Tender For Dismantling Fabrication And Erection Of Machinery For Year, 2025-26 - Dis., of Old M.S. Pipeline with Flange, Bend up to 12 Ø 3 Erection of Old & New M.S. Pipeline with Flange up to 12 Ø 4 Fab., & Ere. Of following up to 12 Ø (M.S.) 5 Bends Erection only (Ready made) 6 Nipples 7 Cross 8 Tee 9 Reducer 10 Dis., of Valves up to 12 Ø 11 Fitting of Valves up to 12 Ø 12 Dis., of Valves above 12 Ø 13 Fab., ofValve above 12 Ø 14 Fab., & Ere. Of following above 12 Ø 15 Bend 16 Nipple 17 Flanges 18 Tee 19 Reducer 20 Dis., of Following above 12 Ø (M.S.) 21 Bend 22 Nipple 23 Flanges 24 Reducer 25 Tee 26 Dis., of M.S. Pipeline with Bend, Flanges, Nipple etc. above 12 Ø 27 Fabrication of M.S. Pipe above 12 Ø 28 Erection of M.S. Pipe above 12 Ø 29 Fitting of M.S. Ring over Vapour pipe. 30 Dis., of M.S. Heavy Structure 31 Dis., of M.S.Light Structure 32 Fab., & Ere. Of heavy structure 33 Fab., & Ere. Of light structure 34 Dis., Fitting of Plateformusing old/New material 35 Fab., & Ere. Of M.S. Railling from Old/New Material 36 Patching of worn out portion of round/Square vessel 37 Fab., & Ere. Of Square/Round closed/open tank with required connections. 38 Dis., Cleaning & Re-Fitting of M.S. Pipeline with bends, flanges, nipples etc. 39 Dis., Fab., & Ere., of different size M.S. Coil from 1 Ø to 6 Ø including flange, Nipple etc. 40 Fab., of Pump & Motor Bed with fitting & alignment etc. 41 Up to 30 HP 42 Above 30 HP 43 Dis., & Fitting of C.C., B.C., I.RC Runners 44 Reconditioning of Links of CC., BC to suit sizesofPin & Bush 45 Reconditioning of Links of RC.& IRC to suit sizes of Pin 32 mm Ø welding in holes of links & making size on lath machine:- 46 Three Hole Link 47 One hole link 48 Dis., & Fitting of New M.S. Bottom of IRC, SRC, BC, RBC, MBC etc. 49 Dis., Fab., Ere., of runners supporting box of IRC, & SRC, BC & MBC etc. 50 Dis., & Fitting of Square bar of Cane Unloader 51 Dis., & Modification and re-alignment of runners beam as per instruction from chopper to drive end of C.C. 52 Welding of Mill roller, Coupling & Crown pinion damaged teeth to be built as per teeth gauge as per instruction of Enginner I/C. 53 Dis., Fab., & Ere. Of worn out Tail end Bend (Boot) of SRC & IRC 54 Fab., & Patching of worn out damaged portion of Boiler Feed Tank 55 Repairing of worn out portion & re-fitting bagasse feeder sliding arrangement of Boiler No. 4, 5 & 6 56 Dis., Fab., & Ere., Repairing/Replacement worn out portion of Bagasse Spreader of Boiler. 57 Dis., Repairing , Replacement & Re-fitting of Ash discharge chute of Boilers. 58 Cleaning inside, outside of 3 Nos.Boiler Chimney & Painting Inside & out side as per instruction of engineer I/C. 59 Fab., & Ere. Of Rings for the strengthening of Boiler Chimney. 60 Repairing, Fab.,& Fitting of worn out ladder of Boiler Chimney. 61 Dis., Fab., & Fitting of M.S. Sieve of Boiler No. 4 Fly Ash Arrestor 62 Dis., of Boiler No. 4 Economizer all bends & cleaning all bends & tubes at site & re-fitting with hydraulic testing. 63 Dis., Fab., & Ere. Of worn out side plate approx. 