cost of ballies, nails & Weaving Packing avarage 70 nos Sand filled cement bag& also Including anchoring with ISI mark PP rope (28 mm dia) all matrial labour T&P etc. required for proper completion of work as per direction of Engineer-in-Charge. (This item will applied only on minimum 30 cm water depth in river .) Exluding GST. 13 Supply and laying of wooden anchor for down stream of size 2.4x1.8x3.1m.with 10 & 15cm. eucalyptus balli including cost of ballies, nails & Weaving Packing avarage 70 Sand Filled cement bag& also Including anchoring with Coir rope (1.5/1.2 inch dia) all matrial labour T&P etc. required for proper completion of work as per direction of Engineer-in-Charge. (This item will applied only on minimum 30 cm water depth in river .) Exluding GST. 14 Supply and laying of mallahi nails of approved quality 15-30 cm. long including its cost, carriage, loading, unloading and stacking at site etc. complete as per direction of Engineer-in-Charge.SL no-15 (SoR Pg-51for Kumbh mela/Magh Mela)SL no-15 (SoR Pg-51for Kumbh mela/Magh Mela) 15 S/o sand filled cement bags of good quality & good condition duly filled with local sand and properly stitching with sutli for filling in anchor, bundaling etc. work including cost of all material, labour, carriage, T&P etc. and placing as per direction of Engineer-in-Charge.( SI No. -2 Pg.51) Excluding GST. 16 Construction of Pile culvert(Labour only) (SOR Pg 53 SL 18) Excluding GST. 17 Dragging the pontoon from dry bed on the river bank to river water and making pair and anchoring them in down stream side of pantoon bridge for proper completion of the work as per direction of Engineer-in-Charge( SI No. -2 Pg.53) Excluding GST. 18 Carriage of pontoons pairs from the place of anchoring down stream side of the bridge to the bridge alignment in water and fixing the same with other pontoons pair of bridge including labour T&P etc. proper completion of the work as per direction of Engineer-in-Charge.( SI No. -3 Pg.53) Excluding GST. 19 Additional haulage of Pontoon in River (per km) complete in all respect as per direction of Engineer-in-Charge. Excluding GST. (SI No. -3A Pg.53) 20 During carriying the pantoon pair from place of anchoring (D/S side of bridge) in water then to cross the dry bed/shallow water on the way upto the alignment, disconnecting pantoon pair and rolling the pantoon and fixing in the alignmentcomplete in all respect as per direction of Engineer-in-Charge. Excluding GST.( SI No. -4 Pg.53) 21 Sinking of Pontoons to obtain the proper gradient as laid in dry bed by digging earth including all labour T&P etc. proper completion of the work as per direction of Engineer-in-charge.( SI No. -5 Pg.53) Excluding GST. 22 Fixing of railing post in position including making 16 mm dia 25 cm deep hole with the help of generator and drill machine over sleeper and all sal edging before fixing the railing post with help of 300X16 mm size nut & bolt at 1.25 mtr center to center including complete in all respect as per direction of Engineer-in-Charge.(SI No. -8 Pg.53) Excluding GST. 23 Two coat painting of railing post including paint and labour etc. complete in all respect as per direction of Engineer-in-Charge.(SI No.-31 Pg.51) Excluding GST. 24 Fixing of 10 mm railing wire through hole of railing post and holes of verticals ballies post and making wire stay of each row and tighting with the help of railing wire clampcomplete in all respect as direction of Engineer-in-Charge.( SI No. -16 Pg.53) Excluding GST. 25 Supply and spreading of Kansa poola 5 cm thick over bridge/ pile road way before filling of 7.5 cm thick Kapsa soil including cartage of kapsa soil from distance of 1 km. on either side of bridge/pile and spreading, ramming and dressing the surface complete in all respect as per direction of Engineer-in-Charge. for proper completion of work.( SI No. -15 Pg.53) Excluding GST. 26 Supply and Laying of local sand including cartage (beyond 3 km) digging, loading, unloading, stackingetc. complete in non sandy area complete in all respect as per direction of Engineer-in-Charge. 27 Relaying of Chequered plates to proper alignment and level including shifting upto 30 meter including cost of all labour, T&P etc. required for proper completion of work as per direction of Engineer-in-Charge. ( SI No. -13 Pg.53) Excluding GST. 28 Making stay on both side of pontoon bridge with the help of 20 mm Wire rope complete in all respect as per direction of Engineer-in-Charge.(labour rate only)( SI No. -36 Pg.52) Excluding GST. 29 Butt Jointing of chequered plate with M.S. Plate with nut bolt (65mmx12mm/ 40mmx12mm) including nut bolt, washer, labour & T&P etc but excluding cost of Nut bolt &MS Plate. complete in all respect as per direction of Engineer-in-Charge.(Pg.52 SI No.-37+38) Excluding GST. 30 Cartage & Fixing of man hole cover in pontoon as per direction of Engineer-in-charge.( SI No. -32 Pg.52) Excluding GST. 31 Making barrier on both sides of bridge head with ballies as per direction of Engineer-in-charge.(labour rate only) ( SI No. -33 Pg.52) 32 Making hole 14 mm dia in new chequered plate. Including labour T&P etc. complete in all respect as per direction of Engineer-in-Charge.( SI No. -2 Pg.50) 33 Supply and Fixing of wooden crate of eucalyptus balli 2.80x1.80x1.80 mtr side made of 8 cm balliincluding cost of labour, T&P & material complete in all respect as per direction of Engineer-in-Charge.