The Various Capital Works In O And M Perambalur Division; 1 Excavation of Pole Pits for poles upto 8.00m length by using JCB/Manual (1.25 X 0.6 X 1.5M) 2 Excavation of Pole Pits for pole above 8.00m length by using JCB/Manual (1.25x06x1.83M) 3 Excavation of Pole Pits in Hard Soil (common to all size of poles) 4 Excavation of Pole Pits in rocky area (common to all size of poles) by blasting / Manual 5 Excavation of Stay pit of 4.5 to 5 depth using JCB / Manual (0.95 X 0.6 X 1.2 M) 6 Excavation of Stay pit in Hard rock soil (0.95 X 0.6 X 1.2 M) 7 Erection of RCC, REC, PSC poles upto 8.00m length by using Crane / Manual 8 Erection of RCC, REC, PSC poles above 8.00m length by using Crane / Manual 9 Erection of metal supports above 9m / RSJ / Rail Pole/Tubular Poles 10 Erection of stay set complete with fixing up stay wire Eye, Bow, Guy Shackle, Binding etc. excluding stay pit excavation 11 Erection of additional Stay in the same stay rod, excluding excavation of stay pit and burial of stay rod. 12 Erection of stay set complete in the rock area by blasting 13 Fixing of V cross arm 3.5feet 14 Fixing of V cross arm4.5 feet 15 Fixing ofV cross arm5.0 feet 16 Fixing of Fixing of LT S phase cross arm 17 Fixing of Fixing of LT 3 phase cross arm 18 Fixing of Fixing of HT / LT Ti fitting 19 Fixing of Fixing of HT PIN insulator with Pin 11 kv 20 Fixing of HT PIN insulator with Pin 22 kv 21 Fixing of HT PIN insulator with Pin 33 kv 22 Fixing of LT PIN insulator with pin 23 Fixing of HT strain disc 11 KV with Metal parts 24 Fixing of HT strain disc 22 KV with Metal parts 25 Fixing of HT strain disc 33 KV with Metal parts 26 Fixing of Tapping cross arm 27 Fixing of Two Tapping cross arm per cut point upto 33 KV line including fixing of Discs,insulators and Jumpering etc.. 28 Fixing of Top Channel 29 Fixing & erection of Cross bracing 30 Fixing of shackle with Metal parts 31 Fixing of Aluminium knob 32 Fixing of HT LAS (3 Nos.) 33 Fixing of LT LAS (3 Nos.) 34 Paving and stringing of conductors of sizes upto 7/2.59 mm ACSR or other equivalent conductor 35 Paving and stringing of conductors ofabove7/2.59 mm ACSR or other equivalent conductor upto 7/3.35mm ACSR or other equivalent conductor 36 Paving and stringing of conductors of7/4.09mm ACSR or other equivalent conductor 37 Paving and stringing of conductors of7/4.72 mm Dog Conductor or other equivalent conductor 38 Complete Erection of Double Pole Distribution Transformer structureas per TNEB standard likepole pit excavation & erection, stay pit excavation and erection, feeders arrangement, Open type fuse unit,HT / LT LAS and jumpering, 3 Nos Earth pits with earth trough, concreting,coping, Colour washing of RCC poles, Painting of Structure Materials (including cost of paint(red oxide,Aluminium) and distember), Danger Board fixing etc.. (excludingerection of Distribution Transformer) 39 Erection of 11 KV Single Pole structure including erection of DT complete with centre supportwith pole pit excavation & erection, stay pit excavation and erection,feeders arrangement, open type fuse unit, HT/LT LAS and jumpering, 3 Nos Earth pits with earth trough, structure earthning complete, concreting, coping colour washing of RCC poles, painting of structure materials (including cost of paint (red oxide,Aluminium) and distember), Danger Board fixing etc., 40 (i)Erection of Distribution Transformer including loading of Distribution Transformer at stores and erection at structure or vice versa. Upto 25 KVA Distribution transformer / Metering set. 41 (ii) Erection of Distribution Transformer including loading of Distribution Transformer at stores and erection at structure or vice versa. Above 25 KVA to 100 KVA 42 (iii) Erection of Distribution Transformer including loading of Distribution Transformer at stores and erection at structure or vice versa. Above 100 KVA to 250 KVA 43 (iv) Erection of Distribution Transformer including loading of Distribution Transformer at stores and erection at structure or vice versa. 500 KVA and above 44 (i) Erection of DP structure with stay as per TNEB standard including fixing of top channel, cross bracing, HG Fuse Unit, 3 Nos Earth pits with earth trough, structure earthning complete,concreting, painting, colour washing etc., With 11 KV AB switch using all types of poles of size 9.14 m and above length. 45 (i) Erection of DP structure with stay as per TNEB standard With 22 / 33 KV AB switch using all types of poles of size 9.14 m and above length Erection of DP structure with stay as per TNEB standard including fixing of top channel, cross bracing, HG Fuse Unit, 3 Nos Earth pits with earth trough, structure earthing complete,concreting, painting, colour washing etc., 46 Erection of single pole DP with completewith earthing 47 (i) Concreting with 1:4:8 mix using 40 mm Jelly including curing(Material + labour)Mass concreting of poles with coping 0.6MX 0.45MX1.25M 48 (ii) Concreting with 1:4:8 mix using 40 mm Jelly including curing(Material + labour)Sleeveconcreting with coping 0.6MX 0.6MX0.3M 49 (iii) Concreting with 1:4:8 mix using 40 mm Jelly including curing(Material + labour)Stay concreting with coping 0.3M dia and 0.75 long 50 (i) Earthing of poles with GI wires 4 or 6 SWG by coil earthing 51 (ii) Provision of spike with earthing arrangement including material (other than clamps & GI wire ) and fabrication 52 (iii) Pipie earthing including excavation of earth pit and fixing earth pipe 3 m length 53 (vi) Erection of fourth Earth pipe including earthing 54 (i) Loading & unloading of Distribution Transformer Upto 100 KVA 55 (ii) Loading & unloading of Distribution Transformer Above 100 KVA and upto 500 KVA 56 (iii) Loading & unloading of Metering set of all ratios 57 (i) Loading& unloading of REC, RCC, PSC pole upto 8.00 m length 58 (ii) Loading& unloading of All REC, RCC pole above 8.00 m length 59 (iii) Loading& unloading of Metal poles all sizes 60 (iv) Loading& unloading of 7.5mtr/8.0 Mtr pole Grill 61 (v) Loading& unloading of 9.14 Mtr pole Grill 62 Loading of Conductor with ramp 63 Unloading of Conductor with ramp 64 Loading of Iron & Steel 65 Unloading of Iron & Steel 66 Loading of line materials (Including Stacking except conductor drum & scrap material) 67 Unloading of line materials (Including Stacking except conductor drum & scrap material) 68 Loading of 11 KV disc 69 Unloading of 11 KV disc 70 Loading of LT Pin insulator shackle, guy shackle, LT Pin, Metal parts, HT pin etc., 71 Unloading of LT Pin insulator shackle, guy shackle, LT Pin, Metal parts, HT pin etc., 72 Transportation of all types and sizes of poles and other associated materials from Road side to pole pit and vice versa upto 1.0 KM 73 (i) Transportation of all type of poles by bullock cart or other vehicle (for all sizes of poles including loading and unloading) For a lead upto 5 KM 74 (ii) Transportation of all type of poles by bullock cart or other vehicle (for all sizes of poles including loading and unloading) Above 5 KM of lead of every KM 75 (i) Transporting of Distribution Transformer / Line materials from stores to office / site upto 10KM distance by engaging 1 Ton capacity Minidor (Lorry) 76 (ii) Transporting of Distribution Transformer / Line materials from stores to office / site Above 10 KM distance by engaging 1 Ton capacity Minidor (Lorry) 77 (iii) Provision of guarding with two numbers earth pits excluding stay set erection- Gradle guarding including Earthing and earth pit excavation without material 78 Numbering of poles including base painting and with cost of paint 79 Painting of iron poles up to 36 ft length with double coats including cost of paint 80 Painting of iron poles up to 40 ft 200/100 length with double coats including cost of paint 81 Painting of Cement poles by Distember coating including cost of distember 82 Painting of pole with Red colour gliter paintat 5 height above the ground level for 1 width around the pole. 83 Writing Scheme name in poles inculding enamel paint (letter size - 4 inch) 84 Labour charges for alteration of back clamp 85 Labour charges for alteration of Stay clamp 86 Providing of holes all size angles/Channel upto 3/4 87 Providing of holes all size angles/Channel above 3/4 88 Clearing of tree branches of coconut tree 89 Clearing of tree branches of Neem, Tamarind, Country tree 90 Clearing of karruvelam 91 Clearing of Branches / Trees with JCB 92 Fencing of Distribution Transformer Structure at Road side- Fabrication and Erection including all materials (Chain link fencing)