Annual Rate Contract Of Civil Work For East Zone Vmc. (Fourth Trial)-1 04001A 0 Excavation for foundation upto 1.5 m depth including sorting out and stacking of useful materials and disposing off the excavated stuff upto 50 Meter lead.(A) Loose or soft soil 2 04001B 0 Excavation for foundation upto 1.5 m depth including sorting out and stacking of useful materials and disposing off the excavated stuff upto 50 Meter lead.(B) Dense or Hard soil 3 04001C 0 Excavation for foundation upto 1.5 m depth including sorting out and stacking of useful materials and disposing off the excavated stuff upto 50 Meter lead.(C) Hard Murrum 4 04001D 0 Excavation for foundation upto 1.5 m depth including sorting out and stacking of useful materials and disposing off the excavated stuff upto 50 Meter lead.(D) Soft rock not requiring Blasting 5 04001E 0 Excavation for foundation upto 1.5 m depth including sorting out and stacking of useful materials and disposing off the excavated stuff upto 50 Meter lead.(E) Hard Rock 6 04002A 0 Excavation for foundation for depth from 1.5 m to 3.0 m including sorting out and stacking of useful materials and disposing off the excavated stuff upto 50 Meter lead.(A) Loose or soft soil 7 04002B 0 Excavation for foundation for depth from 1.5 m to 3.0 m including sorting out and stacking of useful materials and disposing off the excavated stuff upto 50 Meter lead.(B) Dense or Hard soil 8 04002C 0 Excavation for foundation for depth from 1.5 m to 3.0 m including sorting out and stacking of useful materials and disposing off the excavated stuff upto 50 Meter lead.(C) Hard Murrum 9 04002D 0 Excavation for foundation for depth from 1.5 m to 3.0 m including sorting out and stacking of useful materials and disposing off the excavated stuff upto 50 Meter lead. (D) Soft rock not requiring Blasting 10 04002E 0 Excavation for foundation for depth from 1.5 m to 3.0 m including sorting out and stacking of useful materials and disposing off the excavated stuff upto 50 Meter lead.(E) Hard Rock 11 04003A 0 Excavation for foundation for depth from 3.0 m to 5.0 m including sorting out and stacking of useful materials and disposing off the excavated stuff upto 50 Meter lead.(A) Loose or soft soil 12 04003B 0 Excavation for foundation for depth from 3.0 m to 5.0 m including sorting out and stacking of useful materials and disposing off the excavated stuff upto 50 Meter lead.(B) Dense or Hard soil NO PER 13 04003C 0 Excavation for foundation for depth from 3.0 m to 5.0 m including sorting out and stacking of useful materials and disposing of the excavated stuff upto 50 Meter lead.(C) Hard Murrum 14 04003D 0 Excavation for foundation for depth from 3.0 m to 5.0 m including sorting out and stacking of useful materials and disposing off the excavated stuff upto 50 Meter lead.(D) Soft rock not requiring Blasting 15 04003E 0 Excavation for foundation for depth from 3.0 m to 5.0 m including sorting out and stacking of useful materials and disposing off the excavated stuff upto 50 Meter lead.(E) Hard Rock 16 04004A 0 Extra for additional depth more than 5.0 m for excavation for foundation including sorting out and stacking of useful materials and disposing of the excavated stuff upto 50 m lead.(A) Loose or soft soil 17 04004B 0 Extra for additional depth more than 5.0 m for excavation for foundation including sorting out and stacking of useful materials and disposing off the excavated stuff upto 50 m lead.(B) Dense or Hard soil 18 04004C 0 Extra for additional depth more than 5.0 m for excavation for foundation including sorting out and stacking of useful materials and disposing of the excavated stuff upto 50 m lead.(C) Hard Murrum 19 04004D 0 Extra for additional depth more than 5.0 m for excavation for foundation including sorting out and stacking of useful materials and disposing off the excavated stuff upto 50 m lead.(D) Soft rock not require Blasting 20 04004E 0 Extra for additional depth more than 5.0 m for excavation for foundation including sorting out and stacking of useful materials and disposing of the excavated stuff upto 50 m lead.(E) Hard Rock 21 04005A 0 Add extra for Disposing off the excavated stuff of above items for lead of (A) 50 m to 100 m 22 04005B 0 Add extra for Disposing off the excavated stuff of above items for lead of (B) 100 m to 200 m 23 04005C 0 Add extra for Disposing off the excavated stuff of above items for lead of (C) 200 m to 300 m 24 04005D 0 Add extra for Disposing off the excavated stuff of above items for lead of (D) 300 m to 400 m 25 04005E 0 Add extra for Disposing off the excavated stuff of above items for lead of (E) 400 to 500 m 26 4006 4.12 Filling available excavated earth (excluding rock) in trenches. plinth, sides of foundations etc. in layers not exceeding 20 cm. in depth consolidating each disposited layer by ramming and watering. 27 04007A 4.24 Filling in plinth with sand under floors including watering ramming, consolidating and dressing complete 28 04008A 0 Filling in foundation and plinth with murrum or selected soil layers of 20cm. thickness including watering, ramming and consolidating etc. complete. 29 04009A 0 Filling in foundation and plinth with brick Bats Chhara in layers of 20cm. thickness including watering, remming and consolidating etc. complete. 30 04010A 4.27 Boring holes 3.5 m deep in ordinary soil (for cast in situ piles) and getting out the soil and disposal of the surplus excavated soil as directed within a lead of 50 Meter for following diameter of pipes.(i)200 mm 31 04010B 4.27 Boring holes 3.5 m deep in ordinary soil (for cast in situ piles) and getting out the soil and disposal of the surplus excavated soil as directed within a lead of 50 Meter for following diameter of pipes.(ii) 250 mm 32 04010C 4.27 Boring holes 3.5 m deep in ordinary soil (for cast in situ piles) and getting out the soil and disposal of the surplus excavated soil as directed within a lead of 50 Meter for following diameter of pipes.(iii) 300 mm 33 04011A 4.28 Extra for under reaming inside the bore Holes for under reamed piles of following Diameter.(i) 200 mm 34 04011B 4.28 Extra for under reaming inside the bore Holes for under reamed piles of following Diameter.(ii) 250 mm 35 04011C 4.28 Extra for under reaming inside the bore Holes for under reamed piles of following Diameter.(iii) 300 mm 36 04012A 4.29 Add to or deduct from the rate for Bore Holes of 3.5 m Depth, if bore holes are made deeper or shallower than 3.5M. for Piles of following diameter.(i) 200 mm 37 04012B 4.29 Add to or deduct from the rate for Bore Holes of 3.5 m Depth, if bore holes are made deeper or shallower than 3.5M. for Piles of following diameter.(ii) 250 mm 38 04012C 4.29 Add to or deduct from the rate for Bore Holes of 3.5 m Depth, if bore holes are made deeper or shallower than 3.5M. for Piles of following diameter.(iii) 300 mm 39 04B001A 0 Excavation for foundation upto 1.5 m depth including sorting out and stacking of useful materials and disposing off the excavated stuff upto 50 Meter lead.(A) Loose or soft soil 40 04B001B 0 Excavation for foundation upto 1.5 m depth including sorting out and stacking of useful materials and disposing off the excavated stuff upto 50 Meter lead.(B) Dense or Hard soil 41 04B001C 0 Excavation for foundation upto 1.5 m depth including sorting out and stacking of useful materials and disposing off the excavated stuff upto 50 Meter lead.