|
| 1 | Soak pit construction |
| 2 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil |
| 3 | 15.59:Dismantling of flexible pavement ( bituminous courses ) by mechanical means and disposal of dismantled material up to a lead of 1 kilo metre, as per direction of Engineer-in-charge. |
| 4 | OD99234/2023-2024:Dry rubble masonryforfoundation and plinth |
| 5 | OD99235/2023-2024:Filling with brick bats in the sides of soak pit |
| 6 | OD99236/2023-2024:Constructing sewer manhole of size 80x80cn inside and depth not exceeding of 120cm with 20cm thick cement concrete side walls using 1:2:4 (20mm brocken stone) and CC 1:4:8 10Cm thickusing 40mm brocken stone for bottom and plastering inside with 1:3, 12mm two coat and forming channel with CC 1:2:4, 20mm brocken stone and providing RCC Cover slab of size 120x120x10cm using 20mm brocken stone using reinforcement5kg etc complete as per standard specification. |
| 7 | OD99237/2023-2024:Supplying, laying and jointing 200mm PVC Pipe for sewer line to line and grade in trenches up to a depth of 1.50m jointing with solvent cementand filling in with water and testing the line to the required pressure excluding earth work excavation etc. using pipe @ 6kgf/cm2 etc. complete. |
| 8 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size |
| 9 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns |
| 10 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more |
| 11 | OD99238/2023-2024:Laying 60 mm thick factory made cement concrete interlocking paver block of M - 30 grade made by block making machine with strong vibratory compaction over and including 50 mm thick compacted bed of coarse sand, filling the joints with fine sand etc. all complete as per the direction of Engineer-in-charge.(Departmental Interlockings tiles are used ) |
| 12 | OD193440/2024-2025:Cleaning the filled up manholes including removingthe cover slab and removing the filled up materials and conveying the same and taking pits for disposal of the same and cover the pits with earth and put it back the cover slab at place, etc. complete within a distance of 150 m etc |
| 13 | OD99241/2023-2024:Engaging Beldar for clearing the blockage |
| 14 | OD99242/2023-2024:Engaging Plumber (fitter ) for minor repairs |
| 15 | OD99243/2023-2024:Engaging man coolies for clearing the site |