| 1 | ConversionofonekmLTSph3wirelineto3ph5wirelineincl. dismantling existing 3 conductors, stringing 3 ACSR Rabbit & 2 waeasel including conveyance . |
| 2 | Providing Stay for LT poles incl. digging & back filling pit. |
| 3 | Additional rate for refitting/redoing one Shackle set and reshackling one span while renewing any type of pole. |
| 4 | Providing Strut using LT PSC pole incl. digging & back filling pit. |
| 5 | Loading LT PSC pole from the stacking place and unloading the same at work site (transport by vehicle). |
| 6 | Fitting one set AB switch and giving connection |
| 7 | FittingoneAdditional2.4m/3mChannelcrossarm(100x50x6mm),in existing 11kV DP incl. conveyance of materials. |
| 8 | Drilling hole of various sizes on existing Channel/Cross Arm. |
| 9 | Providing one Earth using earth pipe incl. digging separate pit at standard distance away from the pole/structure & backfilling. |
| 10 | Fitting and erecting one HT PSC Pole in position incl. fitting cross arm, digging & back filling pit, drawing earth leads. |
| 11 | Loading HT PSC pole from the stacking place and unloading the same at work site (transport by vehicle). |
| 12 | Dismantling (without damage) one LT PSC/RCC pole after disconnecting stays, strut etc. and stacking the same. |
| 13 | Transferring LT 3ph 4/5 wire OH line to newly erected HT/LT pole and refitting all items to the new pole. |
| 14 | Dismantling and reconnecting Sph service connection from the OH line incl. lowering down the WP portion. |
| 15 | Dismantling and reconnecting 3ph service connection from the OH line incl. lowering down the WP portion. |
| 16 | Fittingoneset(3No.)11kVLAandgivingconnectionsexcluding earthing. |
| 17 | Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 poles excluding loading & unloading. |
| 18 | Fitting and providing one HT Stay for 11kV pole incl. digging & back filling pit. |
| 19 | Stringing of 11 kV Aerial bunched cable of size 3 x 120 + 1 x 95 sqmm with bare/insulated Messenger through existing poles |
| 20 | Erection of Anchor clamp / dead end clamp for 11kV ABC of any size |
| 21 | Erection of suspension clamp for 11KV ABC of any size |
| 22 | Providing Cable Tie |
| 23 | Fiting One no MVT on existing cross arm including 2 nos end termination (for One phase) of any rating for 11 kV AB Cable |
| 24 | Fitting and providing one Strut using HT PSC pole incl. digging & back filling pit. |
| 25 | ProvidingoneCoilEarthusingGIearthwire,diggingseparatepitat standard distance away from the pole/structure & backfilling. |
| 26 | Erecting one 100kVA Transformer to existing DP and giving connections, incl. loading & unloading, excluding transportation. |
| 27 | Transporting Transformers by hired vehicle upto 5km and upto 2 No. of 63 to 250kVA Transformers / RMUs excluding loading & unloading. |
| 28 | AdditionalrateforprovidingonediscsetonanytypeofHTpolefor making cut point. |
| 29 | Fitting and erecting one HT DP using PSC pole in position incl. fitting 2 channel cross arms, digging & back filling pit, drawing earth leads. |
| 30 | Fitting5channelcrossarms,ABswitch,DOfuse,LA,HT< connections on existing DP, 3 LT fuses. |
| 31 | Fitting one Additional V cross arm in existing single pole incl. conveyance of materials. |