}

Supply Of Twin Pipe Brake System., howrah-West Bengal

Eastern Railways has published Supply Of Twin Pipe Brake System.. Submission Date for this Tender is 05-08-2025. Railway Ancillaries Tenders in howrah West Bengal. Bidders can get complete Tender details and download the document.




Tender Notice

50173889
Supply Of Twin Pipe Brake System.
Tender
Indian
West Bengal
Howrah
05-08-2025

Tender Details

Supply Of Twin Pipe Brake System.Twin Pipe Brake System.,Heavy Duty Seamless Iron Pipe Size- Dia: 1-1/4 Inch, Od-42.20 & Id-35, Thickness: 2Mm [ W Arranty Period: 30 Months After The Date Of Delivery ] ] , Ms Straight Reducer 1-1/4 To 1 [ Warranty Period: 30 Months After The Date Of Delivery ] ] , 1 1/4 Inch M S Clamp For Pneumatic Pipes As Per Kpa Drg. No. Er/Kpa/El.Ar.4G5.4033A, Item No.6. [ Warranty Period: 30 Months After The Date Of Delivery ] ] , Ms Elbow Reducer 1-1/4 To 1. [ Warranty Period: 30 Months After The Date Of Delivery ] ] , Copper Pipe 6Mm Od X 1Mm Thk X 6 Mtrs. Length Copper Pipe As Per Clw Specification No. Clw/Ms/3/030 Alt.12 Or Latest [ Warranty Period: 30 Months After The Date Of Delivery ] ] , Ms Clamp 1/4 ]

Key Value

Document Fees
Refer document
EMD
Refer document
Tender Value
Refer document
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail