|
| 1 | Dismantling and Refitting of Roller type Gate leaf of size3.9 x 2.40 MtrMtr(upto 30 M ) and hoist assembly - 1 No. lifting of the same up-to Platform for Repair work and lowering on Sill Beam,replacement of thrust bearing. Complete job including cost of Material (sundry) material and labour charges. |
| 2 | Dismantaling and Refitting & Cleaning of Track Rollers (8 Nos), of Roller type Gate of size 3.9 x 2.4 Mtr (upto 30 M ) - 1 No. Refitting with M. P. Grease 6 Kg. Complete job including cost of Material (sundry) material and labour charges. (Excluding Cost of New Bearing /Bush, Ref. Jobwork DSR / Bearing price list). |
| 3 | Replacing old damaged 7.5 HP Starter and fitting new Starter with proper connection for25 MT Capacity Hoist.Complete job with sundry material & Labour charges. |
| 4 | Checking & tightening of loosened various nut, bolts & replacing damaged nut bolts, etc.of 25 MT cap hoist- 1 No. complete job . Complete job with material, sundry material & Labour charges. |
| 5 | Dismantalling & Replacing old damaged Brake Coil - 1 No set by new one (200 mm Ø ) of 25 MT Cap Hoist of roller type service gate, including cost of material, sundry material and labour charges etcas per drawings, specifications and or instructions of concern in charge. |
| 6 | Straightening of Stem Rod - 1 No. of Gate of size 3.9x2.40 Mtr by using hydraulic press machine. And square thread finishing to top stem rod complete job with machinery charges. |
| 7 | Providing and ApplyingAnticorrosive coal Tar Paint double coat to gate parts withsurface cleaning complete job including cost of material and labour |
| 8 | Repairs to Air Vent pipe arrangement ofservice gatewith fabrication and erection which includes Under Warer Inspection charges @ MRBC Project |
| 9 | Dismantalling & Replacing old damaged Brake Coil - 1 No set by new one (200 mm Ø ) of 25 MT Cap Hoist of roller type Emergencygate, including cost of material, sundry material and labour charges etcas per drawings, specifications and or instructions of concern in charge |
| 10 | Replacing old damaged 7.5 HP Starter and fitting new Motor 7.5 Hp with proper connection for25 MT Capacity Hoist of Emergency Gate.Complete job with sundry material & Labour charges. |
| 11 | Removing Old Cardium Compound of wire rope (140 Mtrs) of 25 MT cap hoist- 1 No., by cleaning Agent, Applying new Cardium Compound (SAE 120)to EG Hoist.Complete job with material, sundry material & Labour charges. |
| 12 | Draining of Old Oil from RGB & filling with new gear oil GX 90 - 9 Ltr, Cleaninggear train by removing old grease & Applying M.P. Grease - 3 Kg to Gear train, Pedastal, Drum axle of 25 MT cap Hoist -1 No of Emergency gate and Service gate -3 Nos. Complete job with cost of material, sundry material & labour charges |
| 13 | Manufacturing of Lock nut for \"V\" threaded Stem Rod 110mm diafor 3.90x2.40 Mtr roller type Canal Service Gate |
| 14 | Manufacturing of C.I Sleeve cost of material ,pattern making ,machining Etc and Strengthning the gate stiffner plate by welding at MRBC Project |
| 15 | Transportation Charges of fabricated structure, material, labour,machinery from workshop/Nearest District BeedMaterial,Machinery,tools & plants Loading unloading Charges,Haulting /Detention Charges To and fro 150km.2 Trips required. |