}

Rate Contract Fixing Of Rate Contract For Maintenance, Restoration And Works Of Emergent Nature Of Distribution Network In The Jurisdiction Of Electric Division, Jpdcl Batote For The Financial Year 2025-26, ramban-Jammu And Kashmir

Power Development Department has published Rate Contract Fixing Of Rate Contract For Maintenance, Restoration And Works Of Emergent Nature Of Distribution Network In The Jurisdiction Of Electric Division, Jpdcl Batote For The Financial Year 2025-26. Submission Date for this Tender is 24-09-2025. Dismantling Work Tenders in ramban Jammu And Kashmir. Bidders can get complete Tender details and download the document.




Tender Notice

51245046
Rate Contract Fixing Of Rate Contract For Maintenance, Restoration And Works Of Emergent Nature Of Distribution Network In The Jurisdiction Of Electric Division, Jpdcl Batote For The Financial Year 2025-26
Tender
Indian
Jammu And Kashmir
Ramban
24-09-2025

Tender Details

Rate Contract Fixing Of Rate Contract For Maintenance, Restoration And Works Of Emergent Nature Of Distribution Network In The Jurisdiction Of Electric Division, Jpdcl Batote For The Financial Year 2025-26- 1 Fixing of Rate Contract for Maintenance, Restoration and Works of Emergent nature of Distribution Network in the Jurisdiction of Electric Division, JPDCL Batote for the financial year 2025-26 or till next year tender is finalised 2 Erection ofPCC 8 Mtr Pole 3 Erection ofPCC 9 Mtr Pole 4 Erection ofPCC 11 Mtr Pole 5 Erection ofST 8 Mtr Pole 6 Erection ofST 9 Mtr Pole 7 Erection ofST 11 Mtr Pole 8 Erection ofST 13 Mtr Pole 9 Dismantling of PCC Pole 8 Mtr Long 10 Dismantling of PCC Pole 9 Mtr Long 11 Dismantling of PCC Pole 11 Mtr Long 12 Dismantling ofST Pole 8 Mtr Long 13 Dismantling ofST Pole 9 Mtr Long 14 Dismantling of ST Pole 11 Mtr Long 15 Dismantling ofST Pole 13 Mtr Long 16 Unloading of PCC 8 Mtr Pole 17 Unloading of PCC 9 Mtr Pole 18 Unloading of PCC 11 Mtr Pole 19 Unloading of ST 8 Mtr Pole 20 Unloading of ST 9 Mtr Pole 21 Unloading of ST 11 Mtr Pole 22 Unloading of ST 13 Mtr Pole 23 loading of PCC 8 Mtr Pole 24 loading of PCC 9 Mtr Pole 25 loading of PCC 11 Mtr Pole 26 loading of ST 8 Mtr Pole 27 loading of ST 9 Mtr Pole 28 loading of ST 11 Mtr Pole 29 loading of ST 13 Mtr Pole 30 Average carriage of PCC 8 Mtr Pole per 100 Mtr 31 Average carriage of PCC 9 Mtr Pole per 100 Mtr 32 Average carriage of PCC 11 Mtr Pole per 100 Mtr 33 Average carriage of ST 8 Mtr Pole per 100 Mtr 34 Average carriage of ST 9 Mtr Pole per 100 Mtr 35 Average carriage of ST 11 Mtr Pole per 100 Mtr 36 Average carriage of ST 13 Mtr Pole upto 100Mtr 37 Installation of Link Set 38 Installation of DO Set 39 Installation of HG Set 40 Installation of GO Set 41 Installation of LA Set 42 Average carriage of 25 KVA per 100 Mtr 43 Average carriage of 63 KVA per 100 Mtr 44 Average carriage of 100 KVA per 100 Mtr 45 Average carriage of 250 KVAper 100 Mtr 46 Average carriage of 300 KVAper 100 Mtr 47 Average carriage of 400 KVAper 100 Mtr 48 Average carriage of 500 KVAper 100 Mtr 49 Average carriage of 630 KVAper 100 Mtr 50 loading of 25 KVA Transformer 51 loading of 63 KVA Transformer 52 loading of 100 KVA Transformer 53 loading of 250 KVA Transformer 54 loading of 300 KVA Transformer 55 loading of 400 KVA Transformer 56 loading of 500 KVA Transformer 57 loading of 630 KVA Transformer 