| 1 | Shifting/Transportation of 9.0m/6.00m metre roof top Monopole materials and other allied fixtures, all structural members of monopoles including clamps, Runways,BTS shelter with all materials and all thesturctural members of BTS shelter like PU foamwall, floor and roof pannels , Roofing sheets , Flooring Ply sheet, Antistatic Flooring , Door, M.S. Girder Section etc. by maintaining the safety precautions toavoid any damage to materials etc. all material from each work siteto BSNL Store/store Godown orplace as directed by Engineer-in charge |
| 2 | Transporting uptoa distanceof 20 Kms includingloading, unloading, stacking etc. all complete as per direction of Engineer-in-Charge. |
| 3 | Extra for transporting above 20 Kms . |
| 4 | Deduct for non transportation ofBTS shelter with all materials and all thesturctural members of BTS shelter like PU foamwall, floor and roof pannels , Roofing sheets , Flooring Ply sheet, Antistatic Flooring , Door, M.S. Girder Section etc. |
| 5 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc., up to floor five level, excluding the cost of centering, shuttering and finishing: |
| 6 | 1:2:4 (1 Cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 7 | Applying water proofing chemical Nucoat of Pidilite industries or approved equivalent as per manufacturer\"s specifications over the junctions of new and old RCC members, existing roof surface and repaired damage members due to execution of the tower erections. Surface area to be measured for payment. |
| 8 | Cement plaster 1:3 (1 cement: 3 coarse sand) finished with a floating coat of neat cement. |
| 9 | 20 mm cement plaster |
| 10 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. |
| 11 | Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) |
| 12 | Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead. |
| 13 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved. |
| 14 | Dismantling and dismembering of Type I BTS Shelter size approx. 2.13m x3.13mx2.76m including High sensitive AC shelter Box and Free cooling shelter Box, made of PU foamwall, floor and roof pannels , Roofing sheets , Flooring Ply sheet, Antistatic Flooring , Door, M.S. Girder Section etc. carefully. Including sorting of Shelter members, fixtures and fittings of door like hinges , latch lock etc. properly Complete and lowering of all materials from terrace at G+12 level to Ground as per direction of Engineer-in-Charge. The rate are inclusive of all above operations including Electronic Weighment Charges, Toll Taxes , insurance Charges of man and materials in visinity , providing G.I. binding wires, wooden boxes and gunny bags for which nothing extra shall be paid to the Agency. The small articles received shall be packed in a wooden box/plastic bag arraned by the Agency. |
| 15 | Dismantling steel work in built up section in angles , tees, plates and channels including all gusset plate bolts ,nuts cutting rebates, welding etc. including dismantling and lowering of all materials from terrace at G+12 level to Ground and stacking within 50 m lead as per the direction of Engineer-in-charge including arranging necessary scaffolding etc. for dismantling of 9.0 m/6.00m monopoles and allied structures. The rate are inclusive of all above operations including Electronic Weighment Charges, Toll Taxes , insurance Charges of man and materials in visinity , providing G.I. binding wires, wooden boxes and gunny bags for which nothing extra shall be paid to the Agency. |
| 16 | Note:1.The item also includes for following and nothing extra shall be paid :(a) The agency shall takeevery precautions against the damages to the structure of nearby structures while erectingthe tower.(b) Necessary safety precations to protect human lives, insurance cover to labour etc.shall bethe sole responsiblity of the agency.(c) Item includes for all operations, T&P, equipments, machineryetc. for the work as well as safetymeasures.2. Measurement : Themeasurement shall be done on job basis as given intheadditional conditions forthe tower. |