( SI No. -29A+29B Pg.51+52) Excluding GST. 34 Bundaling with the help 10 cm horizontal ballies and 15 cm vertical ballies @ 50 cm c/c ballie and fixing below 1.0 to 3.0 mtr of water level and palcing sand filled bags upto 30 cm above water level complete in all respect as per direction of Engineer-in-Charge.( SI No. -28 Pg.51) Excluding GST. 35 Hire Charges of the small boat with Mallah for Inspection of Pantoon complete in all respect as per direction of Engineer-in-Charge.( SI No. -22(1) Pg.51) Excluding GST. 36 Daldal treatment in 12 meter width only with carted sand, including Labour , T&P complete in all respect as per direction of Engineer-in-Charge. Excluding GST. 37 Maintenance of Pontoon bridge including pile on either side from start to end of Magh Mela day-night including tightening of nuts, bolts of pontoons & railing posts, repair of Kansa Poola and Kapsa soil, maintenance of Chequered plates, watering of way of Pontoon bridge and supervision of nut, bolts of Pontoons and fixing of nut, bolts removing damaged nut blots and tightening of ropes and watch and ward of camp and Pontoon bridge and other work as per direction of Engineer-in-Charge.( SI No. -17 Pg.54) Excluding GST. 38 Maintenance of 6 Row Chequered Plate road laying on pontoon bridge complete in all respect as per direction of Engineer-in-Charge.(Sl 19 (ii), Pg 54) excluding watering Excluding GST. 39 Extraction of 10 mm wire rope from railing post and making role complete in all respect as per direction of Engineer-in-Charge. ( SI No. -4 Pg.50) Excluding GST. 40 Declamping of the M.S.plate and Nut Bolt from chequered plate (labour rates only) of butt jointing-complete in all respect as per direction of Engineer-in-Charge. Excluding GST. 41 Opening out man hole covers including loading, unloading, cartage & stacking in store at Jhunsi complete in all respect as per direction of Engineer-in-Charge. ( SI No. -11 Pg.50) Excluding GST. 42 Dismantling of R.S. Joist (5.20 Rm.) of pontoon bridge, pile and approach link road including cartage of these material from site of work to Kanihar storeand also including loading, unloading stacking properly and also including all taxes all labour and work, T&P etc. required for proper completion of work as per direction of Engineer-in-Charge. Excluding GST. ( SI No. -9 Pg.50) 43 Dismantling of Railing posts of pontoon bridge, pile and approach link road including cartage of these material from site of work to Kanihar storeand also including loading, unloading stacking properly and also including all taxes all labour and work, T&P etc. required for proper completion of work as per direction of Engineer-in-Charge. Excluding GST. (SI No. -6 Pg.50) 44 Dismantling of Sal Sleeper of pontoon bridge, pile and approach link road including cartage of these material from site of work to Kanihar storeand also including loading, unloading stacking properly and also including all taxes all labour and work, T&P etc. required for proper completion of work as per direction of Engineer-in-Charge. Excluding GST. ( SI No. -8 Pg.50) 45 Dismantling of Sal edging of pontoon bridge, pile and approach link road including cartage of these material from site of work to Kanihar storeand also including loading, unloading stacking properly and also including all taxes all labour and work, T&P etc. required for proper completion of work as per direction of Engineer-in-Charge. Excluding GST. ( SI No. -7 Pg.50) 46 Dismantling of Iron anchor of pontoon bridge, pile and approach link road including cartage of these material from site of work to Kanihar storeand also including loading, unloading stacking properly and also including all taxes all labour and work, T&P etc. required for proper completion of work as per direction of Engineer-in-Charge. Excluding GST. 47 Dismantling of Chequered plate of pontoon bridge, pile and approach link road including cartage of these material from site of work to Kanihar storeand also including loading, unloading stacking properly and also including all taxes all labour and work, T&P etc. required for proper completion of work as per direction of Engineer-in-Charge. Excluding GST.( SI No. -3 Pg.50) 48 Dismantling of Other material such aswasher, M.S plate, wire rope & Nut Bolts of pontoon bridge, pile and approach link road including cartage of these material from site of work to Kanihar storeand also including loading, unloading stacking properly and also including all taxes all labour and work, T&P etc. required for proper completion of work as per direction of Engineer-in-Charge. Excluding GST. ( SI No. -12 Pg.50) 49 Cartage of pontoons by Truck/ Trailor after dismantling from bridge site to Jhunsi Bus stop including disconnecting the pontoons laying in dry bed / shallow water, rolling and haulage up to river bank. Loading, unloading, with the help of crane, labour, T&P etc complete in all respect as per direction of Engineer-in-Charge.( SI No. -13 Pg.50) 50 Cartage of pontoons by Truck/ Trailor after dismantling from bridge site to Jhunsi Bus stop including haulage of the pontoons up to river bank, disconnectionthe help of crane, labour, T&P etc. complete in all respect as per direction of Engineer-in-Charge.( SI No. -14 Pg.50) Excluding GST.