Tender For Pasture Development Work Nathawada Ps Bherunda - 1 Excavation work of soil by JCB machine/tractor with scraper, breaking of clods of excavated soil, sorting of grass & pebbles, and maintaining section/profile of bund (in cut area) including lifting and lowering initial lead 250 m and lift upto 3 m. Draft based on chapter 5th of irrigation page number 32 to 34 (Valid from Date 01/02/2017) Unit 1 Cubic Meter Machinery Work in Hard Soil 2 Dogbelling 5 cm to 7.5 cm upto depth 3 Excavate soil upto 1.5 depth in foundation, trench, drain, tamp the bottom, pour water, groom the sides, take out the excavated soil, fill the empty spaces with soil again after filling the foundation and dispose of the remaining soil upto a distance of 50 meters in normal/soft soil 4 In cement concrete foundation or floor, put 40 mm nominal size stone aggregate (crusher broken) / brick aggregate in cement-sand mixture, in the ratio of 1 cement: 4 sand: 8 soil and tamp, including tamping. 5 180cm height fencing iron post 50X50X6mm at 3m distance and 45cm in ground cement concrete 1:2:4 (.30X.30X.60m) corner and every 10th post supported by 50X50X6mm iron post, along with black barbed wire in 6 lines and 2 diagonal lines, tying and fitting with GI staple wire between 2 posts, including soil excavation work 6 Transportation of soil for various distances including loading, unloading and staking of material. (Transportation length will be calculated from nearest route and not by road) 10 Km. 7 okfudh ,oa Qynkj ikS/ks lIykbZ djuk 3 QhV ls Åij o 5 QhV dh ÅapkbZ rd ds ikS/ks cM+h FkSyh esaMARKET RATE 8 ikS/kkkyk ls o`{kkjksi.k LFky rd 40 fdyks ehVj rd dh nwjh ds fy, ikS/kksa dh 9 Cement Concrete 1 Cement : 4 Gravel and 8 Ballast Stone of 40 mm nominal size including pouring, ramming and tamping etc. in the foundation. ( feDlj ,.M ckbZczsVj ) 10 Cement Concrete 1 Cement : 2 Gravel : 4 Stone in aggregate ratio with aggregate of 12 mm nominal size Including pouring, tamping and tamping etc. 11 Cement plaster on wall with cement-gravel mixture in 1:4 ratio, scraping joints and regular tamping for 14 days, up to 25 mm thickness (for use only in watertight structures) 12 Supply of stone lintel and fixing it in mortar used in masonry. 100 to 150 mm thickness 13 Laying of roof of top quality stone slabs, filling joints with cement mortar in 1:4 ratio with stone arch at top and bottom upto 1.5 to 2.4 m span deduction Gate 14 Cement concrete 1:2:4 mixture of 1 cement 2 gravel 4 stone or bricks in 12 m thickness, including pouring, tamping, pressing and tamping etc. Stone aggregate deduction Gate 15 Whitewashing work in 3 layers to give even shade on new/old work. On new work 16 P& Laying PVC pipe 90 mm Dia including all fittings 17 Laying of stone in foundation and plinth in cement-gravel mixture, including closing of side cracks and wetting etc. Cement gravel 1:6 18 Cement plaster on wall by mixing cement-gravel in 1:6 ratio and scraping joints and regular wetting for 14 days. 25 mm 19 Cement plaster on wall by mixing cement-gravel in 1:6 ratio and scraping joints and regular wetting for 14 days. 20 mm 20 Laying and supply of quarry rubble containing 40% stone spall or gravel or ghadala, sprinkling water And pounding with a mortar. 21 Planting of saplings. Normal land 22 Providing water to plants as per available quantity (15 litres per plant). 23 Making pits. Minimum 50 cm diameter. 24 Weeding of plants. Upto 15 cm depth and upto 45 cm diameter. 25 Iron work in grills/gates etc. including cutting, mounting and fixing of flat cones, T and channel etc. 26 Clearing of forest including cutting of normal vegetation and bushes. 