Supply Of Signalling And Telecom Outdoor Cable Shifting Work Including Other Gears Inconnection With Following Work: (I) Strengthening/Rehabilitation/Reconstruction Of 10 Nos. Of Bridges (Bridge No- 20, 25, 29, 65, 49, 48, 38, 41, 76 & 86 (5 Nos. Box And 5 Nos. Pipe Pushing) In Tkx-Bksc-Ksx-Muri Section Of Adra Division. Project Id: 12.01.32.24.3.50.009, (Ii) Proposal For Conversion Of 11 Nos. Of (Bridge No. 35, 36, 34Up, 34Dn, 343Rd, 528, 528, 528, 528, 11 & 2Bk) 1X12.2Mg Span Steel Girders Into 1X12.2Mg Psc Girder Including Rcc Jackting Bet Adra-Asansol, Ksx-Bksc, Tle-Bksc And Dma-Kpk Section In Adra Division. Project Id: 12.01.32.24.3.50.006, (Iii) Construction Of New Crew Lobby, Crew Waiting Hall, Crew Counseling Room, Toilet For Ladies & Gents On The 1St Floor Of The El Building At Anara.Project Id: 12.01.16.21.1.55.002, (Iv) Estimate In Connection For Augmentation Of Existing Crew Lobby At Bksc.Project Id: 12.01.16.21.1.55.002, (V) Provision Of Earth Leakage Detector (Eld) In Various Location In Adra Division.Project Id: 12.01.33.24.4.50.001. (Vi) Strengthening/Rehabilitation/Reconstruction Of Bridges, 31 No. By Pipe Pushing And 08 No. Rehabilitation In Mdn-Gba Section. (Project Id: 12.01.32.23.1.11.002). (Vii) Strengthening/Rehabilitation/Reconstruction Of Bridges, 27 No. By Pipe Pushing And 08 No. Rehabilitation In Gba. (Project Id: 12.01.32.23.1.11.003) In Adra Division.Signalling And Telecom Outdoor Cable Shifting Work Including Other Gears Inconnection With Following Work: (I) Strengthening/Rehabilitation/Reconstruction Of 10 Nos. Of Bridges (Bridge No- 20, 25, 29, 65, 49, 48, 38, 41, 76 & 86 (5 Nos. Box And 5 Nos. Pipe Pushing) In Tkx-Bksc-Ksx-Muri Section Of Adra Division. Project Id: 12.01.32.24.3.50.009, (Ii) Proposal For Conversion Of 11 Nos. Of (Bridge No. 35, 36, 34Up, 34Dn, 343Rd, 528, 528, 528, 528, 11 & 2Bk) 1X12.2Mg Span Steel Girders Into 1X12.2Mg Psc Girder Including Rcc Jackting Bet Adra-Asansol, Ksx-Bksc, Tle-Bksc And Dma-Kpk Section In Adra Division. Project Id: 12.01.32.24.3.50.006, (Iii) Construction Of New Crew Lobby, Crew Waiting Hall, Crew Counseling Room, Toilet For Ladies & Gents On The 1St Floor Of The El Building At Anara.Project Id: 12.01.16.21.1.55.002, (Iv) Estimate In Connection For Augmentation Of Existing Crew Lobby At Bksc.Project Id: 12.01.16.21.1.55.002, (V) Provision Of Earth Leakage Detector (Eld) In Various Location In Adra Division.Project Id: 12.01.33.24.4.50.001. (Vi) Strengthening/Rehabilitation/Reconstruction Of Bridges, 31 No. By Pipe Pushing And 08 No. Rehabilitation In Mdn-Gba Section. (Project Id: 12.01.32.23.1.11.002). (Vii) Strengthening/Rehabilitation/Reconstruction Of Bridges, 27 No. By Pipe Pushing And 08 No. Rehabilitation In Gba. (Project Id: 12.01.32.23.1.11.003) In Adra Division.,