Tender For Dismantling And Fabrication And Erection-Dismantling, Fabrication & Erection Jobs 2 Dismantling of M.S./C.I./G.I. Pipe Line upto 12” 3 Dismantling of M.S./C.I./G.I. Pipe Line above 12”(vapour & exhaust line ) 4 Fabrication and Erection of M.S. Pipe line above 12” 5 Erectionof M.S./C.I./G.I. Pipe Line upto 12” 6 Dismantling of M.S./C.I. Bend,Tee,Nipple,reducer upto 12” 7 Erection of M.S./C.I. Bend,Tee,Nipple,reducer upto 12” 8 Dismantling of M.S. Flanges Blinds all sizes. 9 Erection of M.S. Flanges Blinds all sizes. 10 Dismantling of Valves/Cocks upto 12”. 11 Dismantling and Erection of MS Flat/T.Iron/Runners of Carriers. 12 Dismantling, Fabrication & Erection of MS Gutters Round or Square. 13 Dismantling of S.S.Pipe Line upto 12” 14 Erection of S.S.Pipe Line upto 12” 15 Welding Joint 16 Dismantling of M.S. Platform 17 Fabrication and ErectionofM.S. Platform 18 M.S. Patch work upto 12 mm thick plate 19 Dismantling of M.S. Structure 20 Fabrication and Erection of M.S. Structure 21 Fabrication of Inter & Secondary Carrier Racks. 22 Dismantling, Fabrication & Erection of damaged body of Mud Mixer, Magma Mixer and Pug Mill. 23 Fabrication of M.S. Bed Frame for Motor & Pump 20 to 90 H.P including pump& motor dismantle & erection. 24 Fabrication of Grit Catcher for pump. 25 Fabrication of M.S. Bed Frame for Motor & Pump 100 to 200 H.P including pump & motor dismantle & erection. 26 Dismantlingand fittingof S.S./Brass Tubes & Hydraulically tested of Pan, Quad, Juice Heater & semi Kestner.During off season. 27 Dismantling and fitting of S.S./Brass Tubes & Hydraulically tested of Pan, Quad, Juice Heater & semi Kestner. During season. 28 Dismantling, Fabrication & Erection of Man Hole 29 Dismantling, Fabrication & Erection of Agitator Tray of RVF. 30 Fabrication & Erection of M.S. vertical Strainer1.W./Spray pump 31 Fitting of sight Glass Frame complete in all respect. 32 Replacement of wornout Trough/side plates of all carriers. 33 Replacement of partition plates of header of juice heater Top/Botto 34 Dismantling, Fabrication & Erection of Centre shaft of Horizontal Crystallizer. 35 Dismantling, Fabrication & Erection of Feeding Header of Pans. 36 Dismantling, Fabrication & Erection of damaged Arm/ ScrollAir Cooled/Water Cooled/Vacuum Crystallizers. 37 Dismantling, Fabrication & Erection of worn out Pan bodies shell of 60 Ton Pan in all respect and its water, Vacuum trial. 38 Dismantling, Fabrication & Erection of worn out Pan bodies shell of 40 Ton Pan in all respect and its water, Vacuum trial. 39 Dismantling, Fabrication & Erection of worn out Pan bodies shell of 35 Ton Pan in all respect and its water, Vacuum trial. 40 Dismantling, Fabrication & Erection of wornout Top cone of Pan, Quad ,juice sulphitr,syrup sulphiterin all respect and its water/Vac.trail. 41 Plugging of Brass tubes/S.S. Tubes of Pans/Quad/Juice Heater & semi Kestner during season. 42 Dismantling, Fabrication & erection of Hood of Chopper/ Leveller Fibrizer. 43 Dismantling, Fabrication & erection of wornout bottom boot of inter rack carrier. 44 Dismantling, Fabrication & erection of damaged scrolle of Mud Mixer & Pug Mill. 45 Dismantling, Fabrication & erection of damaged Arm of Magma mixtureA,B,C& all pug mills. 46 Dismantling, Fabrication & erection of juice sulphitor Spurzer Box. 47 Dismantling, Fabrication & erection of mud/clear juice chamber of dorr clarifier. 48 Dismantling of air compressor along with its motor. 49 Erection of air compressor along with its motor complete in all respect. 50 Dismantling, Fabrication & erection of bends, vapour/exhaust pipe line above 300 mm. 51 Repair/modification of pan/evaporator/juice heater, valves for vapour/exhaust. 52 Dismantling, Fabrication & erection of resistance box body 53 Fabrication of blade for resistance box for slipring motor. 54 Dismantling, Fabrication & erection of ventury of pan condenser. 55 Repair of TRPF roller to building wornout teeth and hard facing as per profile. 56 Fabrication & erection of S.S. Bend Tee, Nipple Reducer (size thick 4/5/6 MM). 57 Dismantling, Fabrication & erection of S.S. pipe above 12” 58 Strengthening and replacement of staging column/cross beam. 59 Replacement of sugar Hopper Multi Trays. 60 Dismantling, Fabrication & erection of sugar hopper 61 Dismantling, Fabrication & erection of save all of Quad Body/V.Cell/pans. 62 Dismantling, Fabrication & erection of wornout discharge valve of pans. 63 Dismantling, Fabrication & erection recovery tower of juice sulphiter& syrup sulphiter. 