}

Tender For Rates For Lift , Fire Fighting System And Drainage Pump Works At Agrimall - S/I/T/C Of6 Passenger (408 Kg) Lifts (Gearless), Mrl Having Contract Speed Of 1.0 Mps Serving Different Floors In The Lift Shaft As Per Detailed Specifications Enclosed, mandi-Uttar Pradesh

Rajya Krishi Utpadan Mandi Parishad has published Tender For Rates For Lift , Fire Fighting System And Drainage Pump Works At Agrimall - S/I/T/C Of6 Passenger (408 Kg) Lifts (Gearless), Mrl Having Contract Speed Of 1.0 Mps Serving Different Floors In The Lift Shaft As Per Detailed Specifications Enclosed. Submission Date for this Tender is 17-10-2025. Greases Tenders in mandi Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

51724205
Tender For Rates For Lift , Fire Fighting System And Drainage Pump Works At Agrimall - S/I/T/C Of6 Passenger (408 Kg) Lifts (Gearless), Mrl Having Contract Speed Of 1.0 Mps Serving Different Floors In The Lift Shaft As Per Detailed Specifications Enclosed
Tender
Indian
Uttar Pradesh
Mandi
17-10-2025

Tender Details

Tender For Rates For Lift , Fire Fighting System And Drainage Pump Works At Agrimall - S/I/T/C of6 Passenger (408 Kg) Lifts (Gearless), MRL having contract speed of 1.0 MPS serving different floors in the lift shaft as per detailed specifications enclosed and as under:-Speed --> 1.0 MPSFloors --> SevenNumber of Stops--> 7Controller: A.C. variable voltage & variable frequency drive.Automatic rescue device complete with dry maintenance free batteries as required. Operation: Microprocessor based single automatic push button/Duplex selective collective with / without attendant.Power-415 V, 3 phase, 50 Hz, 4 wires systemCar Door Enclosure SS Hairline 441 Car Enclosure SS Hairline 441 Ceiling as per manufacturers standards with Fan & LED Lights. On each Landing outside the lift, a steel plate with illumination sign shall be provided with written on it:- DO NOT USE LIFT IN CASE OF FIRE. Fire man switch at ground floor to be provided. Interlocking provision with Fire detection system shall be provided.Lift described as above complete as per specification(Make: Otis/Kone/Mitsubishi/Schindler/Johnson/Fujitec) 3 S/I/T/C of6 Passenger (408 Kg) Lifts (Gearless), MRL having contract speed of 1.0 MPS serving different floors in the lift shaft as per detailed specifications enclosed and as under:-Speed --> 1.0 MPSFloors -->SixNumber of Stops-->6Controller: A.C. variable voltage & variable frequency drive.Automatic rescue device complete with dry maintenance free batteries as required. Operation: Microprocessor based single automatic push button/Duplex selective collective with / without attendant.Power-415 V, 3 phase, 50 Hz, 4 wires systemCar Door Enclosure SS Hairline 441 Car Enclosure SS Hairline 441 Ceiling as per manufacturers standards with Fan & LED Lights. On each Landing outside the lift, a steel plate with illumination sign shall be provided with written on it:- DO NOT USE LIFT IN CASE OF FIRE. Fire man switch at ground floor to be provided. Interlocking provision with Fire detection system shall be provided.Lift described as above complete as per specification(Make: Otis/Kone/Mitsubishi/Schindler/Johnson/Fujitec) 4 S/I/T/Cg of15 Passenger (1020 Kg) Lifts (Gearless), MRL having contract speed of 1.0 MPS serving different floors in the lift shaft as per detailed specifications enclosed and as under:-Speed --> 1.0 MPSFloors --> SevenNumber of Stops-->7Controller: A.C. variable voltage & variable frequency drive.Automatic rescue device complete with dry maintenance free batteries as required. Operation: Microprocessor based single automatic push button/Duplex selective collective with / without attendant.Power-415 V, 3 phase, 50 Hz, 4 wires systemCar Door Enclosure SS Hairline 441 Car Enclosure SS Hairline 441 Ceiling as per manufacturers standards with Fan & LED Lights. On each Landing outside the lift, a steel plate with illumination sign shall be provided with written on it:- DO NOT USE LIFT IN CASE OF FIRE. Fire man switch at ground floor to be provided. Interlocking provision with Fire detection system shall be provided.Lift described as above complete as per specification(Make: Otis/Kone/Mitsubishi/Schindler/Johnson/Fujitec) 5 S/I/T/C of15 Passenger (1020 Kg) Lifts (Gearless), MRL having contract speed of 1.0 MPS serving different floors in the lift shaft as per detailed specifications enclosed and as under:-Speed --> 