Tender For Civil Renovation Work At Kalna Ssh-1 Dismantling all types of masonry excepting cement concrete plain or reinforced, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m. Change portion of door frame 2 Plaster (to wall, floor, ceiling, etc) with sand cement mortar including rounding off or chamfering corners as directed and raking joints or roughening of concrete surface, including throating, nosing and drip course, scaffolding/staging where necessary (ground floor).[excluding cost of chipping over concrete surface] b) Plastering to inside wall with cement mortar (1:6), 15mm thick 4th Floor Changing of door frame portion 3 Supplying, fitting & fixing 1st quality Ceramic tiles in walls to match with the existing work 4nos of key stones (10mm) fixed with araldite the back of each tiles & finishing the joints white cement mixed with colouring oxide if required to match the colour of tiles including roughening of concrete surface, if necessary by synthetic adhesive & grout materials etc. Add extra upto 4 th floor-Rs 5/ Sq.m B) Wall With Sand Cement Mortar (1:3) 15 mm thick 2 mm thick cement slurry at back side of tiles using cement @ 2.91Kg/Sq.m & joint filling using white cement slurry @0.20kg/Sq.m.( Other than Coloured decorative including white, Ground floor. b)Area of each tiles above 0.09 sqm. Gr. Floor Main entrance, corridor, Lift Lobby 1st Floor Lift Lobby out side & Corridor 2nd Floor Corridor 3rd Floor Post Natal Word in side & out side corridor 4th Floor Antenatal word inside & out side corridor (d) Supplying, fitting & fixing OW Acoustic Board (mineral Fibre Acoustic Ceiling Tiles) of approved pattern and size595mm X595mm with NRC value > 0.65 should be placed in the Grid module to form a false ceiling all complete as per drawing & direction of Engineer - in- Charge. False ceiling with (i)15mm thick OW Acoustic Board/Tiles. Dialysis preparation room (3rd Floor) Total= Labour charge for fabrication and installation composite door, window, partitions made from anodized extruded alloy aluminium sections the following units : A) Glazed aluminium sliding windows made of extruded and anodj2ed alloy aluminium sections, fabric(actions, including cutting to proper shape and size drilling and alingin8 of window and shutter frame fitted with in built locking arrangements, sliding rollers and other necessary fittings fixture, adhesives and joineries along with extruded neoprene or EPDM casketing in between window frame and masonry work (walls, column, beam, lintels etc.) as well as between stars and shutter frame for fixing glass & Polysulphide sealant and in between shutter and window frame where necessary including cutting to requisite size and fixing the glass as per drawing, specification and direction of Engineer in Charge. The rate including all incidental charges of all tools and plants, including all incidental charges, adhesive, joineries such as screw, cleat angle etc. but excludes the cost of extruded aluminium sections, glass, neoprene/EPDM casketing, locking arrangement and rollers. New Pathology Unit(3rd Floor) 6 Supplying, fitting & fixing of Aluminium fixed portion wall of all aluminium sections viz top, bottom and side member, intermediate member, glazing clip made of Aluminium Alloy Extrusions conforming to IS: 733-1983 and IS: 1285-1975, anodized conforming to IS:1868- 1983, fitted with all other accessories viz. EPDM gasket, cleat, angle screws etc. including labour charges for fitting and fixing of aluminium fixed partition wall with glass / panel board all complete as per architectural drawings and direction of Engineer-in-charge.(Excluding cost of glass/ panel board, 10-12 Micron thickness Anodizing film. Natural white. a) for unsupported length of vertical member up to 1.50m. height of both ends of vertical member restrained but panel with in 0.90 sqm (unit wt of Top, bottom & side member @ 1.366; intermediate member @ 1.443; glazing clip @ 0.167 kg/m respectively) [Note : for estimate purpose construction wing may consider weight of Al-Sections for Partition wall @ 5 Kg per Sq.M] New Pathology Unit(3rd Floor) 7 Providing and fixing exterior quality Aluminium Composite Panel (ACP) wall cladding on existing Al. /MS frame work with GI brackets, ACP fixed on the existing frame work by folding the edges of ACP panel (Engraving the rear surface of ACP sheet) with CP angles, cleats and stainless Steel screws forming groves at the periphery of ACP panel. Such grooves filled with foam and silicon sealant etc. complete with all materials (but including the cost of silicon sealant), labour, scaffolding and all other incidental charges complete in all respect as per specification and direction of Engineer-in-charge. (Mode of payment is on finished surface area of ACP) (a) 3mm thick (0.25mm Al.+2.5mm LDPE +0.25mm Al. PVDF coating) New Pathology Unit(3rd Floor) Total= 8 Collapsible gate with 40mm x 40mm x 6mm Tee as top and bottom guide rail, 20mm x 10mm x 2mm vertical channels 100mm apart in fully stretched position 20mm x 5mm M.S. flats as collapsible bracings properly riveted and watered including 38mm steel rollers including locking arrangements, fitted and fixed in position with lugs set in cement concrete and including cutting necessary holes, chasing etc. in walls, floors etc. and making good damages complete. In ground floor. (Payment will be made on the area of the gate covered by two guard rails and two extreme channels). New Pathology Unit(3rd Floor) Supplying, fitting and fixing Stainless Steel railing consist of 38mm die and 900mm height vertical balustrade at every two alternative steps, 50mm die top rail, 3 (three) no’s 19mm die horizontal Stainless steel pipe and base/cover plate with Stainless Steel GRADE 304 containing 7.5% nickel (Interior Grade) Brushed/Mat finish, complete as per direction of the Engineer-in-charge. Weight of Stainless Steel railing per metre 6.5 Kg (approx.) Entrances of Building (Gr. Floor) Supplying, fitting and fixing single skin colour coated trapezoidal profile for wall cladding, Roof shall be made of 0.45mm BMT (Base Metal thickness) 0.50MM TCT (Total coated thickness excluding paint) G550 (Min 550 yield strength), of Zinc alum metallic coating (IS15965) with high solar reflectance Index (SRI) value for better cooling as per thematic technology , 1000-1015mm effective cover width with five major corrugation, 28 mm high rib spaced at 203 mm c/c subtle square fluting in the pan and the end rib shall have anti capillary groove and return leg. The stell sheet shall be fastened with 40micron zinc coated or 25 micron zinc – tin alloy coated, hex head, self – drilling screw as per IS 3566-2002 Class 3 fastener. The base still shall be coated with zinc -aluminium alloy Zinc alum (AZ150) (i.e. 55% AL-l, 43.4% Zinc, 1.6% Si) minimum of 150g/m2 coating total on both sides. Pre -painted with colour bond XRW (exterior roofing, walling) paint system of 35 micron Super Durable Pollster paint (SDP) with stable inorganic pigment with no lead contents confirming IS 15965. The sheet shall be free from defects and have brand marking of the manufacture giving product details on the back of the sheet at regular interval Confirming genuinely of the material.(Payment to be made on area of finished work). Shade near OPD ticket counter (Gr. Floor) M.S. structural works with hollow sections (square or rectangular shape) conforming to IS: 806-1968 & IS:1161-1998) connected to one another with bracket, gusset, cleat as per design, drawing & direction of Engineer-in- Charge complete including cutting to requisite shape & size, fabrication including metal arc welding conforming to IS: 816-1969 & IS: 9595 using electrodes of approved make and brand conforming to IS:814- 2004, haulage, hoisting and erection all complete. The rate includes the cost of all M.S. Hollow section, all consumables such as electrodes, gas and hire charges of all tools and plants and labour required for execution and all incidental charges (such as electricity, labour insurance) etc. complete.Payment to be made on the basis of calculated weight of structural members of MS Hollow Section as specified in relevant IS code in finished work. Payment for gusset, bracket, cleat may be made by adding the actual weight of such items with weight of finished structural members. The rates are considered for a high of erection 8 m. / 2nd floor level from the ground. Add 1.5 % extra over the rate for each additional floor or 4m. beyond the initial 8 m. or part thereof. Shade near OPD ticket counter (Gr. Floor) a) Span up to 12 Mtr (Gr. Floor) Wood work in door and window frame fitted and fixed in position complete including a protective coat of painting at the contact surface of the frame excluding cost of concrete, Iron Butt Hinges and M.S clamps. (The quantum should be corrected up to three decimals). Sishu, Gamer, etc. Switch Room, CSSD ,Store room, etc. Panel shutters of door and window, as per design (each panel consisting of single plank without joint), Including fitting and fixing the same in position but excluding the cost of hinge and other fittings. In ground floor. (In case of non-supply of single plank, penal rate of reduction of 20% will be made) (II)(a) Ordinary Teak Wood. Switch Room, CSSD ,Store room, etc.