58 Unloading of 25 KVA Transformer 59 Unloading of 63 KVA Transformer 60 Unloading of 100 KVA Transformer 61 Unloading of 250 KVA Transformer 62 Unloading of 300 KVA Transformer 63 Unloading of 400 KVA Transformer 64 Unloading of 500 KVA Transformer 65 Unloading of 630 KVA Transformer 66 Mounting of 25KVA Transformer 67 Mounting of 63KVA Transformer 68 Mounting of 100KVA Transformer 69 Mounting of 250KVA Transformer 70 Mounting of 300KVA Transformer 71 Mounting of 400 KVA Transformer 72 Mounting of 500 KVA Transformer 73 Mounting of 630 KVA Transformer 74 Erection of Guys in HT Line 75 Erection of Guys in LT Line 76 Earthing of Substation complete(Poles,Transformer,CT/PT,LA) 77 Dismantling of Link Set 78 Dismantling of DO Set 79 Dismantling of G O Set 80 Dismantling ofHG Set 81 Dismantling of LA Set 82 Dismantling of GO Set 83 Erection of Jumper SetHT Side 84 Erection of Jumper Set LT Side 85 Dismantling of Jumper SetHT Side 86 Dismantling of Jumper Set LT Side 87 Dismounting of 25 KVA Transformer 88 Dismounting of 63KVA Transformer 89 Dismounting of 100KVA Transformer 90 Dismounting of 250KVA Transformer 91 Dismounting of 300KVA Transformer 92 Dismounting of 400KVA Transformer 93 Dismounting of 500KVA Transformer 94 Dismounting of 630KVA Transformer 95 Erection of ACSRSquirel Conductor 96 Erection of ACSRWeasel Conductor 97 Erection of ACSRRabbit Conductor 98 Erection of ACSRDog Conductor 99 Dismantling of ACSRSquirrel Conductor 100 Dismantling of ACSRWeasel Conductor 101 Dismantling of ACSRRabbit Conductor 102 Dismantling of ACSRDog Conductor 103 Tightening of loose conductor Squirrel/Weasel 104 Tightening of loose conductor Rabbit/Dog 105 Route clearance for making path for Corridor of 5 mtr./KM 106 Cement Bottoming of PCC/ST Poles of all sizes (Material for Cement Bottoming is to be provided by contractor) 107 Fixing of LT Circuit Component of Substation (LT cables,Thimbles,Busbar,Shackle insulators) with Fuse Set / MCCBwith Box 108 Dismantling of LT Circuit Component of Substation (LT cables,Thimbles,Busbar,Shackle insulators) with Fuse Set / MCCBwith Box 109 Branch Cutting 110 Unloading T & Pitems i.eLine materials Substations/HT/LT lines 111 Loading T & Pitems i.eLine materials Substations/HT/LT lines 112 Average carriage ofT & Pitems i.eLine materials Substations/HT/LT lines per 100 Mtr 113 Survey/Route Alignment 114 Drilling of Holes /Each 115 Fixing/Installation of 11 KV Disc Insulators with fittings 116 Dismantling of 11 KV Disc Insulators with fittings 117 Fixing of U-Clamps and Shackle Insulators 118 Dismantling of U-Clamps and Shackle Insulators 119 Fixing of 11 KV Pin Insulators with Pins 120 Dismantling of 11 KV Pin Insulators with Pins 121 Fixing of Top Clamps for Pin Insulators 122 Dismantling Fixing of Top Clamps for Pin Insulators 123 Fixing of Braces 124 Dismantling Fixing of Braces 125 Fixing of Danger Plates 126 Dismantling of Danger Plates 127 Fixing of Anti Climbing DevicesPlates 128 Dismantling Fixing of Anti Climbing DevicesPlates 129 Painting of Steel Tubular Poles Including Cross arms clamps etc. (Upto 9 Mtr.) 130 Painting of Steel Tubular Poles Including Cross arms clamps etc. (Above 9 Mtr.) 131 Painting of Cross arms and Clamps of PCC/Wooden Poles. 