6 mm thick x 230 mm Height of C.C., IRC, SRC, BC, MBC, RBC, by new/old plate etc. 64 Welding at sprocket of CC, MBC, BE, RBC, SRC & IRC as per teeth gauge. 65 Dis., Fab., & Replacement of worn out damaged portion of boiler chimney shell. 66 Dis., of Ducting and re-fitting after modification of Boiler No. 4 Fly Ash Arrestor 67 Fab., & Ere., of Suction Cone of ID Fan of Boiler 68 Fab., & Fitting of Baga-Cillo Fan Impeller as per sample. 69 Fab., & Fitting of Baga Cillo Casing as per instruction. 70 Fab., Ere., of Rotary Drum for Bagasse Feeder Stacker. 71 Dis., Fab., & Ere. Of New Condenser Catcher Juice & Syrup. 72 Dis., Repairing, & fitting of Condenser Catchers/Juice & Syrup Catcher 73 Dis., Repairing & fitting of M.S. Coil in Melters/Melter Shell & Vice Versa with all necessary connection. 74 Dis., Repairing &Fitting of worn out Cooling Jacket of Sulphur Burner. 75 Dis., Fab., & Fitting of Sulphur Burner Scrubber(Cooler) pipe with flanges & Nipples. 76 Dis., Fab., & Fitting of Sulphur Burner Scrubber Shell up to One meter height with all necessary connection. 77 Dis., Repairing & Re-fitting of worn out sublimation pipe jacket or So2 Gas 78 Dis., Fab., & Ere.., of New Entrainment Catcher/Save all of Pan/Quad/S.K. etc. 79 Dis., Repairing & Fitting of Entrainment Catcher/ Save all/ of Pan Quad/S.K. etc. 80 Dis., & Repairing of Foot Valve strainers for quad/ spray pond/Injection pump etc 81 Dis., Repairing of worn out Stirrer Arm of Crystallizer 82 Fab., of Seed & Sugar Elevator Bucket as per sample. 83 Dis., Fab., Ere. Of Hopper Trough with Trial. 84 Dis., Fab., & Ere. Ofdown take of vacuum pan. 85 Dis., Fab. & Ere., ofdown take of S.K., Vapour Cell, Evaporator. 86 Dis., Repairing & Fitting of discharge valve seat of V/Pan 60/40 Ton 87 Dis., Fab., & Fitting of Discharge chute of C/F Machine 88 Dis., Fab., & Ere. Of Umbrella for Quad. 89 Dis., Fab., & Ere. Of Umbrella forPan 90 Dis., Repairing & Fitting of Condensate bottle of Quad & Juice heater 91 Dis., Fab., & Fitting of New Condensate bottle of ( quad & juice heater) 92 Dis., Fab., & Ere. Of Feed header at Vacuum Pan with all necessary connection. 93 Dis., Fab., & Ere., of Super heated wash water system coil in column with all necessary connection. 94 Replacement of worn out Partition plate of Juice heater header 95 Fab., Ere., & Replacement of worn out grooves of Juice heater for fitting rubber strips in Juice heater 96 Dis., Fab., & Ere. Of Syrup sulphitor Tower Cone with all necessary connection. 97 Dis., Repairing & Fitting of worn out portion of Old Cooling Coil of Twin/Mono Vertical Crystallizer & hydraulic testing with all necessary connection 98 Fab., & Ere., of Cooling Coil of Mono/Twin Vertical Crystalizer from new pipes with all body connection & hydraulic testing. 99 Modification in Magma mixter arm as per instruction 100 Dis., Fab., & Ere., of Massecute Juice/Lime/ Syrup/ Mud Gutter with all necessary connection - 07 M2 101 Dis., fab., & Ere., of Dorr compartment tray 102 Dis., Repairing & Fitting of Mud Boot of Clarifier. 103 Dis., Fab., & Ere., of Clarifier Arm with Scraper 104 Fab.,& Ere., of Cover of NK-1100/1350/1503 as per sample. 