(C) Hard Murrum 42 04B001D 0 Excavation for foundation upto 1.5 m depth including sorting out and stacking of useful materials and disposing off the excavated stuff upto 50 Meter lead.(D) Soft rock not requiring Blasting 43 04B001E 0 Excavation for foundation upto 1.5 m depth including sorting out and stacking of useful materials and disposing off the excavated stuff upto 50 Meter lead.(E) Hard Rock CHAPTER-4 EARTH WORK (EXECUTED WITH MANUAL 44 04B002A 0 Excavation for foundation for depth from 1.5 m to 3.0 m including sorting out and stacking of useful materials and disposing off the excavated stuff upto 50 Meter lead.(A) Loose or soft soil 45 04B002B 0 Excavation for foundation for depth from 1.5 m to 3.0 m including sorting out and stacking of useful materials and disposing off the excavated stuff upto 50 Meter lead.(B) Dense or Hard soil 46 04B002C 0 Excavation for foundation for depth from 1.5 m to 3.0 m including sorting out and stacking of useful materials and disposing off the excavated stuff upto 50 Meter lead.(C) Hard Murrum 47 04B002D 0 Excavation for foundation for depth from 1.5 m to 3.0 m including sorting out and stacking of useful materials and disposing off the excavated stuff upto 50 Meter lead. (D) Soft rock not requiring Blasting 48 04B002E 0 Excavation for foundation for depth from 1.5 m to 3.0 m including sorting out and stacking of useful materials and disposing off the excavated stuff upto 50 Meter lead.(E) Hard Rock 49 04B003A 0 Excavation for foundation for depth from 3.0 m to 5.0 m including sorting out and stacking of useful materials and disposing off the excavated stuff upto 50 Meter lead.(A) Loose or soft soil 50 04B003B 0 Excavation for foundation for depth from 3.0 m to 5.0 m including sorting out and stacking of useful materials and disposing off the excavated stuff upto 50 Meter lead.(B) Dense or Hard soil 51 04B003C 0 Excavation for foundation for depth from 3.0 m to 5.0 m including sorting out and stacking of useful materials and disposing of the excavated stuff upto 50 Meter lead.(C) Hard Murrum 52 04B003D 0 Excavation for foundation for depth from 3.0 m to 5.0 m including sorting out and stacking of useful materials and disposing off the excavated stuff upto 50 Meter lead.(D) Soft rock not requiring Blasting 53 04B003E 0 Excavation for foundation for depth from 3.0 m to 5.0 m including sorting out and stacking of useful materials and disposing off the excavated stuff upto 50 Meter lead.(E) Hard Rock 54 05001A 5.1.6 Providing and laying in foundation and plinth / under floors lime concrete with hand broken stone aggregates 40mm nominal size and 40% mortar comprising of 1-Lime putty : 2-Fine sand and curing complete excluding cost of formwork. 55 05002A 5.1.8 Providing and laying in foundation and plinth / under floors lime concrete with graded brick aggregates 40 mm nominal size and 40% mortar comprising of 1-Limeputty : 2-Fine sand and curing completeexcluding cost of formwork. CHAPTER-5 CONCRETE WORK 56 05003A 5.3.2 Providing and laying cement concrete 1:3:6 (1-Cement : 3- coarse sand : 6- hand broken stone aggregates 40 mmnominal size) and curing complete excluding cost of formwork in (A) Foundation and Plinth 57 05004A 5.3.3 Providing and laying cement concrete 1:4:8 (1- Cement : 4- coarse sand : 8- hand broken stone aggregates 40 mm nominal size) and curing complete excluding cost of formwork in (A) Foundation and Plinth 58 05005A 5.3.14 Providing and laying cement concrete 1:3:6 (1- Cement : 3- Coarse sand : 6- crushed stone aggregates 20 mm nominal size) and curing complete including cost of formwork in (A) Wall Caps / Coping 59 05006A 5.3.4 Providing and laying cement concrete 1:5:10 (1- Cement : 5- Coarse sand : 10- hand broken stone aggregates 40 mm nominal size) and curing complete excluding cost of formwork in (A) Foundation and Plinth 60 05007A 5.3.2 Providing and laying cement concrete 1:3:6 (1- Cement : 3- Coarse sand : 6- Graded brick bat aggregate 40mm normal size) and curing complete excluding cost of formwork in (A) Foundation and Plinth 61 05008A 5.3.3 Providing and laying cement concrete 1:4:8 (1- Cement : 4- Coarse sand : 8- Graded Brick bats aggregate 40mm normal size) and curing complete excluding cost of formwork in (A) Foundation and Plinth 62 05009A 5.3.8 Providing and laying cement concrete 1:5:10 (1- Cement : 5- fine sand : 10- graded brick bat aggregates 40mm nominal size) and curing complete excluding cost of formwork in (A) Foundation and Plinth 63 05010AA 5.3.13 Providing and laying cement concrete 1:2:4 (1- Cement : 2- Coarse sand : 4- graded stone aggregates 20 mm nominal size) and curing complete excluding cost of formwork in (A) Foundation and Plinth 64 05010BA 5.3.13 Providing and laying cement concrete 1:2:4 (1- Cement : 2- Coarse sand : 4- graded stone aggregates 20 mm nominal size) and curing complete excluding cost of formwork in (B)Independent piers, columns, and pillars, upto floor two level 65 05011AA 5.4.1 Providing and laying cement concrete work 1:2:4 (1- Cement : 2- Coarse sand : 4- graded stone aggregates 20 mm nominal size) and curing complete excluding cost of formwork and reinforcement for reinforced concrete work in (A) Foundations, footings, Base or columns and Mass concrete 66 05011BA 5.4.1 Providing and laying cement concrete work 1:2:4 (1- Cement : 2- Coarse sand : 4- graded stone aggregates 20 mm nominal size) and curing complete excluding cost of formwork and reinforcement for reinforced concrete work in (B) Slabs, landing, shelves, Balconis , Lintels, Beams, Girders and Cantilever upto floor two level. 67 05011DA 5.4.1 Providing and laying cement concrete work 1:2:4 (1- Cement : 2- Coarse sand : 4- graded stone aggregates 20 mm nominal size) and curing complete excluding cost of formwork and reinforcement for reinforced concrete work in (D) Columns, Pillars posts and struts upto floor two level. 68 05011EA 5.4.1 Providing and laying cement concrete work 1:2:4 (1- Cement : 2- Coarse sand : 4- graded stone aggregates 20 mm nominal size) and curing complete excluding cost of formwork and reinforcement for reinforced concrete work in (E)Staircases excluding landing upto floor two level 69 05011KA 5.4.1 Providing and laying cement concrete work 1:2:4 (1- Cement : 2- Coarse sand : 4- graded stone aggregates 20 mm nominal size) and curing complete excluding cost of formwork and reinforcement for reinforced concrete work in (K)Vertical and Horizontial its upto floor two level. 70 05012A 5.4.4 Providing and laying cement concrete 1:2:4 (1- Cement : 2- Coarse sand : 4- graded stone aggregates 20 mm nominal size) for reinforced concrete Chhajjas not exceeding 10cm. thickness upto floor two level including finishing the exposed surfaces with cement mortar 1:3 (1-cement, 3 Fine sand) to give a smooth and even surface centering and formwork and curing complete excluding cost of reinforcement. 71 05013A 5.4.10 Providing Mild Steel reinfircement for R.C.C. work including bending binding, and placing in position complete upto floor two level. 