132 Providing of earthing (Spiral/Pipe/Rod Type) including fixing to the pole and cross arm etc. 133 Fixing of Spacers for LV Lines (for 5 Wire System) 134 Fixing of Spacers for LV Lines (for 4 Wire System) 135 Fixing of Spacers for LV Lines (for 3 Wire System) 136 Fixing of Pre fabricated bracket and cross arm bed for placement of transformer (for transformers upto includiung 250 KVA) 137 Fixing ofMS Channels 4.5/3 feet long along with Braces 138 Fixing ofM S Angle Iron 9 feet long crossarm 139 Fixing ofMS Angle Iron 5/4.5/3 feet long crossarm 140 Unloading of CT/PT Unit 141 Average carriage of CT/PT Unit per 100 Mtr 142 Erection of CT/PT Unit along with Trivector Meter 143 Erection of CTPT Unit 144 Testing and commissioning of CT/PT Unit 145 Fixing of Suspension/Anchoring Clamps 146 Laying of HT AB Cable 35 mmsq 147 Laying of HT AB Cable 50 mmsq 148 Laying of HT AB Cable 70 mmsq 149 Laying of HT AB Cable 95 mmsq 150 Laying of HT AB Cable 120 mmsq 151 Laying of HT AB Cable 185 mmsq 152 Laying of HT AB Cable 300 mmsq 153 Laying of HT AB Cable 400 mmsq 154 Laying of HT XLPE Cable 35 mmsq 155 Laying of HT XLPE Cable 50 mmsq 156 Laying of HT XLPE Cable 70 mmsq 157 Laying of HT XLPE Cable 95 mmsq 158 Laying of HT XLPE Cable 120 mmsq 159 Laying of HT XLPE Cable 185mmsq 160 Laying of HT XLPE Cable 300 mmsq 161 Laying of HT XLPE Cable 400 mmsq 162 Laying of LT AB Cable 35 mmsq 163 Laying of LT AB Cable 50 mmsq 164 Laying ofLT AB Cable 70 mmsq 165 Laying ofLT AB Cable 95 mmsq 166 Laying ofLT AB Cable 120 mmsq 167 Laying of LT AB Cable 185 mmsq 168 Laying of LT AB Cable 300 mmsq 169 Laying of LT AB Cable 400 mmsq 170 Laying of LT XLPE Cable 35 mmsq 171 Laying of LT XLPE Cable 50 mmsq 172 Laying ofLT XLPE Cable 70 mmsq 173 Laying ofLT XLPE Cable 95 mmsq 174 Laying ofLT XLPE Cable 120 mmsq 175 Laying of LT XLPE Cable 185 mmsq 176 Laying of LT XLPE Cable 300 mmsq 177 Laying of LT XLPE Cable 400 mmsq 178 Dismantling of HT AB Cable 35 mmsq 179 Dismantling of HT AB Cable 50 mmsq 180 Dismantling of HT AB Cable 70 mmsq 181 Dismantling of HT AB Cable 95 mmsq 182 Dismantling of HT AB Cable 120 mmsq 183 Dismantling of HT AB Cable 185mmsq 184 Dismantling of HT AB Cable 300 mmsq 185 Dismantling of HT AB Cable 400 mmsq 186 Dismantling of HT XLPE Cable 35 mmsq 187 Dismantling of HT XLPE Cable 50 mmsq 188 Dismantling of HT XLPE Cable 70 mmsq 189 Dismantling of HT XLPE Cable 95 mmsq 190 Dismantling of HT XLPE Cable 120 mmsq 191 Dismantling of HT XLPE Cable 185mmsq 192 Dismantling of HT XLPE Cable 300 mmsq 193 Dismantling of HT XLPE Cable 400 mmsq 194 Dismantling of LT AB Cable 35 mmsq 195 Dismantling of LT AB Cable 50 mmsq 196 Dismantling ofLT AB/ Cable 70 mmsq 197 Dismantling ofLT AB Cable 95 mmsq 198 Dismantling ofLT AB Cable 120 mmsq 199 Dismantling of LT AB Cable 185 mmsq 200 Dismantling of LT AB Cable 300 mmsq 201 Dismantling of LT AB Cable 400 mmsq 202 Dismantling of LT XLPE Cable 35 mmsq 203 Dismantling of LT XLPE Cable 50 mmsq 204 Dismantling ofLT XLPE Cable 70 mmsq 205 Dismantling ofLT XLPE Cable 95 mmsq 206 Dismantling ofLT XLPE Cable 120 mmsq 207 Dismantling of LT XLPE Cable 185 mmsq 208 Dismantling of LT XLPE Cable 300 mmsq 209 Dismantling of LT XLPE Cable 400 mmsq 210 Fixing of Heat Shrinkable Outdoor Kit for AB/XLPE cables ofHT Lines 211 Fixing of Straight Through Cable Jointing Kit for AB/XLPE cables ofLT Lines 212 Dismantling of Pin Insulators 213 Dismantling ofMS Channels 4.5/3 feet long along with Braces 214 Dismantling