1.0 MPSFloors --> SixNumber of Stops-->6Controller: A.C. variable voltage & variable frequency drive.Automatic rescue device complete with dry maintenance free batteries as required. Operation: Microprocessor based single automatic push button/Duplex selective collective with / without attendant.Power-415 V, 3 phase, 50 Hz, 4 wires systemCar Door Enclosure SS Hairline 441 Car Enclosure SS Hairline 441 Ceiling as per manufacturers standards with Fan & LED Lights. On each Landing outside the lift, a steel plate with illumination sign shall be provided with written on it:- DO NOT USE LIFT IN CASE OF FIRE. Fire man switch at ground floor to be provided. Interlocking provision with Fire detection system shall be provided.Lift described as above complete as per specification(Make: Otis/Kone/Mitsubishi/Schindler/Johnson/Fujitec) 6 Goods LIFT -S/I/T/C of2000 KG Goods lift (Gearless), With Machine Roomhaving contract speed of 0.5 MPS serving different floors in the lift shaft as per detailed specifications enclosed and as under:-Speed --> 0.5 MPSFloors -->Three (B-2, B-1 and LGF)Number of Stops--> 3Number of Openings--> 6 ( Double Door)Controller: A.C. variable voltage & variable frequency drive.Automatic rescue device complete with dry maintenance free batteries as required.Operation: Microprocessor based single automatic push button/Duplex selective collective with / without attendant.Power-415 V, 3 phase, 50 Hz, 4 wires systemCar Door Enclosure SS Hairline 304Car Enclosure SS Hairline 304Ceiling as per manufacturers standards with Fan & LED Lights. On each Landing outside the lift, a steel plate with illumination sign shall be provided with written on it:- DO NOT USE LIFT IN CASE OF FIRE. Fire man switch at ground floor to be provided. Interlocking provision with Fire detection system shall be provided.Lift described as above complete as per specification(Make: Otis/Kone/Mitsubishi/Schindler/Johnson/Fujitec) 7 Ducted Inline Type Exhaust fans :(Make: Greekheck/Zeco/LTI/Witt India/Airflow/Pineair/ Ostberg/ Kruger/Flaktwood/systemair)Supply,installation,testing and commissioning of ducted Inline type exhaustfans complete with motor ,fan, exhaust Louvers as per drawings and specifications. of following sizes : 1000 cfm at 30 mm static 8 500 cfm at 30 mm static 9 Propeller Type Exhaust Fans :(Make: Greekheck/Zeco/LTI/Witt India/Airflow/Pineair/ Ostberg/ Kruger/Flaktwood/systemair)Supply,installation,testing and commissioning of propeller type free discharge exhaustfans complete with motor , fan ,exhaust Louvers as per drawings and specifications of following sizes :150 mm dia (free discharge) 10 100 mm dia (free discharge) 11 Providing, fixing, testing and commissioning of Air vessel of 400mm dia for pressurization of fire system complete with valves at outlet / drain to operate as per operating sequencesincluding25 mmdia drain valve, air release valve with stop cock on the top, outside with one coat of primer & two coats of synthetic enamel paint of approved shade complete as required to operate commonly main fire pump, sprinkler pump & jockey pump at drop of pressure, automatically at required pressure setting.It should be complete as per manufacturers specifications & as directed by Engineer- in-charge. working pressure:- 7 kg/sqcmtest pressure: 10 kg/sqcm 12 System ControllerDesigning, supply , installation, testing and commissioning of system controller to control operation of main electric fire pump, diesel pump, pressurization pump, terrace pump in sequence as per specification consisting of relays, timers, sensors, annunciation window for fault indication, complete as per specification 2sets. 13 S/I/T/C of Fully automatic(by Level Controllers with sensing probes) MBBR Technology based Sewage Treatment Plant process below and above ground with sewage and effluent handling capacity as given below. The STP shall be designed as water retaining structures in RCC or MS structure including necessary chemical dosing as required by the manufacturers design. All the equipment, piping, pumps, blowers and electrical to be housed in a plant room nearby. Inlet, outlet overflow, vent, M.S. cover, drain channel with M.S. gratings sumps if required to be provided as per the site condition. (The total system to be designed as a Trunky project which includes detailed design engineering of civil/ structural /Biological/ Electro-Mechanical and treated effluent