72 05014AA 5.4.11 Providing H.Y.S.D. Bar reinforcement for R.C.C. work including bending, binding and placing in position complete upto floor two level 73 05014BA 5.4.11 Providing TMT Bar FE 415 reinforcement for R.C.C. work including bending, binding and placing in position complete upto floor two level 74 05014C 5.4.11 Providing TMT Bar FE 500D reinforcement for R.C.C. work including bending, binding and placing in position complete upto floor two level 75 05015A 5.4.13 Extra for additional lift of concrete for all R.C.C. work above floor two level excluding cost of reinforcment 76 05016A 5.4.13 A Extra for additional lift of reinforcing steel for all R.C.C. work above floor two level. 77 5017 5.4.16 Deduct for omiting in R.C.C. work smooth finishing of the exposed surface with cement mortar 1:3 (1-Cement : 3- Fine sand) 78 5018 5.4.18 Providing throating or plaster drip and moulding to R.C.C. Chhajja. 79 05019A 5.6.2 Providing upto floor two level precast cement concrete jali or grill 1:2:4 mix (1- Cement : 2- coarse sand : 4-graded stone aggregate 6mm nominal size) reinforced with 1.6 mm dia. Mild steel wire including roughening,cleaning, fixing and finishing in cement mortar 1:3 and curing complete. (A) 50mm thick 80 05019B 5.6.2 Providing upto floor two level precast cement concrete jali or grill 1:2:4 mix (1- Cement : 2- coarse sand : 4-graded stone aggregate 6mm nominal size) reinforced with 1.6 mm dia. Mild steel wire including roughening,cleaning, fixing and finishing in cement mortar 1:3 and curing complete. (B) 40mm thick 81 05019C 5.6.2 Providing upto floor two level precast cement concrete jali or grill 1:2:4 mix (1- Cement : 2- coarse sand : 4-graded stone aggregate 6mm nominal size) reinforced with 1.6 mm dia. Mild steel wire including roughening,cleaning, fixing and finishing in cement mortar 1:3 and curing complete. (C) 25mm thick 82 05019D 5.6. 2 Providing upto floor two level precast cement concrete jali or grill 1:2:4 mix (1- Cement : 2- coarse sand : 4-graded stone aggregate 6mm nominal size) reinforced with 1.6 mm dia. Mild steel wire including roughening,cleaning, fixing and finishing in cement mortar 1:3 and curing complete. (D) 75mm thick 83 05019E 5.6. 2 Providing upto floor two level precast cement concrete jali or grill 1:2:4 mix (1- Cement : 2- coarse sand : 4-graded stone aggregate 6mm nominal size) reinforced with 1.6 mm dia. Mild steel wire including roughening,cleaning, fixing and finishing in cement mortar 1:3 and curing complete.(E) 100mm thick 84 5020 5.6. 9 Extra for additional lift for providing and fixing in position precast R.C.C. units above floor two level 85 05021A 5.7. 1 Providing and laying damp proof course 25mm thick cement concrete 1:2:4 (1-Cement : 2 coarse sand : 4 stone aggregate 10 mm nominal size) and curing complete 86 5022 5.7. 5 Extra for providing and mixing water proofing material in Cement concrete in mix proportion recommended by the manufacturers. 87 05023AA 5.8. 1 Providing and laying controlled cement concrete M.150 for curing complete excluding cost of formwork and reinforcement for reinforced concrete work in (A) Foundations, footings,Base of columns and Mass concrete 88 05023BA 5.8. 1 Providing and laying controlled cement concrete M.150 for curing complete excluding cost of formwork and reinforcement for reinforced concrete work in (B) Walls, from top of foundation level upto floor two level 89 05023CA 5.8. 1 Providing and laying controlled cement concrete M.150 for curing complete excluding cost of formwork and reinforcement for reinforced concrete work in (C) Slabs, landing, shelves, Balconies, Lintels, Beams, Girders and Cantilever upto floor two level 90 05023DA 5.8. 1 Providing and laying controlled cement concrete M.150 for curing complete excluding cost of formwork and reinforcement for reinforced concrete work in (D) Columns, Pillars posts and struts upto floor two level. 91 05023EA 5.8. 1 Providing and laying controlled cement concrete M.150 for curing complete excluding cost of formwork and reinforcement for reinforced concrete work in (E) Staircases excluding landing upto floor two level 92 05023KA 5.8. 1 Providing and laying controlled cement concrete M.150 for curing complete excluding cost of formwork and reinforcement for reinforced concrete work in (K) Vertical and Horizontial its upto floor two level.+ NO PER 93 05024AA 5.8. 2 Providing and laying controlled cement concrete M.200 and curing complete excluding the cost of formwork and reinforcement for reinforced concrete work in (A) Foundations, footings, Base of columns and Mass concrete 94 05024BA 5.8. 2 Providing and laying controlled cement concrete M.200 and curing complete excluding the cost of formwork and reinforcement for reinforced concrete work in (B) Walls, from top of foundation level upto floor two level 95 05024CA 5.8. 2 Providing and laying controlled cement concrete M.200 and curing complete excluding the cost of formwork and reinforcement for reinforced concrete work in (C) Slabs,landing,shelves,Balconies Lintels, Beams, Girders and Cantilever upto floor two level. 96 05024DA 5.8. 2 Providing and laying controlled cement concrete M.200 and curing complete excluding the cost of formwork and reinforcement for reinforced concrete work in (D) Columns, Pillars posts and struts upto floor two level. 97 05024EA 5.8. 2 Providing and laying controlled cement concrete M.200 and curing complete excluding the cost of formwork and reinforcement for reinforced concrete work in (E) Staircases excluding landing upto floor two level 98 05024KA 5.8. 2 Providing and laying controlled cement concrete M.200 and curing complete excluding the cost of formwork and reinforcement for reinforced concrete work in (K) Vertical and Horizontial its upto floor two level. 99 05025AA 5.8. 3 Providing and laying controlled cement concrete M.250 and curing complete excluding the cost of formwork and reinforcement for reinforced concrete work in (A) Foundations, footings, Base of columns and Mass concrete. 100 05025BA 5.8. 3 Providing and laying controlled cement concrete M.250 and curing complete excluding the cost of formwork and reinforcement for reinforced concrete work in (B) Walls, from top of foundation level upto floor two level 101 05025CA 5.8. 3 Providing and laying controlled cement concrete M.250 and curing complete excluding the cost of formwork and reinforcement for reinforced concrete work in (C) Slabs,landing,shelves,Balconies, Lintels, Beams, Girders and Cantilever upto floor two level. 102 05025DA 5.8. 3 Providing and laying controlled cement concrete M.250 and curing complete excluding the cost of formwork and reinforcement for reinforced concrete work in (D) Columns, Pillars posts and struts, upto floor two level. 