|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 min width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides andramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: 100 % All Kinds of Soil |
| 2 | Providing and laying in position cementconcrete of specified grade excluding the cost of centring and shuttering .All work up to plinth level . 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) |
| 3 | Dumping stone including cost of stones in Horizontal on level |
| 4 | Centring and shuttering including strutting propping etc. and removal of formfor :- Foundations, footings, bases of columns etc for mass concrete. |
| 5 | Dismantling steel work in built up sections in angles, tees, flats andchannels including all gusset plates, bolts, nuts, cutting rivets, welding etc.including dismembering and stacking within 50 meters lead. |
| 6 | Supply of Labour for dismantling, opening of Steel wire ropes of 40 Meter span Jullah Bridge 5 No welder / fitter for 4 Days |
| 7 | Supply of Labour for dismantling, opening of Steel wire ropes of 40 Meter span Jullah Bridge 05 No Labour for 4 Days |
| 8 | Labour for re launching of Structural Steel work in Built up Section bridges etc excluding cost of material including tightening,fixing of Steel Wire ropes 06 No welder / fitter for 11 Days |
| 9 | Labour for re launching of Structural Steel work in Built up Section bridges etc excluding cost of material including tightening,fixing of Steel Wire ropes 06 No Labour for 11 Days |
| 10 | Structural steel work in built up sections, trusses and framed work,including cutting, hoisting, fixing in position and applying a priming coat ofapproved steel primer all complete. Riveted and bolted |
| 11 | Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer’s specifications including appropriate priming coat, preparation of surface, etc complete On steel work |
| 12 | Carriage ofmaterial by mechanical transport including loading, unloading & stacking complete Cement for an avg lead of 20 Km |
| 13 | Sand for an avg lead of 170 Km |
| 14 | Aggregate below 40 mm avg lead of 25 Km |