105 Shifting & re-arrangement of magma mixer with all necessary connection & driving arrangement with trial. 106 Dis., Cleaning , Re-fitting of PVC Cluster & its branch pipe with nozzle of spray pond 107 Dis., Fab., & Fitting of Quad/ Pan/ Juice heater condensate boxes. 108 Dis., Fab., & Fitting of worn out ducting of Boiler No.. 4, 5 & 6 109 Fab., Ere. Of New Screw Conveyor of Mud mixer as per sample. 110 Repairing of worn out portion of Mud conveyor Trough with complete pipeline. 111 Dis., Fab., & Fitting of Vacuum Filter Trough with all connection 112 Repairing of Vac., Filter Trough 113 Fab., & Fitting of Vac., Filter Agitator 114 Dis., Fab., & Fitting of Molasses Separator for KB-1250, KCP-1350, NK-1100 C/F Machine 115 Dis., Fab., Ere. Of Molasses distributor of Pan (Kachchuwa) 116 Dis., Fab., & Ere., of Top Tapper Cone 117 Vacuum Pan 118 Quad 119 Boiler 120 Dis., Fab., & Ere., of New Condensor of Vacuum Filter as per sample. 121 Dis., Fab., & Ere., of worn out portion of Pan/Quad Body & Boiler Shell 122 Dis., & Repairing of ID FD, SA Fan Damper 123 Dismantling of Required old flange/Blind from old pipeline upto 12 Ø line. 124 Dis., Fab., Modification & Erection of Hopper drive arrangement. 125 Dis., Fab., & Fitting of Tapper Portion of Syrup Sulphitor. 126 Fab.,of IRC & SRC Rakes 127 Fab., of Old RBC & MBC Rake 128 Dis., Fab., & Fitting of Dorr Compartment Shell 129 Dis.Fab., & Fitting of Bottom Compartment of Clarifier 130 Dis, of Old C/F Machine to fit new centrifugalMachine 131 Dis., of Old Calendria of Quad body & fitting of New Calendria with all necessary connection 132 Feb., & Ere. Of M.S. Angle valve 800 mm size as per drawing. 133 Replacement of worn out portion of Boiler ID/FD Fan Casing 134 Dis., Feb., & Ere. Of Juice withdrawal Tray of Dorr of Size 6’ length x 3’ width x 2’ height. 135 Dis. Feb. Fitting & hydraulic testing of Transient Heater. 136 Dis., Feb. & fitting of Bottom plate of So2 Scrubber 137 Dis., Feb., & Fitting of Baffle plates in Juice/syrup Sulphitor 138 Dis., Feb., & Fitting of New So2 Cooler with all pipes & accessories 139 Feb., & fitting of KB-1250 Molasses Chamber Ring. 140 Dis., Feb., & fitting of Syrup sulphitor Tank with all connection & Chimney pipe etc. complete. 141 Dis., Feb., & Fitting of complete Telescopic Valve Juice Box with all connection. 142 Repairing of damaged staging of Juice & Syrup sulphitor 143 Dis., Feb., & fitting of Chain Support Guide in Secondary Rack Carrier Under Fibrizer, Bagasse elevator, RBC, & MBC. 144 Dis., Feb., & fitting of Half bottom of crystallizer with all connection. 145 Dis., Feb., & fitting of full bottom of crystallizer with all connection. 146 Dis., Feb., & Ere. Of S.K./V. Cell/Pan/Quad Bottom saucer 147 Dis. & Fitting of Juice heater Cover. 148 Feb., of 6’x6” M.S. Tee Ring from new 12 mm thick M.S. Plate and erection around vacuum Pan. 149 Dis., Fab., & Ere. Of New Sulphur furnace with all accessories’ & connection 150 Dis., Fab., & Ere. Of M.S. Ring, Round, Quad Body (Bottom side) 151 Dis., Fab., & Ere. Of Bottom Dome of Quad 152 Dis., Fab., & Fitting of Hopper drive with satusfactory trial. 153 Repairingdampers of ID/FD/SA Fan ducting to make it leak proof. 154 Dis., Fab., & Fitting of Bagasse Cello line (Approx. length of one pcs. 155 Modification of ID Fan Hood of Boiler No.5 156 Fab., & Ere., of Ash Discharge chute of Boilers.(Appx. L- 1 x W-1 Mtr.) 157 Fab., of M.S. Bend up to 12” Ø 158 Dis.. Fab., & Ere., of Ducting plate at Fly Ash Arrestor/Boiler 159 Dis., Fab., & Ere. Of Fly Ash System D.S.M. Screen with Side M.S.plate 160 Erection & Commissioning of Vibro Screen at Filtrate Tank with all connection. 161 Dis., Fab., & Fitting of S.S. Juice Tray of Mill 162 Dis., Fab., & Fitting of Cone 163 Above One Meter Dia 164 Up to One Meter Dia. 165 Dis., Fab., & Fitting of Oil Guardof Pinion & Gear at Mills & MBC/RBC 166 Dis., Fab., & Fitting of Vertical Shell of Clarifier Mud Discharge Bottom Cone 167 Dis., Fab., & Fitting of Bottom Mud Discharge Cone of Clarifier 168 Replacement of all broken & damaged Bagasse Spreader teeth (Kanghi) from M.S. Angle of 30 Ton Boiler Bagasse feeder drum. 169 Modification of Bagasse Feeding chute of 30 Ton boiler from MBC Trough as per direction given 170 Repairing & Strengthening of Weigh Bridge Structure 171 Dis., Fab., & Ere. Of Front Beam of Boiler alignment of furnace gate, upper & lower window and Bagasse feeder spreader & wall 172 Dis., Fab., & Fitting of Feeder & Spreader Bed. 173 Dis., Fab., & Ere., of Front wall to make it leak proof by providing plate between spreader & wall 174 Dis., & Ere., of Channel of C.I. Plate near Steam Drum to make it leak proof of Boiler 175 Dis., & fitting of Demister plate in Wet Scrubber of Boiler and its trial. 176 Dis., Fab., & Fitting of man holes for various equipment. 177 Dis., of Top Ring and D.S.M. Screen,Providing a New extra ring to increase capacity of clarifier Fly Ash Arrestor. 178 Fab.of M.S flange upto 12 179 Fab., & Fitting of Transient heater for New C/F machine with necessory connection.to mono vertical crystalizer 180 Dis., Fab., & Fitting of Hanging water tank with successful trial. 181 Fab., & Fitting of New Magma Mixer with motor, pump, R.G. Box alignment work etc and gives successful trial. 182 Dis., & Fab., of Injection Pump Suction mouth piece 183 Fitting of New Lime Circulator with pipeline with successful trial 184 Alignment work of Belt Conveyor from Hopper No. 5 to Sugar elevator. 185 Repairing of damaged staging of Pan Condensor 186 Fab., & Fitting of Monitor Gate of Molasses at Centrifugal machine. 187 Repairing Cone of Lime Slaker 188 Repairing of Lime Slacker Guide Wheel and Guide Ring and to give successful trial 189 Dis., Fab., & Ere. Of Flash Tank with successful trial 190 Fab., & Ere., of Structure for lifting of vacuum filter drum 191 Dis., & Fitting of Angle /Sluice valve in Vapour/Exhaust Line above 16” Ø size 192 Repairing & Erection of Lime Vibro Screen with all necessary connection. 193 Dis., Fab., & Ere., of damaged structure of quad body 194 Dis,& Ere., of Pan Calendria (40 Ton) with all necessary connection & to gives successful trial. 