103 05026A 0 Providing and Laying ordinary cement concrete 1:2:4 (1- Cement 2- coarse sand : 4- graded stone aggregates 20 mm nominal size) and finishing smooth with curing etc. complete including the cost of formwork but excluding the cost of reinforsement for R.C.C work in (i) Slabs upto 8cm thickness NO PER 104 05026B 0 Providing and Laying ordinary cement concrete 1:2:4 (1- Cement 2- coarse sand : 4- graded stone aggregates 20 mm nominal size) and finishing smooth with curing etc. complete including the cost of formwork but excluding the cost of reinforsement for R.C.C work in (ii) Slabs having more than 8 cm and upto 10 cm.thickness 105 05026C 0 Providing and Laying ordinary cement concrete 1:2:4 (1- Cement 2- coarse sand : 4- graded stone aggregates 20 mm nominal size) and finishing smooth with curing etc. complete including the cost of formwork but excluding the cost of reinforsement for R.C.C work in (iii) Slabs having more than cm and upto 13 cm. thickness 106 05026D 0 Providing and Laying ordinary cement concrete 1:2:4 (1- Cement 2- coarse sand : 4- graded stone aggregates 20 mm nominal size) and finishing smooth with curing etc. complete including the cost of formwork but excluding the cost of reinforsement for R.C.C work in (iv) Slabs having more than cm and upto 15 cm.thickness 107 05027A 0 Providing and Laying controlled cement concrete M.150 and finishing smooth with curing etc. complete including the cost of formwork but excluding the cost of reinforsement for R.C. work in (i) Slabs upto 8cm thickness 108 05027B 0 Providing and Laying controlled cement concrete M.150 and finishing smooth with curing etc. complete including the cost of formwork but excluding the cost of reinforsement for R.C. work in (ii) Slabs having more than 8 cm and upto 10 cm.thickness 109 05027C 0 Providing and Laying controlled cement concrete M.150 and finishing smooth with curing etc. complete including the cost of formwork but excluding the cost of reinforsement for R.C. work in (iii) Slabs having more than 10 cm and upto 13 cm. thickness 110 05027D 0 Providing and Laying controlled cement concrete M.150 and finishing smooth with curing etc. complete including the cost of formwork but excluding the cost of reinforsement for R.C. work in (iv) Slabs having more than 13 cm and upto 15 cm.thickness 111 05028A 0 Providing and laying ordinary cement concrete 1:2:4 (1- Cement 2- coarse sand : 4- graded stone aggregates 20 mm nominal size) exposed work with curing etc. complete including the cost of formwork but excluding the cost of reinforsement for R.C.C work in (i) Slabs upto 8cm thickness 112 05028B 0 Providing and laying ordinary cement concrete 1:2:4 (1- Cement 2- coarse sand : 4- graded stone aggregates 20 mm nominal size) exposed work with curing etc. complete including the cost of formwork but excluding the cost of reinforsement for R.C.C work in (ii) Slabs having more than 8 cm and upto 10 cm.thickness NO PER 113 05028C 0 Providing and laying ordinary cement concrete 1:2:4 (1- Cement 2- coarse sand : 4- graded stone aggregates 20 mm nominal size) exposed work with curing etc. complete including the cost of formwork but excluding the cost of reinforsement for R.C.C work in (iii) Slabs having more than 10 cm and upto 13 cm. thickness 114 05028D 0 Providing and laying ordinary cement concrete 1:2:4 (1- Cement 2- coarse sand : 4- graded stone aggregates 20 mm nominal size) exposed work with curing etc. complete including the cost of formwork but excluding the cost of reinforsement for R.C.C work in (iv) Slabs having more than 13 cm and upto 15 cm.thickness 115 05029A 0 Providing and laying controlled cement concrete M.150 and exposed work with curing etc. complete including the cost of formwork but excluding the cost of reinforsement for R.C.C work in (i) Slabs upto 8cm thickness 116 05029B 0 Providing and laying controlled cement concrete M.150 and exposed work with curing etc. complete including the cost of formwork but excluding the cost of reinforsement for R.C.Cwork in (ii) Slabs having more than 8 cm and upto 10 cm.thickness 117 05029C 0 Providing and laying controlled cement concrete M.150 and exposed work with curing etc. complete including the cost of formwork but excluding the cost of reinforsement for R.C.Cwork in (iii) Slabs having more than 10 cm and upto 13 cm. thickness 118 05029D 0 Providing and laying controlled cement concrete M.150 and exposed work with curing etc. complete including the cost of formwork but excluding the cost of reinforsement for R.C.Cwork in (iv) Slabs having more than 13 cm and upto 15 cm.thickness 119 5030 0 Providing and laying ordinary cement concrete 1:2:4 (1- Cement 2- coarse sand : 4- graded stone aggregates 20 mm nominal size) for R.C.C lintel including finishing smooth with,curing etc. complete including the cost of formwork but excluding the cost of reinforcement. 120 05031A1 0 Providing and laying ordinary cement concrete 1:2:4 (1- Cement 2- coarse sand : 4- graded stone aggregates 20 mm nominal size) and finishing smooth with,curing etc. complete including the cost of formwork but excluding the cost of reinforcement for R.C.C work in (A) BEAMS :(i) Having crosssectional area 0.05 to 0.08 Sq.M 121 05031A2 0 Providing and laying ordinary cement concrete 1:2:4 (1- Cement 2- coarse sand : 4- graded stone aggregates 20 mm nominal size) and finishing smooth with,curing etc. complete including the cost of formwork but excluding the cost of reinforcement for R.C.C work in (A) BEAMS :(ii) Having crosssectional area more than 0.08Sq.M and upto 0.12 Sq.M 122 05031A3 0 Providing and laying ordinary cement concrete 1:2:4 (1- Cement 2- coarse sand : 4- graded stone aggregates 20 mm nominal size) and finishing smooth with,curing etc. complete including the cost of formwork but excluding the cost of reinforcement for R.C.C work in (A) BEAMS :(iii) Having crosssectional area more than 0.12Sq.M and upto 0.18 Sq.M 123 05031B1 0 Providing and laying ordinary cement concrete 1:2:4 (1- Cement 2- coarse sand : 4- graded stone aggregates 20 mm nominal size) and finishing smooth with,curing etc. complete including the cost of formwork but excluding the cost of reinforcement for R.C.C work in (B) COLUMNS: (i) Having crosssectional area 0.05 to 0.08 Sq.M 124 05031B2 0 Providing and laying ordinary cement concrete 1:2:4 (1- Cement 2- coarse sand : 4- graded stone aggregates 20 mm nominal size) and finishing smooth with,curing etc. complete including the cost of formwork but excluding the cost of reinforcement for R.C.C work in (B) COLUMNS: (ii) Having cross- sectional area more than 0.08 Sq.M and upto 0.18 Sq.M 125 05031B3 0 Providing and laying ordinary cement concrete 1:2:4 (1- Cement 2- coarse sand : 4- graded stone aggregates 20 mm nominal size) and finishing smooth with,curing etc. complete including the cost of formwork but excluding the cost of reinforcement for R.C.C work in (B) COLUMNS: (iii) Having cross- sectional area more than 0.12Sq.M and upto 0.18 Sq.M 126 05032A1 0 Providing and laying ordinary cement concrete M.150exposed work with curing etc. complete including the cost of formwork but excluding the cost of reinforcement for R.C.C. work in (A) BEAMS :(i) Having cross- sectional area 0.05 to 0.08 Sq.M 127 05032A2 0 Providing and laying controlled cement concrete M.150exposed work with curing etc. complete including the cost of formwork but excluding the cost of reinforcement for R.C.C. work in (A) BEAMS :(ii) Having cross- sectional area more than 0.08Sq.M and upto 0.12 Sq.M 128 05032A3 0 Providing and laying controlled cement concrete M.150exposed work with curing etc. complete including the cost of formwork but excluding the cost of reinforcement for R.C.C. work in (A) BEAMS :(iii) Having cross- sectional area more than 0.12Sq.M and upto 0.18 Sq.M 129 05032B1 0 Providing and laying controlled cement concrete M.150exposed work with curing etc. complete including the cost of formwork but excluding the cost of reinforcement for R.C.C. work in (B) COLUMNS:(i) Having cross- sectional area 0.05 to 0.08 Sq.M 11 130 05032B2 0 Providing and laying controlled cement concrete M.150exposed work with curing etc. complete including the cost of formwork but excluding the cost of reinforcement for R.C.C. work in(B) COLUMNS:(ii) Having cross- sectional area more than 0.08 Sq.M and upto 0.18 Sq.M 131 05032B3 0 Providing and laying controlled cement concrete M.150exposed work with curing etc. complete including the cost of formwork but excluding the cost of reinforcement for R.C.C. work in(B) COLUMNS:(iii) Having cross- sectional area more than 0.12Sq.M and upto 0.18 Sq.M 132 05033A1 0 Providing and laying controlled cement concrete M.200 exposed work with curing etc. complete including the cost of formwork but excluding the cost of reinforcement for R.C.C. work in(A) BEAMS :(i) Having cross- sectional area 0.05 to 0.08 Sq.M 133 05033A2 0 Providing and laying controlled cement concrete M.200 exposed work with curing etc. complete including the cost of formwork but excluding the cost of reinforcement for R.C.C. work in (A) BEAMS :(ii) Having cross- sectional area more than 0.08Sq.M and upto 0.12 Sq.M 134 05033A3 0 Providing and laying controlled cement concrete M.200 exposed work with curing etc. complete including the cost of formwork but excluding the cost of reinforcement for R.C.C. work in (A) BEAMS :(iii) Having cross- sectional area more than 0.12Sq.M and upto 0.18 Sq.M 135 05033B1 0 Providing and laying controlled cement concrete M.200 exposed work with curing etc. complete including the cost of formwork but excluding the cost of reinforcement for R.C.C. work in (B) COLUMNS:(i) Having cross- sectional area 0.05 to 0.08 Sq.M 136 05033B2 0 Providing and laying controlled cement concrete M.200 exposed work with curing etc. complete including the cost of formwork but excluding the cost of reinforcement for R.C.C. work in (B) COLUMNS:(ii) Having cross- sectional area more than 0.08 Sq.M and upto 0.18 Sq.M 137 05033B3 0 Providing and laying controlled cement concrete M.200 exposed work with curing etc. complete including the cost of formwork but excluding the cost of reinforcement for R.C.C. work in (B) COLUMNS:(iii) Having cross- sectional area more than 0.12Sq.M and upto 0.18 Sq.M 138 05034A1 0 Providing and laying controlled cement concrete M.250 exposed work with curing etc. complete including the cost of formwork but excluding the cost of reinforcement for R.C.C. work in (A) BEAMS :(i) Having cross- sectional area 0.05 to 0.08 Sq.M 139 05034A2 0 Providing and laying controlled cement concrete M.250 exposed work with curing etc. complete including the cost of formwork but excluding the cost of reinforcement for R.C.C. work in (A) BEAMS :(ii) Having cross- sectional area more than 0.08Sq.M and upto 0.12 Sq.M 140 05034A3 0 Providing and laying controlled cement concrete M.250 exposed work with curing etc. complete including the cost of formwork but excluding the cost of reinforcement for R.C.C. work in (A) BEAMS :(iii) Having cross- sectional area more than 0.12Sq.M and upto 0.18 Sq.M 141 05034B1 0 Providing and laying controlled cement concrete M.250 exposed work with curing etc. complete including the cost of formwork but excluding the cost of reinforcement for R.C.C. work in (B) COLUMNS:(i) Having cross- sectional area 0.05 to 0.08 Sq.M 142 05034B2 0 Providing and laying controlled cement concrete M.250 exposed work with curing etc. complete including the cost of formwork but excluding the cost of reinforcement for R.C.C. work in (B) COLUMNS:(ii) Having cross- sectional area more than 0.08 Sq.M and upto 0.18 Sq.M 143 05034B3 0 Providing and laying controlled cement concrete M.250 exposed work with curing etc. complete including the cost of formwork but excluding the cost of reinforcement for R.C.C. work in (B) COLUMNS: (iii) Having cross- sectional area more than 0.12Sq.M and upto 0.18 Sq.M 144 5035 0 Providing and applying anticarrasive treatment with polymer base materials to the steel rainfarcement including descaling the dust and applying the preventive coating of approved make (for the R.C.C. structures near coastal area only) etc complete. 145 5047 Providing and fixing in expansion joint 100 mm thick expansion joint board of best quality and approved make including cutting to required size and shape at all levels etc. complete as directed. 146 5048 Providing and laying and fixing 50 mm thick expansion joint by hydro cell semi rigid UV resistance with high performance laminated closed cell polythene foam joint filler in sheet foam as directed, etc. complete. 147 5049 Providing and laying and fixing 25 mm thick expansion joint by hydro cell semi rigid UV resistance with high performance laminated closed cell polythene foam joint filler in sheet foam as directed, etc. complete. 148 5050 Applying and providing Expansion joint sealing System on 100 mm vide joint including cleaning of exansion joint by mechanical means provision of adhesive and flexible membrane with required bond length as per menufracturer specification and 4mm thick alluminium strip covering with one side sloted and bolted with suitable system, inclusive of all manpower, machinery and material as per specification and as directed. NO PER 149 5051 Providing and filling the expansion joint by polymer confirm BS 4254-1983 as per required shade and specifi-cation by making groove of 50 mm x 12.5 mm lather by cutting or by repairing groove and removing mortar drop or any other foreign materials including applying primer and filling required size (oversize of joint PU foam etc. complete. 150 5052 Providing and filling the expansion joint by polymer confirm to BS 4254-1983 as per required shade and manufactured specifi- cation by making groove of 25 mm x 12.5 mm lather by cutting or by repairing groove and removing mortar drop or any other foreign materials including applying primer and filling required size (oversize of joint PU foam etc. complete 151 5053 Providing and fixing 25 cm Wide & 3mm thick exterior composite panel on existing expansion joint horizontally & vertically with all material, hardware, acessories & fittings etc completed. 152 5054 Providing and laying in position Ready Mixed M-150 grade concrete for reinforced cement conctere work , using cement content as per approved Design Mix manufactured in fully automatic batching plant and transported to site of work in transit mixer for a lead up to 10 kms having continuous agitated mixer, manufactured as per mix design of specified grade for reinforced cement concrete work including pumping of R.M.C. from transit mixer to site of laying, excluding the cost of centering shuttering finishing and reinforcement including cost of admixtures in recommended proportions as per IS: 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer - in - charge. Without Fly Ash (Min cement level as per latest IS 456 shall be maintained) 153 5055 Providing and laying in position Ready Mixed M-200 grade concrete for reinforced cement conctere work , using cement content as per approved Design Mix manufactured in fully automatic batching plant and transported to site of work in transit mixer for a lead up to 10 kms having continuous agitated mixer, manufactured as per mix design of specified grade for reinforced cement concrete work including pumping of R.M.C. from transit mixer to site of laying, excluding the cost of centering shuttering finishing and reinforcement including cost of admixtures in