27 Applying enamel paint in 3 layers to give even shade. Making even surface on new work. 28 Transportation of water for different distances, including cost of water and filling and emptying. (Length of transportation will be calculated from nearest route and not by road) 2 Km 29 [kMM1 Excavation work of soil by JCB machine/tractor with scraper, breaking of clods of excavated soil, sorting of grass & pebbles, and maintaining section/profile of bund (in cut area) including lifting and lowering initial lead 250 m and lift upto 3 m. Draft based on chapter 5th of irrigation page number 32 to 34 (Valid from Date 01/02/2017) Unit 1 Cubic Meter Machinery Work in Hard Soil 2 Dogbelling 5 cm to 7.5 cm upto depth 3 Excavate soil upto 1.5 depth in foundation, trench, drain, tamp the bottom, pour water, groom the sides, take out the excavated soil, fill the empty spaces with soil again after filling the foundation and dispose of the remaining soil upto a distance of 50 meters in normal/soft soil 4 In cement concrete foundation or floor, put 40 mm nominal size stone aggregate (crusher broken) / brick aggregate in cement-sand mixture, in the ratio of 1 cement: 4 sand: 8 soil and tamp, including tamping. 5 180cm height fencing iron post 50X50X6mm at 3m distance and 45cm in ground cement concrete 1:2:4 (.30X.30X.60m) corner and every 10th post supported by 50X50X6mm iron post, along with black barbed wire in 6 lines and 2 diagonal lines, tying and fitting with GI staple wire between 2 posts, including soil excavation work 6 Transportation of soil for various distances including loading, unloading and staking of material. (Transportation length will be calculated from nearest route and not by road) 10 Km. 7 okfudh ,oa Qynkj ikS/ks lIykbZ djuk 3 QhV ls Åij o 5 QhV dh ÅapkbZ rd ds ikS/ks cM+h FkSyh esaMARKET RATE 8 ikS/kkkyk ls o`{kkjksi.k LFky rd 40 fdyks ehVj rd dh nwjh ds fy, ikS/kksa dh 9 Cement Concrete 1 Cement : 4 Gravel and 8 Ballast Stone of 40 mm nominal size including pouring, ramming and tamping etc. in the foundation. ( feDlj ,.M ckbZczsVj ) 10 Cement Concrete 1 Cement : 2 Gravel : 4 Stone in aggregate ratio with aggregate of 12 mm nominal size Including pouring, tamping and tamping etc. 11 Cement plaster on wall with cement-gravel mixture in 1:4 ratio, scraping joints and regular tamping for 14 days, up to 25 mm thickness (for use only in watertight structures) 12 Supply of stone lintel and fixing it in mortar used in masonry. 100 to 150 mm thickness 13 Laying of roof of top quality stone slabs, filling joints with cement mortar in 1:4 ratio with stone arch at top and bottom upto 1.5 to 2.4 m span deduction Gate 14 Cement concrete 1:2:4 mixture of 1 cement 2 gravel 4 stone or bricks in 12 m thickness, including pouring, tamping, pressing and tamping etc. Stone aggregate deduction Gate 15 Whitewashing work in 3 layers to give even shade on new/old work. On new work 16 P& Laying PVC pipe 90 mm Dia including all fittings 17 Laying of stone in foundation and plinth in cement-gravel mixture, including closing of side cracks and wetting etc. Cement gravel 1:6 18 Cement plaster on wall by mixing cement-gravel in 1:6 ratio and scraping joints and regular wetting for 14 days. 25 mm 19 Cement plaster on wall by mixing cement-gravel in 1:6 ratio and scraping joints and regular wetting for 14 days. 20 mm 20 Laying and supply of quarry rubble containing 40% stone spall or gravel or ghadala, sprinkling water And pounding with a mortar. 21 Planting of saplings. Normal land 22 Providing water to plants as per available quantity (15 litres per plant). 23 Making pits. Minimum 50 cm diameter. 24 Weeding of plants. Upto 15 cm depth and upto 45 cm diameter. 25 Iron work in grills/gates etc. including cutting, mounting and fixing of flat cones, T and channel etc. 26 Clearing of forest including cutting of normal vegetation and bushes. 27 Applying enamel paint in 3 layers to give even shade. Making even surface on new work. 28 Transportation of water for different distances, including cost of water and filling and emptying. (Length of transportation will be calculated from nearest route and not by road) 2 Km Treatment of pits with insecticides and fertilizers Treatment of plants with fertilizers Pesticide spray (Chloropyropotam 20 for daily use) Supply of dry manure F.YM 2 kg/plant including transportation, unloading and collection Watch and ward @ 225/Day Name & board Photograph Jali inlets L.S. No. of 2 GATE