| 1 | Transportation of 40m GB tower material including ladder, working platform, cable tray and antenna fixtures etc. and Type-I BTS shelter with all materials and all thesturctural members of BTS shelter like PU foamwall, floor and roof pannels , Roofing sheets , Flooring Ply sheet, Antistatic Flooring , Door, M.S. Girder Section etc. by maintaining the safety precautions toavoid any damage to materials etc. all from the departmental store at SSA HQ orsome other city / placeto the siteofworkunderconsideration or vice versa.The item includes sorting (if required), loading, unloading and stacking of the material all complete and as per the directions of Engineer- in-charge. |
| 2 | 40 m GB tower materials and Type-I BTS shelter approx. weight 10.00 MT and distance up to 50 km |
| 3 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. |
| 4 | All kinds of soil |
| 5 | Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials. |
| 6 | All kinds of soil. |
| 7 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. |
| 8 | Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. |
| 9 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. |
| 10 | Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) |
| 11 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. |
| 12 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved. |
| 13 | Labour Charges for dismantling and dismembering of existing 40 metre high Ground Based tower (Approx. weight 10.00 MT) made of mild steel flat, tees, Angles, Channels, tubes etc. including associated Components like wave guide , Ladders, railing, Antena , Earthing patti, Platform, fixtures , Aviation Light Assembly etc. including sorting of tower members / nuts and bolts washers etc. Including bundling of Similar Small plates , Small Angle & flat Section by binding with G.I.Wiresproperly and packaging of all nuts and bolts in gunny bags Complete as per direction of Engineer-in-Charge. The payment shall be made on the weight basis and for it the electronic weighment slip shall be produced by the Agency. The rate are inclusive of all above operations including Electronic Weighment Charges, Toll Taxes , insurance Charges of man and materials in visinity , providing G.I. binding wires and gunny bags for which nothing extra shall be paid to the Agency. |
| 14 | Dismantling and dismembering of Type I BTS Shelter size approx. 2.13m x3.13mx2.76m, made of PU foamwall, floor and roof pannels , Roofing sheets , Flooring Ply sheet, Antistatic Flooring , Door, M.S. Girder Section etc. carefully. Including sorting of Shelter members, fixtures and fittings of door like hinges , latch lock etc. properly Complete and lowering of all materials from terrace to Ground as per direction of Engineer-in-Charge. The rate are inclusive of all above operations including Electronic Weighment Charges, Toll Taxes , insurance Charges of man and materials in visinity , providing G.I. binding wires, wooden boxes and gunny bags for which nothing extra shall be paid to the Agency. The small articles received shall be packed in a wooden box/plastic bag arraned by the Agency. |
| 15 | Credit to department for taking away unseviceable dismantal steel materials beyond the requirement of the department etc. all complete as per direction of engineer-in-charge. |