64 Fabrication & erection of juice weighing Scale seat 65 Replacement of wornout steam coil of sugar melter, Vacuum Pan, Quad, J.H., S.K., V.Cell. 66 Dismantling, Fabrication & Erection of Juice Umbrella Catchall of Pans/Quad Bodies/V.Cell. 67 Repair of worn out M.S. Strips of Juice Heater Top cover for holding rubber strips. 68 Repair of worn out M.S. Strips of Juice Heater Bottom cover for holding rubber strips. 69 Dismantling, Fabrication & Erection of Condensate Bottles.. 70 Dismantling, Fabrication & Erection of primary cooler of Satwik Make SO2 furnace. 71 Dismantling, Fabrication & Erection of secondary cooler of Satwik Make SO2 furnace. 72 Dismantling, Fabrication & Erection of Bagacillo pipe 73 Repair of Donelly chutes i.e. replacement of wornout plates. 74 Dismantling, Fabrication & Erection of side Boxes/ Runners of secondary/inter rack carrier 75 Dismantling, Fabrication & Erection of pan Calanderia down take. 76 Replacement of wornout Baffle Plate of each saves all of Pan/Quad. 77 Dismantling, Fabrication & Erection of wornout portion of syrup tank. 78 Broken shaft of Magma Mixer, Pug mill, Sugar Melter, Juice Sulphiter, Brown Sugar crystallizer, Crystallizerto be repaired. 79 Dismantling, Fabrication & Erection of bagacillo cyclone of RVF. 80 Replacement of wornout inter carrier Trough with runner. 81 Replacement of wornout plates of sugar hopper. 82 Dismantling, Fabrication & Erection drving portion of hopper 83 Dismantling, Fabrication & Erection of radius portion of bagasse elevator chain/ RBC chain complete 84 Dismantling, Fabrication & Erection of juice box of double-beat valve. 85 Dismantling of shell plate of molasses storage tanks. 86 Fabrication & Erection of shell plate of molasses storage tanks. 87 Repair work of wornout roof of molasses storage tanks by carpeting 3 mm plate on entire roof. 88 Dismantling, Fabrication & Erection of M.S. tank at filtrate pit. 89 Dismantling, Fabrication & Erection of Nipples of juice heaters (Between juice heater body & double-beat valve) 90 Repair of juice heater covers (By fixing 12 mm plate on its face). 91 Fabrication & Erection of Shed for electric motors, panel boards and any other machinery parts. 92 Dismantling, fabrication & erection of molasses separator of centrifugal machine 93 Dismantling, fabrication & erection of top cover of NHEC make centrifugal machines 94 Dismantling, fabrication & erection of bottom cone of pan. 95 Replacement of worn out shell of vacuum crystallizers 96 Dismantling and erection of Rail line of cane unloader. 97 Fabrication and erection of S.S. discharge valve for melter and receiver of each sulphur furnace. 98 Dismantling, fabrication and erection of flash tank of dorr clarifier. 99 Dismantling, Fabrication & Erection of bottom of Dorr clarifier compartment. 100 Fabrication & Erection of juice coils of dorr. 101 To set right the scrappers of dorr compartment. 102 Dismantling, Fabrication & Erection of shell of quad body includingvapour & exhaust connection , all accessories in all respect 103 Dismantling, Erection of cold air blowerWith Connection 104 Strengtheningof bridge of cane unloader with plateform, 105 Strengthening of M.S. structure of A,B,C machine and D.C machine 106 Repair the save all of quad bodies andPans,S.K. 107 Dismantling, Fabrication & Erection of wornout cone of quad body to all aspects. 108 Dismantling, Fabrication & Erection of Water Jacket of sulphur furnace 109 Dismantling, Fabrication & Erection of runner box of RBC, cross carrier & bagasse elevator. 110 Replacement of bottom cone of Raw juice tank 111 Dismantling, Fabrication & Fitting of S.S. Ring for continuous cfg. machine 112 Dismantling, fabrication & erection of discharge valve seat of Pan (35T, 40T, and 60T). 113 Strengthening of structure of cane unloader no. 1/2/3. 114 Complete alignment of cane unloader bridge (both sides). 50% payment will be released after completion of job. 50% payment will be released after close of crushing season. 115 Replacement of existing shell of burners of So2 furnaces alongwith air connection 116 Replacement of Tube plates of Pan . 117 Patch work of molasses tanks no. 1,2 & 4. 118 Fabrication and erection of rubber seated valve for cut over lines of Pans. 119 Replacement of wornout bottom half portion of crystallizer. 120 Dismantling of S.S. pipe line above 12 for spray pond. 121 Fabrication/Erection of S.S. pipe line above 12 for spray pond 122 Replacement of M.S. plate of Donga. 123 Dismantling, Fabrication & Erection of Tube plate with calandria in all respect. 124 Erection of S.S. Nipple, Tee 125 Erection of S.S. Flange, bend reducer. 126 Dismantling, Fabrication & Erection of Agitator of RVF. 127 Replacement of Calanedria of Pan including vapour, exhaust and other connection in all respect. Dia. 4100 mm