recommended proportions as per IS: 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer - in - charge. Without Fly Ash (Min cement level as per latest IS 456 shall be maintained) 154 5056 Providing and laying in position Ready Mixed M-250 grade concrete for reinforced cement conctere work , using cement content as per approved Design Mix manufactured in fully automatic batching plant and transported to site of work in transit mixer for a lead up to 10 kms having continuous agitated mixer, manufactured as per mix design of specified grade for reinforced cement concrete work including pumping of R.M.C. from transit mixer to site of laying, excluding the cost of centering shuttering finishing and reinforcement including cost of admixtures in recommended proportions as per IS: 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer - in - charge. Without Fly Ash (Min cement level as per latest IS 456 shall be maintained) (Cement level 450 kg ) 155 5057 Providing and laying in position Ready Mixed M-300 grade concrete for reinforced cement conctere work , using cement content as per approved Design Mix manufactured in fully automatic batching plant and transported to site of work in transit mixer for a lead up to 10 kms having continuous agitated mixer, manufactured as per mix design of specified grade for reinforced cement concrete work including pumping of R.M.C. from transit mixer to site of laying, excluding the cost of centering shuttering finishing and reinforcement including cost of admixtures in recommended proportions as per IS: 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer - in - charge. Without Fly Ash (Min cement level as per latest IS 456 shall be maintained) (Cement level 475 kg ) 156 5058 Providing and laying in position Ready Mixed M-350 grade concrete for reinforced cement conctere work , using cement content as per approved Design Mix manufactured in fully automatic batching plant and transported to site of work in transit mixer for a lead up to 10 kms having continuous agitated mixer, manufactured as per mix design of specified grade for reinforced cement concrete work including pumping of R.M.C. from transit mixer to site of laying, excluding the cost of centering shuttering finishing and reinforcement including cost of admixtures in recommended proportions as per IS: 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer - in - charge. Without Fly Ash(Min cement level as per latest IS 456 shall be maintained) (Cement level 500 kg ) 157 5059 Providing and applying anti carbonation, anti fading, mold resistant, heat insulating, and 100% acrylic breathable decorative external waterproof coating of approved shade having Viscosity @ Room Temperature by Ford cup No. B-4 (dilute 2 parts of product with I part of water) 18 to 30 sec. pH of 7.00 to 10.00 and Sp. Gravity @ Room Temperature 1.30+0.1, tested for carbon dioxide diffusion resistance properties for coating materials and coating systems for exterior masonry and concrete as per DIN EN 1062-6 (2002- 2010) by a NBA Grade A accredited institution. 158 5060 Providing and fixing premoulded compressible filler board in black colour confirming to MoRT&H Specifications (Clause 1015), having minimum density 95kg/cum, non-staining with less than 1% water absorption & compression recovery of 93% minimum as per specification for 12 mm wide expansion joint including cutting to required size and shape at all levels etc.complete as directed. 159 5061 Providing and fixing premoulded compressible filler board in black colour confirming to MoRT&H Specifications (Clause 1015), having minimum density 95kg/cum. non-staining with less than 1% water absorption & compression recovery of 93% minimum as per specification for 20 mm wide expansion joint including cutting to required size and shape at all levels etc.complete as directed. 160 5062 Providing and fixing premoulded compressible filler board in black colour confirming to MoRT&H Specifications (Clause 1015), having minimum density 95kg/cum. non-staining with less than 1% water absorption & compression recovery of 93% minimum as per specification for 40 mm wide expansion joint including cutting to required size and shape at all levels etc.complete as directed. 161 5063 Providing and applying the elastomeric joint sealant two component, high performance polysulfide formulation conforming to BS:4254 and ASTM C 920 having weathering resistance to ultra-violet rays and shall exhibit shore A hardness of 25 and have movement accommodation factor 25% including using of compatible primer of approved standard etc. complete. for 12 mm thick joint 162 5064 Providing and applying the elastomeric joint sealant two component, high performance polysulfide formulation conforming to BS:4254 and ASTM C 920 having weathering resistance to ultra-violet rays and shall exhibit shore A hardness of 25 and have movement accommodation factor 25% including using of compatible primer of approved standard etc. complete. For 20 mm thick joint 163 06001AA 6.12 Brick work using common burnt clay building bricks having crushing strength not less than 35 kg./Sq.Cm. in foundation and plinth in Cement Mortar 1:5. (1- Cement : 5 -fine sand)(A) Modular CHAPTER-6 BRICK WORK 164 06001BA 6.12 Brick work using common burnt clay building bricks having crushing strength not less than 35 kg./Sq.Cm. in foundation and plinth in Cement Mortar 1:5. (1- Cement : 5 -fine sand) ( Conventional 165 06001CA 6.12 Brick work using common burnt clay building bricks having crushing strength not less than 35 kg./Sq.Cm. in foundation and plinth in Cement Mortar 1:5. (1- Cement : 5 -fine sand) ( Fly Ash Bricks 166 06002AA 6.13 Brick work using common burnt clay building bricks having crushing strength not less than 35 kg./Sq.Cm. in foundation and plinth in Cement Mortar 1:6 (1- Cement : 6 -fine sand) ( Modular 167 06002BA 6.13 Brick work using common burnt clay building bricks having crushing strength not less than 35 kg./Sq.Cm. in foundation and plinth in Cement Mortar 1:6 (1- Cement : 6 -fine sand) ( Conventional 168 06002CA 6.13 Brick work using common burnt clay building bricks having crushing strength not less than 35 kg./Sq.Cm. in foundation and plinth in Cement Mortar 1:6 (1- Cement : 6 -fine sand) ( Fly Ash Bricks 169 06003AA 0 Brick work using common burnt clay building bricks having crushing strength not less than 35 kg./Sq.Cm. in foundation and plinth in Cement Mortar 1:8 (1- Cement : 8 -fine sand) ( Modular 170 06003BA 0 Brick work using common burnt clay building bricks having crushing strength not less than 35 kg./Sq.Cm. in foundation and plinth in Cement Mortar 1:8 (1- Cement : 8 -fine sand) ( Conventional 171 06003CA 0 Brick work using common burnt clay building bricks having crushing strength not less than 35 kg./Sq.Cm. in foundation and plinth in Cement Mortar 1:8 (1- Cement : 8 -fine sand) ( Fly Ash Bricks 172 06004AA 0 Brick work using common burnt clay building bricks having crushing strength not less than 35 kg./Sq.Cm. in foundation and plinth in Lime Mortar 1:1.5 (1- Lime putty : 1.5 -fine sand) (A) Modular 173 06004BA 0 Brick work using common burnt clay building bricks having crushing strength not less than 35 kg./Sq.Cm. in foundation and plinth in Lime Mortar 1:1.5 (1- Lime putty : 1.5 - fine sand) (B) Conventional 174 06004CA 0 Brick work using