should meet the acceptable parameter. The STP shall be designed based on the following Inflow parameters:* PH : 6.5 - 8.5 * BODs : 300-400 * S. Solids : 200 - 450 Mg/l * COD : 600 - 800 mg/L * Oil & Grease : 50-100 mg/L * PH : 6.0 - 8.5 * BODs :less than 20 mg/l * S. Solids :Less than 20 mg/l* COD :Less than 100 mg/l* Oil & Grease :Less than 5 mg/l Associated civil work for STP including foundation of pumps & equipment, M S structural work etc. is included in this scope Supply of all required Civil & Mechanical/Electrical shop drawings to be prepared by the contractor and approved by Project Manager. Contractor shall include all electrical mechanical items as required to operate the system automatically/ manually and also include in his rates level controller, electrical wiring cables earthing main control panel and connection to be various equipment’s, other accessories complete as required. Only main power supply with the earthing to be STP main control panel shall be provided by the owner through other agencies. STPshould follow all the concern Indian CPCB and Local norms and to be got approved from statuatory authority.Bypass arrangement shall be provided as shown in the drawings such that equalization tank pump can be used to pumpout sewage to external manhole incase of maintenance of STP.A S.T.P OF CAP - 65 KLD. This includes all civil, electrical/mechanical work required for proper completion of work. 14 Drainage Sump PumpsSubmersible pumps for basement drainage & Pump Room drainage. Submersible single stage single entry pumps with C.I.body and C.I. two vane enclosed type impeller connected to TEFC submersible motor for 415 volts, 3 phase, 50 cycles including MCC panel with level controllers, auto control, sequential change over facility with one proper working at low level & two proper working at high level with an audible alarm including all interconnectivity cables, with both pumps connected to common outlet header including valves, non return valves, lifting chains etc. complete in all respectNo. of Pumps: 2 (1 Working +1 Standby)=1 setHead : app. 21 m 15 Operation cost for 1st year of agrimall for all installed electrical and mechanical equipments/machines including electricians, electrician helpers and mechanical operators. 16 Operation cost for 2nd year of agrimall for all installed electrical and mechanical equipments/machines including electricians, electrician helpers and mechanical operators. 17 Operation cost for 3rd year of agrimall for all installed electrical and mechanical equipments/machines including electricians, electrician helpers and mechanical operators. 18 Operation cost for 4th year of agrimall for all installed electrical and mechanical equipments/machines including electricians, electrician helpers and mechanical operators. 19 Operation cost for 5th year of agrimall for all installed electrical and mechanical equipments/machines including electricians, electrician helpers and mechanical operators. 20 Comprehensive maintenance cost for 2nd year of agrimall for all installed electrical and mechanical equipments/machines including DG sets, Transformers, Electrical panels, Fire fighting and fire alarm system, lifts, STP, ventillation system and CCTV 21 Comprehensive maintenance cost for 3rd year of agrimall for all installed electrical and mechanical equipments/machines including DG sets, Transformers, Electrical panels, Fire fighting and fire alarm system, lifts, STP, ventillation system and CCTV 22 Comprehensive maintenance cost for 4th year of agrimall for all installed electrical and mechanical equipments/machines including DG sets, Transformers, Electrical panels, Fire fighting and fire alarm system, lifts, STP, ventillation system and CCTV 23 Comprehensive maintenance cost for 5th year of agrimall for all installed electrical and mechanical equipments/machines including DG sets, Transformers, Electrical panels, Fire fighting and fire alarm system, lifts, STP, ventillation system and CCTV

Key Value

Document Fees
Refer document
Tender Value
Refer document

Attachment

FileName File Description File Size
Click here to download tender document Tender Documents 0 KB
Click here to download tender document Tender Documents 0 KB
Click here to download tender document Tender Documents 0 KB
Click here to download tender document Tender Documents 0 KB
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail