| 1 | Earth work excavation for foundation including all labour charges including initial lead,lift,etc.complete.Hard Rock by wedging and chiseling |
| 2 | Dismantlingand clearing away of RCC plinth including labour charges, machineries etc., complete. |
| 3 | Supplying and filling with M.sand for foundation and basement including cost of M-sand, filling chargesas per standard specification (watering & consolidation) with all leads and lifts as per standard specification, etc., complete. |
| 4 | Plain cement concrete in CC 1:3:6, using 20mm HBG metal including cost of cement, all materials, labour charges including consolidation, curing, all leads, lifts, as per standard specification etc., complete. |
| 5 | Plain cement concrete in C.C. 1:2 :4 mix using 20mm HB metal for plinth concrete including cost of cement and all materials, steel shuttering, labour, curing, lead, lift, Vibration etc., complete. |
| 6 | Labour charge for fixing template in correct level and alignment as per insructure of TANTRANSCOEngineer incharge including cost of labour ,lead,lift etc., complete |
| 7 | Supplying and fabrication of 20mm dia grouting bolt as per approved drawing including cost ofgalvanaisation, thread and welding for extension ofbolt if necessary, all materials, labour, lead, lift etc., complete. |
| 8 | Disposal of excess earth and there away in low lying area with a lead of 100m distance including cost of loading, transporting, spreading and levelling labour,lead, lift as directed TANTRANSCO Engineer at site complete. |
| 9 | Plastering wth CM 1:5, 20 mm thick, including cost of cement labour, curing all leads and lifts etc., complete as per standard specification |
| 10 | Colour washing two coat of cement paint over one coat of cement primer of approved colour and quality including cost of all materials, labour charges etc complete. |
| 11 | SGST to be quoted in Percentage (value alone)Ex. 9%, it should be entered as 9 only for Tamil Nadu Contractor. If the contractor is outside Tamil Nadu may be quoted as \"0\" only |
| 12 | CGST to be quoted in Percentage (value alone)Ex. 9%, it should be entered as 9 only for Tamil Nadu Contractor. If the contractor is outside Tamil Nadu may be quoted as \"0\" only |
| 13 | Inter-state GST to be quoted in percentage (value alone) Ex. 18%, it should be entered as 18 only for other than Tamil Nadu contractor. If the contractor is within Tamil Nadu may be quoted as \"0\" only |