common burnt clay building bricks having crushing strength not less than 35 kg./Sq.Cm. in foundation and plinth in Lime Mortar 1:1.5 (1- Lime putty : 1.5 -fine sand) (C) Fly Ash Bricks 175 06005AA 0 Brick work using common burnt clay building bricks having crushing strength not less than 35 kg./Sq.Cm. in foundation and plinth in Lime Mortar 1: 2 (1- Lime putty : 2 -fine sand) (A) Modular 176 06005BA 0 Brick work using common burnt clay building bricks having crushing strength not less than 35 kg./Sq.Cm. in foundation and plinth in Lime Mortar 1: 2 (1- Lime putty : 2 -fine sand) (B) Conventional 177 06005CA 0 Brick work using common burnt clay building bricks having crushing strength not less than 35 kg./Sq.Cm. in foundation and plinth in Lime Mortar 1: 2 (1- Lime putty : 2 -fine sand) (C) Fly Ash Bricks 178 06006A 6.19 Extra for brick work in superstructure above plinth level upto floor two level (A) Modular 179 06006B 6.19 Extra for brick work in superstructure above plinth level upto floor two level (B) Conventional 180 06006C 6.19 Extra for brick work in superstructure above plinth level upto floor two level(C) Fly Ash Bricks 181 06007A1A 6.2 Extra for brick work in superstructure above floor two level Item No. 1(6.12) (A) Modular 182 06007A2A 6.2 Extra for brick work in superstructure above floor two level Item No. 1(6.12) (B) Conventional 183 06007A3A 6.2 Extra for brick work in superstructure above floor two level Item No. 1(6.12) (C) Fly Ash Bricks 184 06007B1A 6.2 Extra for brick work in superstructure above floor two level Item No. 2(6.13) (A) Modular 185 06007B2A 6.2 Extra for brick work in superstructure above floor two level Item No. 2(6.13) (B) Conventional 186 06007B3A 6.2 Extra for brick work in superstructure above floor two level Item No. 2(6.13) (C) Fly Ash Bricks 187 06007C1A 6.2 Extra for brick work in superstructure above floor two level Item No. 3 (A) Modular 188 06007C2A 6.2 Extra for brick work in superstructure above floor two level Item No. 3 (B) Conventional 189 06007C3A 6.2 Extra for brick work in superstructure above floor two level Item No. 3 (C) Fly Ash Bricks 190 06007D1A 6.2 Extra for brick work in superstructure above floor two level Item No. 4 (A) Modular 191 06007D2A 6.2 Extra for brick work in superstructure above floor two level Item No. 4 (B) Coventional 192 06007D3A 6.2 Extra for brick work in superstructure above floor two level Item No. 4 (C) Fly Ash Bricks 193 06007E1A 6.2 Extra for brick work in superstructure above floor two level Item No. 5 (A) Modular 194 06008A1A 6.3 (i) Half brick masonry in common brunt clay building bricks having crushing strength not less than 35 Kg/Sq.Cm. in Cement mortar 1:4 (1- Cement : 4 -coarse sand ) in foundation and plinth (A) Modular 195 06008A2A 6.3 (i) Half brick masonry in common brunt clay building bricks having crushing strength not less than 35 Kg/Sq.Cm. in Cement mortar 1:4 (1- Cement : 4 -coarse sand ) in foundation and plinth (B) Conventional 196 06008A3A 6.3 (i) Half brick masonry in common brunt clay building bricks having crushing strength not less than 35 Kg/Sq.Cm. in Cement mortar 1:4 (1- Cement : 4 -coarse sand ) in foundation and plinth (C)Fly Ash Bricks 197 06008B1A 6.3 (ii) Half brick masonry in common brunt clay building bricks having crushing strength not less than 35 Kg/Sq.Cm. in Cement mortar 1:5 (1- Cement : 5 -coarse sand ) in foundation and plinth (A) Modular 198 06008B2A 6.3 (ii) Half brick masonry in common brunt clay building bricks having crushing strength not less than 35 Kg/Sq.Cm. in Cement mortar 1:5 (1- Cement : 5 -coarse sand ) in foundation and plinth (B) Conventional 199 06008B3A 6.3 (ii) Half brick masonry in common brunt clay building bricks having crushing strength not less than 35 Kg/Sq.Cm. in Cement mortar 1:5 (1- Cement : 5 -coarse sand ) in foundation and plinth (C)Fly Ash Bricks 18 200 06008C1A 6.3 (iii) Half brick masonry in common brunt clay building bricks having crushing strength not less than 35 Kg/Sq.Cm. in Lime mortar 1:1.5 ( 1- Lime : 1.5 -coarse sand ) in foundation and plinth (A) Modular 201 06008C2A 6.3 (iii) Half brick masonry in common brunt clay building bricks having crushing strength not less than 35 Kg/Sq.Cm. in Lime mortar 1:1.5 ( 1- Lime : 1.5 -coarse sand ) in foundation and plinth (B) Conventional 202 06008C3A 6.3 (iii) Half brick masonry in common brunt clay building bricks having crushing strength not less than 35 Kg/Sq.Cm. in Lime mortar 1:1.5 ( 1- Lime : 1.5 -coarse sand ) in foundation and plinth (C)Fly Ash Bricks 203 06008E2A 6.2 Extra for brick work in superstructure above floor two level Item No. 5 (B) Coventional 204 06009AA 6.31 Half brick masonry in common brunt clay building bricks having crushing strength not less than 35 Kg/Sq.Cm. in Cement mortar 1:3 ( 1-Cement : 3-coarse sand ) with 2 Nos of 6mm Mild steel round bars after every three course embedded in Cement Mortar in foundation and plinth (A) Modular 205 06009BA 6.31 Half brick masonry in common brunt clay building bricks having crushing strength not less than 35 Kg/Sq.Cm. in Cement mortar 1:3 ( 1-Cement : 3-coarse sand ) with 2 Nos of 6mm Mild steel round bars after every three course embedded in Cement Mortar in foundation and plinth (B) Conventional 206 06009CA 6.31 Half brick masonry in common brunt clay building bricks having crushing strength not less than 35 Kg/Sq.Cm. in Cement mortar 1:3 ( 1-Cement : 3-coarse sand ) with 2 Nos of 6mm Mild steel round bars after every three course embedded in Cement Mortar in foundation and plinth (C)Fly Ash Bricks 207 06009E3A 6.2 Extra for brick work in superstructure above floor two level Item No. 5 (C) Fly Ash Bricks 208 06010A 6.32 Extra for half brick masonry in superstructure above plinth level upto floor two level. (A) Modular 209 06010B 6.32 Extra for half brick masonry in superstructure above plinth level upto floor two level. (B) Conventional 210 06010C 6.32 Extra for half brick masonry in superstructure above plinth level upto floor two level. (C)Fly Ash Bricks 211 06011AA 6.33 Extra for half brick masonry in superstructure above floor two level. (A) Modular 212 06011BA 6.33 Extra for half brick masonry in superstructure above floor two level.(B) Conventional 213 06011CA 6.33 Extra for half brick masonry in superstructure above floor two level. (C) Fly Ash Bricks 214 06012AA 6.55 Half brick thick honey- comb brick work with common burnt clay building bricks having crushing strength not less than 35 Kg/Sq.Cm. (i) In Cement Mortar 1:4 ( 1- Cement : 4 -coarse sand) 215 06012BA 6.55 Half brick thick honey- comb brick work with common burnt clay building bricks having crushing strength not less than 35 Kg/Sq.Cm. (ii) In Cement Mortar 1:5 ( 1- Cement : 5 -coarse sand) 19 NO PER 216 06012CA 6.55 Half brick thick honey- comb brick work with common burnt clay building bricks having crushing strength not less than 35 Kg/Sq.Cm. (iii) Fly Ash Brick In Cement Mortar 1:5 ( 1- Cement : 5 - coarse sand) 217 6014 Masonary work using Aerated light weight concrete block having crushing strength not less than 35 kg/sqcm for super structure above plinth level upto floor two level in cement mortar 1:5 ( 1 cement : 5 fine sand ) complete as per Technical Specification 218 6015 Providing and laying Precast Lightweight concrete hollow core wall with hollow core concrete unit of