}

Tender For Competitive E-Bidding For Dismantling, Fabrication And Erection Work Of Various Items And Pipelines For Season 2025-26 - Making And Installing New Covers Of Pinions Of Mill Rollers. 3 Repairing And Installing Damaged And Corroded Juice Trays F, tilhar-Uttar Pradesh

Kisan Sahkari Chini Mills Limited has published Tender For Competitive E-Bidding For Dismantling, Fabrication And Erection Work Of Various Items And Pipelines For Season 2025-26 - Making And Installing New Covers Of Pinions Of Mill Rollers. 3 Repairing And Installing Damaged And Corroded Juice Trays F. Submission Date for this Tender is 05-06-2025. Dismantling Work Tenders in tilhar Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

49446044
Tender For Competitive E-Bidding For Dismantling, Fabrication And Erection Work Of Various Items And Pipelines For Season 2025-26 - Making And Installing New Covers Of Pinions Of Mill Rollers. 3 Repairing And Installing Damaged And Corroded Juice Trays F
Tender
Indian
Uttar Pradesh
Tilhar
05-06-2025

Tender Details

Tender For Competitive E-Bidding For Dismantling, Fabrication And Erection Work Of Various Items And Pipelines For Season 2025-26 - Making and installing new covers of pinions of mill rollers.3 Repairing and installing damaged and corroded juice trays fitted under TRPF.4 Cutting and removing damaged and worn out runners of can carrier, bagasse carrier, rack carrier and installing grinder and installing new runner.5 Cutting and removing damaged and corroded side plates of fiberizer etc. and installing new plates.6 Replacing worn out and weak troughs of rack carrier no. 1,2 and 3 and secondary can carrier.7 Replacing worn out side plates of can carrier, rack carrier, bagasse carrier and secondary can carrier.8 Making and installing new and lining the groove deflector plate of fiberizer and doing steel lining.9 Removing damaged and broken square bars of bridge and trolley of can unloader and cleaning its surface using grinder and installing new square bars by pressing and welding them. 10. Renovating and installing TRPF bottom boot. Repairing old racks16 Renovating and fitting the worn cones of round tanks fitted in the mill: (a) 1.5 ft dia to 2.5 ft dia17 (b) 2.5 ft dia to 5 ft dia18 (c) Above 5 ft dia19 Profile the cut teeth of crown pinions of mill rollers with the help of provided welding rod and hard facing.20 Cutting and removing the runner box of secondary can carrier and rack carrier and giving trial by fitting the provided angle for the runner.21 Repairing the drum and teeth of TRPF roller with MS welding electrode and later hard facing.22 Removing the worn out boot of IRC/SRC in the mill and making and fitting a new one with the help of provided plate. Repairing the broken and damaged pockets of two pieces of Anbil plate fitted on the fiberizer with the given plate and hardfacing all the pockets of the complete Anbil plate Removing leaky tubes of air heater and cutting and installing new/old tubes as per size.27 Cutting and removing gully vane/plates of ID fan and making and installing new plates and giving tiles.28 Making and installing new ash suits at the neck of boilers.29 Cutting and removing damaged ducting of ID/FD fans of boiler no. 1,2,3 and making and installing new MS plates as per instructions.30 Making and installing new suction cone of ID/FD fan and giving it to run.31 Making and installing new gully top and bottom cover of ID fan and giving it to run (complete).32 Making and installing new impeller of bagasilo fan. Removing the hollow plates in the boiling house and patching them with new MS plates (up to 6 mm plate).35 Patching with 8/10/12 mm plates in various houses.36 Leak proof repair of damper of economizer and air heater.37 38 Removing leaking tubes of semicastner, juice heater, vaporline juice heater fitted on boilers of 20, 30 ton capacity and inserting new tubes and doing hydraulic test at 100 lbs.39 Replacing leaking tubes of quad vapor cell and expanding by inserting new tubes and doing hydraulic test at 100 lbs.40 Replacing leaking tubes of pans and doing hydraulic test.41 Cutting out and removing the hollow packing rivets of juice heater and replacing them with new rivets. Replacing xyh partition plate of juice heater Removing the corroded sublimation pipe of the sulphur furnace along with the jacket, making a new one, installing it and making all the connections and giving a leak proof trial.48 Opening the cooler/scrubber of the sulphur furnace and replacing the corroded cooler pipe and re-fitting it and giving a leak proof trial.49 Removing the corroded and weak gutter at various places and making a new one and installing it.50 Cutting and removing the weak external catcher fitted in the quad and pan and installing a new one.51 Cutting and removing the weak and corroded umbrella fitted in the pan and quad. gVkuk] cukdj u;k yxkuk ,oa Vªk;y nsukA (a) For 40 ton pan52 (b) For 60 ton pan53 (c) For quad54 Cutting and removing the weak sewal around the neck of the quad/pan and making a new one and installing it as per sample/drawing and giving a leak proof trial. Cutting and removing the damaged and weak feed box of 55 panes and making a new one and installing it and making all its connections and giving it a trial. Removing the old meshes of Sugar Melter/Juice Sulphiter/Syrup Sulphiter etc. and making and installing new meshes.58 Replacing the mesh bottom plate of Syrup and Molasses tank and doing leak proof welding and providing the tile.59 Cutting and removing the weak and corroded coils at various places in the mill and making and installing new ones.60 Cutting and removing the old weak manholes and making and installing new ones, flange and cover will have to be machined and installed.61 Cutting and removing the neck portion of the hopper and making and installing a new one and providing the mesh.62 Cutting and removing the trough of the old hopper (riveting) and making and fitting a new one and giving it a successful test.63 Repairing and refitting the neck suction pipe of injection/spray pump.64 Opening the nozzles and blinds in the spray pound clusters and cleaning the pipes, nozzles etc. and doing the necessary repairs and refitting and providing the mesh. 65 Light structure work (a) Dismantling.66 FabricationRepair and installation of damaged drive of Primary Clarifier installed at ETP and successful trial.138 Installation of Lime Dosing Tank on Lime Mixer Tank and Chemical Dosing Tank on Tube Settler Tank for operationalization of Sulphate Removal Plant installed in the Mill and successful trial.139 Removal of old reduction gear ckWDl and installation of new Planetary Gear Box on Crystallizer and successful trial.140 Removal of old reduction gear boss and installation of new Planetary Gear Box on Pug Mill and successful trial.141 Dismantling/Fabrication and Erection of Steam Line 4 as per IBR standards.142 Dismantling/Fabrication and Erection of 4 Bend as per IBR standards.143 Dismantling/Fabrication and Erection of 4 Flange as per IBR standards.144 Dismantling/Fabrication and Erection of Steam Line 6 as per IBR standards.145 Dismantling/fabrication and erection of 6 bend as per IBR standards146 Dismantling/fabrication and erection of 6 flange as per IBR standards/147 Dismantling of sulphited juice heater 120 HSA148 Replacement of final molasses pipe line 4 & 5/

Key Value

Document Fees
INR 590 /-
EMD
INR 100000.0 /-
Tender Value
Refer document
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail