| 1 | \"Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge.\" |
| 2 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) |
| 3 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. In cement mortar |
| 4 | \"Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates, bolts, nuts, cutting rivets, welding etc. including dismembering and stacking within 50 metres lead.\" |
| 5 | Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead. (a) For thickness of tiles 10 mm to 25 mm |
| 6 | Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead : Of area 3 sq. metres and below |
| 7 | Dismantling W.C. Pan of all sizes including disposal of dismantled materials including malba all complete as per directions of Engineer-in-Charge. |
| 8 | Dismantling of flushing cistern of all types (C.I./PVC/Vitrious China) including stacking of useful materials near the site and disposal of unserviceable materials within 50 metres lead. |
| 9 | Extra for cutting reinforcement bars manually/ by mechanical means in R.C.C. or R.B. work (Payment shall be made on the cross sectional areaof R.C.C. or R.B. work) as per direction of Engineer-in-charge. |
| 10 | Dismantling G.I. pipes / CPVC pipe(internal and External)manually / by mechanical means including stacking of pipes within 50 metres lead as per direction of Engineer-in-charge : 15 to 40 mm nominal bore |
| 11 | Providing unskilled labour at site for various type of works as required and as per direction of Engineer in charge. |
| 12 | Disposal of C& D waste / building rubbish / malba / similar unserviceable materials by mechanical means, including loading, transporting and unloading to approved Municipal dumping ground for lead upto 16 Km for all lifts as per direction of Engineer- in-Charge. Note :- (i) Item to be applicable in urban area having direction for restricted hours for movement/plying of load carrying motor vehicle of 3.5 cum or more. |
| 13 | Dumping charges for C& D waste / building rubbish/malba/similar unserviceable material payable to MCD all complete as per direction of Engineer-in-charge (Payment to be made against the receipt issued by MCD) |
| 14 | Correction factor 0.973 |
| 15 | Note:1.Multistorey structures /building means five/six storey buildings.2.The tenderer is deemed to have inspected the structures for dismantling / demolition and acquainted himself with their condition. The dismantling /demolition shall be done carefully, without causing any damage to the adjoining properties /DJB pipeline/Temple.3.The contractor shall at his own cost provide necessary barricading, danger signals and sign boards and also demarcate and isolate the working area so as to prevent unauthorized entry into premises and also ensure safety of persons and property in the vicinity of the area to be demolished.4.The description of the item of work given in the schedule of quantities should be read along with the specifications and the conditions of contract.5.The rate quoted shall be inclusive of all taxes, GST, levies, duties, cost of insurance etc. apart from the cost of labour, tools, plants, fuel, consumables, etc.6.The contractor shall comply directions of Hon’ble NGT dt. 04.12.2014 & 10.04.2015 & EIA Guidance Manual issued in February 2010.7.The contractor shall take appropriate protection measures like raising wind breakers of appropriate height on all sides of the plot/area using CGI sheets or plastic and/or other similar material to ensure that no construction material dust fly outside the plot area.8.Contractor shall follow relevant the NGT orders and if any penalty is imposed by any Govt. agency the cost of same shall be borne by the contractor.9.The matter is being monitored by Hon’ble Delhi High Court , thus the work needs to be completed within stipulated timeline.10. The contractor has submit the salvage value (As decided by Engineer-in-Charge) of serviceable materials obtained from dismantling/demolition of all structures to DDA. |