approved make & size of 92 mm thick, 600 mm wide and 2400 mm / 2600 mm / 2850 mm / 3000 mm / 3300 mm in legth made from of controlled cement concrete M20 having cube compressive strength not less than 20 MPa jointing with high strength & tensile adhesion non-shrink cementitious joint compound P.U. Foam. (Plaster not required) 219 6016 Providing and laying Precast Lightweight concrete hollow core wall with hollow core concrete unit of approved make & size of 120 mm thick, 600 mm wide and 2400 mm / 2600 mm / 2850 mm / 3000 mm / 3300 mm in legth made from of controlled cement concrete M20 having cube compressive strength not less than 20 MPa jointing with high strength & tensile adhesion non-shrink cementitious joint compound P.U. Foam. (Plaster not required) 220 6017 Providing and laying Precast Regular concrete hollow core wall with hollow core concrete unit of approved make & size of 92 mm thick, 600 mm wide and 2400 mm / 2600 mm / 2850 mm / 3000 mm / 3300 mm in legth made from of controlled cement concrete M35 having cube compressive strength not less than 35 MPa jointing with high strength & tensile adhesion non-shrink cementitious joint compound P.U. Foam. (Plaster not required) 221 6018 Providing and laying Precast Regular concrete hollow core wall with hollow core concrete unit of approved make & size of 120 mm thick, 600 mm wide and 2400 mm / 2600 mm / 2850 mm / 3000 mm / 3300 mm in legth made from of controlled cement concrete M35 having cube compressive strength not less than 35 MPa jointing with high strength & tensile adhesion non-shrink cementitious joint compound P.U. Foam. (Plaster not required) 222 07001AA 7.6 (i) Uncoursed Rubble Masonry with hard stone of approved quality in foundations and plinth in Cement Mortar 1:6 (1- cement : 6-coarse sand including levelling up etc. complete 223 07001BA 7.6 (ii) Uncoursed Rubble Masonry with hard stone of approved quality in foundations and plinth in Cement Mortar 1:5 (1- cement : 5-coarse sand including levelling up etc. complete CHAPTER-7 STONE MASONRY 20 224 07001CA 7.6 (iii) Uncoursed Rubble Masonry with hard stone of approved quality in foundations and plinth in Lime Mortar 1:1.5 (1-Lime : 1.5- coarse sand including levelling up etc. complete 225 7002 7.8 Extra over Item 7.6 for super structure above plinth level upto floor two level 226 07003A 7.9 Extra for additional lift in superstructure above floor two level. 227 07004A 7.17 A Coursed rubble masonry with hard stone of approved quality in foundations and plinth in Cement Mortar 1:6 (1-Cement : 6- coarse sand) etc. complete. 228 07005AA 7.17 B Coursed rubble masonry with stone of approved quality in foundations and plinth in Cement Mortar 1:5 (1-Cement : 5- coarse sand) etc. complete. 229 07005BA 7.17 C Coursed rubble masonry with stone of approved quality in foundations and plinth in Cement Mortar 1:4 (1-Cement : 4- coarse sand) etc. complete. 230 07005CA 7.17 D Coursed rubble masonry with stone of approved quality in foundations and plinth in Cement Mortar 1:3 (1-Cement : 3- coarse sand) etc. complete. 231 7006 7.19 Extra over item No. 7.17 for superstructure above plinth level upto floor two level 232 07007A 7.2 Extra for additional lift in superstructure above floor two level. 233 07008A 0 White Stone Bela mesonry block in course in superstructure with stone of approved quality in Lime Mortar 1:1.5 (1-Lime putty : 1.5- finesand) including packing the joints etc. complete. 234 07009A 0 White Stone Bela mesonry work in partition walls upto 15 cm thickness in cement Mortar 1:4 ( 1- Cement : 4- course sand) 235 07010A 0 White Stone Bela mesonry block in course in superstructure with stone of approved quality in Lime Mortar 1:5 (1-Cement :5- course sand) including packing the joints etc. complete. 236 07011A 0 White Stone Bela mesonry block in course in superstructure with stone of approved quality in Lime Mortar 1:6 (1-Cement 6- course sand) including packing the joints etc. complete. 237 07012A 7.75 Precast concrete block masonry (including quoin blocks jamb blocks closer etc.) with solid concrete blocks of approved size made of cement concrete 1:3:6 mix (1- Cement : 3 coarse sand: 6- graded stone aggregates of 20 mm and down grade) in foundation and plinth cement morter 1:6 238 7013 7.93 Extra for masonry work with precast concrete block in superstructue above plinth upto floor two level. 239 07014A 7.82 Precast concrete block masonry in partition walls 10 cm. thick with solid block of approved size (including quion blocks Jamb blocks closer etc.) made of C.C.1:3:6 (1- Cement : 3- coarse sand : 6 graded stone aggregates 20 mm and down grade) (A) in C.M. 1:4. 240 7015 0 Providing and laying hollow block masonry 90 mm thick using hollow concrete blocks IS 2185 (Part-I ) grade B (5.0) with Cement Mortar 1:4 laying in perfect line level and plinth preparing grading the joints incl. the cost of scaffolding and curing etc. (A) Block masonry in 1:1:8 cement lime mortar 241 7016 0 Providing and laying hollow block masonry 140 mm thick using follow blocks masonry IS 2185 (Part-I ) grade B (5.0) with Cement Mortar 1:4 laying in parfect line level and plint propering groding the jaints ind. the cast of seaffolding and quiring etc . (A) Block masonry in 1:1:8 cement lime mortar 242 7017 0 Providing and laying hollow block masonry 190 mm thick using follow blocks masonry IS 2185 (Part-I ) grade B (5.0) with Cement Mortar 1:4 laying in perfect line level and plint propering groding the jaints ind. the cast of seaffolding and quiring etc (A) Block masonry in 1:1:8 cement lime mortar 243 09001AA 9.1 Providing formwork of ordinary timber planking so as to give a rough finish including centering shuttering strutting and propping etc. Height of propping and centering below supporting floor to ceiling not exceeding 4 M. and removal of the same for in situ reinforced concrete and plain concrete work in. (A) Foundations Footings Bases of Columns etc. and Mass concrete. 244 09001B1A 9.1 Providing formwork of ordinary timber planking so as to give a rough finish including centering shuttering strutting and propping etc. Height of propping and centering below supporting floor to ceiling not exceeding 4 M. and removal of the same for in situ reinforced concrete and plain concrete work in. (B) Flat surfaces such as soffits of supspened floors slabs Landings and the like. (1) Floors etc. upto 200 mm in thickness. 245 09001B2A 9.1 Providing formwork of ordinary timber planking so as to give a rough finish including centering shuttering strutting and propping etc. Height of propping and centering below supporting floor to ceiling not exceeding 4 M. and removal of the same for in situ reinforced concrete and plain concrete work in. (B) Flat surfaces such as soffits of suspended floor roof slabs Landings and the like. (2) Floors etc. above 200mm in thickness. 246 09001CA 9.1 Providing formwork of ordinary timber planking so as to give a rough finish including centering shuttering strutting and propping etc. height of propping and centering below supporting floor to ceiling not exceeding 4 M. and removal of the same for in situ reinforced concrete and plain concrete work in. (C) Vertical surface such as walls (any thickness) partitions and the like including attached buttresses & string course & the like. CHAPTER-9 FORM WORK 22 etc