195 Dis., Fab., & Fitting of Complete Shell of Pan with Tapper portion with save all of Pan 196 Dis., Fab., & Fitting of Complete shell of Quad with tapper portion.& save all 197 Dis., Fab., & Ere., of Juice Heater body shell 198 Dis., Fab., & Fitting of worn out shell of Boiler No. 5 & 6Wet Scrubber 199 New Chute for Boiler No. 4 Main Bagasse Carrier for removal of Bagasse out side 200 Repairing of ID Fan Imppeller of Boilers 201 Repairing of FD Fan Imppeller of Boilers 202 Dis., Fab., & Ere., of Donnlley chute of Mill No. 1,2, 3 & 4 203 Repairing of Donnalley chute of Mill No. 1, 2, 3 & 4 204 Dis., Fab., & Ere., of Mud Discharge chute 205 Dis., & Re-fitting of Air heater all3/2 tube plate with ducting as per instruction of site engineer/chief engineer 206 for 30 Ton Boilers 207 for 20 Ton Boiler 208 Removal of Boiler Air Heater Tubes 209 for 30 Ton Boilers 210 for 20 Ton Boiler 211 Fitting of Boiler Air heater Tubes with leakproof testing 212 for 30 Ton Boilers 213 for 20 Ton Boiler 214 Dis., Fab., & Ere., of E.T.P. Clarifier 215 Repairing of worn out Portion of E.T.P. Clarifier 216 Dis., Fab., & Ere.,ofB / C Vacuum Crystallizer shell from M.S. Plate with connection and satisfactory trial. 217 Dis., Fab., & Ere., ofRound Tanks up to 2 Mtr. Dia 218 Dis., Fab, & Ere., of So2 After Burner 219 Dis., Fab., & Ere., of So2 Sublimation Pipe 220 Fab., & Ere., of Sulphur Burner Cover 221 Dis., Fab., & Ere., of worn out Staging of Water Weighing Scale 222 Dis., Fab., & Ere., of Baga-Cillo Cyclone with Structure & connection (complete) 223 Dis., Fab., & Ere., of worn out half Shell & Recovery Tower & Top Tapper Cone and baffle plate of Syrup Sulphitor 224 Dis., Fab., & Ere., of worn out Vapour body with Catcher of Old S.K. wilh all necessary connection & trial 225 Dis., & Fitting of Cane Unloader New Rail 226 Removal of Weak & damaged furnace beam of Boilers and fabrication ,Erection of New Beam by 10 mm thick M.S. Plate 227 Dis., & Ere. Of New Side Beam of Cane Unloader Unit 228 Dis., of Dynamic Juice heater & Erection of New Dy. Juice heater with all connection of New Quad Set 229 Dis., Fab., & Ere., of Lime Slakar 230 Dismantlling of Old Weak/Worn out beam of Cane Unloader & Fitting of New Beam provided by the Mill with all necessary connetion & satisfactory trial 231 Dis., of old Jali/Screen of Wet Scrubber of Boiler No. 6 & fitting of New S.S. Tray Jali which provided by the millwith all accessories and satisfactory triall 232 Dis., & Fitting of Steam Pipelinesize 3” to 8” 233 Dis., of Old Body shell of Semikestner 800 M2 H.S. and Fab., Ere., of New Body shell from 10-12 mm M,S. Plate with save all, tapper cone, Steam jacket etc. with all necessary connection & satisfactory trial. 234 Dis., fab., & Erection of damanged shell of Boiler Chimney 235 Dis., fab., & fitting of Pressmud Discharge chute with successful trial. 236 Dis., Fab., & Ere., of broken shaft of Air Cooled Crystalizer with All Arm and successful trial. 237 Repairing of broken arm of Air Cooled Crystalizers with Old/New M.S. Plate 10 mm thick /M.S.Pipe 238 Fitting with all connection of Mass Flow Meter in Main Delvery line of Weight Juice Pump with successful trial.