| 1 | Dismantling, Fabrication & Erection Jobs |
| 2 | Dismantling, fabrication & erection of ESP (field No. 1) casing – front side (Co-gen plant) |
| 3 | Dismantling, fabrication & erection of ESP (field No. 1) casing – back side (Co-gen plant) |
| 4 | Dismantling, fabrication & erection of ESP (field No.2) casing – front side. (Co-gen plant) |
| 5 | Dismantling, fabrication & erection of ESP (field No.2) casing – back side. (Co-gen plant) |
| 6 | Dismantling, fabrication & erection of wornout of ducting of ID fan (Co-gen plant) |
| 7 | Dismantling, fabrication & erection of casing of ID fan (Co-gen plant) |
| 8 | Dismantling, fabrication & erection of wornout ducting from ESP to ID fan (Co-gen plant) |
| 9 | Dismantling, fabrication & erection of wornout ducting from ID to wet scrubber (Co-gen plant) |
| 10 | Dismantling, fabrication & erection of ash screw conveyor. (Co-gen plant) |
| 11 | Dismantling, fabrication & erection of trough of screw conveyor. (Co-gen plant) |
| 12 | Dismantling, fabrication & erection of ESP (field No. 1) collection hopper. (Co-gen plant) |
| 13 | Dismantling, fabrication & erection of ESP (field No. 2) collection hopper. (Co-gen plant) |
| 14 | Dismantling, fabrication & erection of ESP (field No. 1, 2) pent house. (Co-gen plant) |
| 15 | Dismantling & fitting of both collecting and discharge electrode of ESP in all respect. (Co-gen plant) |
| 16 | Dismantling & erection of grate bars of travelling grate. (Co-gen plant) |
| 17 | Repair of travelling grate chain. (Co-gen plant) |
| 18 | Replacement of side plate of slot chain. (Co-gen plant) |
| 19 | Replacement of trough of slot chain. (Co-gen plant) |
| 20 | Replacement of flat of slot chain. (Co-gen plant) |
| 21 | M.S. patch work. (Co-gen plant) |
| 22 | Replacement of wornout Trough/side plates of all carriers. |
| 23 | Erection of valve |
| 24 | Dismantling, fabrication and erection of tail pipe |
| 25 | Dismantling and refitting of 2 nos. NK-1100 Continuous machine at its existing position after strengthening of base grinder, channels, angles etc, Alco to be placed rubber pads, repair of bottom portion of cfg. Machine and master level position to be done to avoid any working with trial. |
| 26 | Repair of condensate valve. |
| 27 | Repair of arm of Crystallizer, magma mixture |
| 28 | Dismantling & erection of foot valve. |
| 29 | Dismantling, Fabrication & Fitting of S.S. Ring for continuous Cfg. machine |
| 30 | Replacement of side plate of fiberizer (S.S. & M.S.). |
| 31 | Dismantling and erection of bottom blend of saveall. |
| 32 | Dismantling, fabrication and erection of round tank /square. |
| 33 | Dismantling and erection of cone of round tank. |
| 34 | Dismantling, fabrication and erection of Cfg. Machine chute |
| 35 | Replacement of M.S. plate of donga. |
| 36 | Repair/modification of pan/evaporator/juice heater, valves for vapour/exhaust. |
| 37 | Dismantling and erection of valve above 12” |
| 38 | Dismantling, Fabrication & Erection of bottom of Dorr clarifier compartment. |
| 39 | Strengthening of structure of cane unloaders. |
| 40 | Replacement of M.S. square bar of cane unloader |
| 41 | Dismantling, fabrication and erection of M.S. structure of APCD plant. |
| 42 | Strengthening of M.S. structure of APCD plant |