ofM S Angle Iron 9 feet long 215 DismantlingofMS Angle Iron 5/4.5/3 feet long 216 Construction of Cemented Platform (8x8x6 feet) for 630/400 KVA Substation along with Mesh Fencing of 6 feet height( If Material to be provided by department for this item) 217 Construction of Cemented Platform (8x8x6 feet) for 630/400 KVA Substation along with Mesh Fencing of 6 feet height( If Material to be provided by Contractor for this item) 218 Fixing of IPC 120/50mm 219 Service connection (Domestic/Commercial) 220 Laying of LT PVC Single Core Cable 95 mmsq 221 Laying of LT PVC Single Core Cable 185 mmsq 222 Laying of LT PVC Single Core Cable 300 mmsq 223 Laying of LT PVC Single Core Cable 400 mmsq 224 Laying of LT PVC Single Core Cable 630 mmsq 225 Fixing of Al. Thimbles of different Sizes 95 mmsq 226 Fixing of Al. Thimbles of different Sizes 185 mmsq 227 Fixing of Al. Thimbles of different Sizes 300 mmsq 228 Fixing of Al. Thimbles of different Sizes 400 mmsq 229 Fixing of Al. Thimbles of different Sizes 630 mmsq 230 Stone Pad (300 mmx 300 mm x 75 mm) 231 Fixing of Aluminium Jointing Sleeves 232 Fixing of Suspension/Tension Clamp with eye hook 233 Fixing of Wedge connectors/PG Clamps 234 Fixing of GI Barbed wire for anti climbing 235 Sundry items like aluminium Lugs, jumpers, binding , Tape. 236 Fixing of LT Distribution Box for 63/100 KVA DTR with MCCB for incomer & SFUs for Outgoing Circuits 237 Fixing of LT Distribution Box for 200/250/300/400 KVA DTR with MCCB for incomer & SFUs for Outgoing Circuits 238 Laying of 3 and a half corePVC 95 mmsqLT XLPE Cable/ AB Cable 239 Fixing of LT Distribution Box for 500/630 KVA DTR with MCCB for incomer & SFUs for Outgoing Circuits 240 Fixing of Nuts & Bolts 241 Fixing of 32/63 amps TPN Switch Disconnector Fuse Unit 242 Dismantling of HT/LT Leads 243 Dismantling of old 1- phase/ 3-phase energy meter 244 Dismantling of Prodigy Meter 245 Erection of Prodigy Meter 246 Fabrication & fixing of LT Switch made of angle Iron 50x50x6 with LT busbar 50x6mmon bus bar insulator 247 Fabrication, Instalation, Testing and commissioning of LT fuse set comprising of requisite Al bus bar mounted on LT polymer insulator assembled on angle iron frame including necessary clamps 248 Fixing of 1-phase/3-phase energy meter 249 Fixing of Bobin Insulator 250 Making & Fixing of cradle guard of 8 SWG G.I. Wire comprising of 10 no. cross pieces per spam including connection to earth on both side 251 Straightening of 11 mtr long ST Pole (ST-410SP56) 252 Straightening of 8 mtr long PCC Pole 253 Straightening of 8 mtr long ST Pole (ST-410SP15) 254 Straightening of 9 mtr long PCC Pole 255 Straightening of 9 mtr long ST Pole (ST-410SP33) 256 Transportation of Write back of Dismantled Material to Divisional Store BATOTE 257 Watch and ward of material at site

Key Value

Document Fees
INR 2000 /-
EMD
INR 100000.0 /-
Tender Value
Refer document

Attachment

FileName File Description File Size
Click here to download tender document Tender Documents 0 KB
Click here to download tender document Tender Documents 0 KB
Click here to download tender document Tender Documents 0 KB
Click here to download tender document Tender Documents 0 KB
Click here to download tender document Tender Documents 0 KB
Click here to download tender document Tender Documents 0 KB
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail