| 1 | Item Description |
| 2 | Earth work excavation in (Mar, Kankar and kankar mixeddry soil) in digging or in embankment including lead up to 30 mtr and lift up to 1.50 mtr. Including dressing making porfile and manual compaction but excluding mechaniclal compaction ID OR 4.12 ( 0.00 to 1.50 mtr) Above GL( machine/manual By any means) |
| 3 | Earth work in excavation in (Mar, rankar and kankar mixed dry soil) in digging or in embankment including lead up to 30 mtr and lift up to 1.50 mtr including dressing making profile and manual compaction but excluding mechanical compaction. ID SOR 4.12 (from 1.5 to Beyond 3 mtr) (machine/manual by any meand) |
| 4 | Earth work in excavation in saturated soil (excluding cost of dewatering) mar kabar and rankar soil in foundation of wall, pier, abutment etc. with disposal with in 30 mtr lead and 1.50 mtr lift. ID SOR 4.16 (0.00 mtr to 1.5 mtr) (machine/manual ny any means) |
| 5 | Removal of slush (excluding cost of dewatering) from the bed of nala / Ponds SOR 4.17 |
| 6 | Earth work in excavation in saturated soil ( excluding cost of dewatering) mar kabar and rankar soil in foundation of wall, pier, abutment etc. with disposal with in 30 mtr lead and 1.50 mtr lift. ID SOR 4.14 b (0.00 mtr to 1.5 mtr) (inlet, pitlet, ramp) |
| 7 | Sand filling for foundation of inlet, oulet, ramp, ghat. |
| 8 | C.C. with 1:3:6 cement sand and 25 to 50 mm stone blast including the cost of materials labour etc. required for proper complition of works inlet, oulet, ramp, ghat. |
| 9 | R.C.R Stone massonery work in 1:4 cement sand mortar including the cost of material, labour etc. required for proper completion of work. inlet, oulet, ramp, ghat. |
| 10 | Supply and fixing of 1000 mm NP3 hume pipe with collarinlet, oulet, ramp. |
| 11 | C.C. in 1:2:4 Cement, sand and 10 to 20 mm grit including the costy of materials labours and etc. to required for proper completion of work.inlet, oulet, ramp, ghat. |
| 12 | Plaster work in 1:3 c/s mortar 20mm thick on stone masonery work. |
| 13 | Dry stone boulder filling in D/s & U/S in one chamber of each (Inlet,Outlet). |
| 14 | Dewatering during the work before excavation of slus/saturarated soil by 8 HP diesel pumping set. |
| 15 | Supply & fixing of citizens inmation board at the site. (C.I.B) |