| 1 | Dgragging the pantoon from dry bed to the river water and making pair and anchoring them in the down stream side of pantoon bridge. |
| 2 | Carrying of pantoon pair from the place of anchoring (down stram side of bridge) to the alignment of bridge in water and fixing the same with other pantoon pair and prefixing the same in bridge alignment. |
| 3 | Sinking of pantoons to obtain the proper gradient as laid in dry bed/ shallow water in the alignment of panton bridge as per direction of Eingeer-in-Charge. |
| 4 | During Carriying the Pontoon Pair from Place of anchoring (D/s Side of Bridge) in water and then to cross the Dry Bed/Shallow Water on the way up to the alignment, Disconnecting the Pontoon Pair and rolling the Pontoon and Fixing in thealignment. |
| 5 | Laying of wooden anchors in the river on the up stream/ Down stram side of the pantoon bridge site incuding their weaving packing the sand filled bags (av. 90 bags) properly before laying and fixing to pantoon with coir rope/ sisall rope excluding cost. |
| 6 | Cartage and laying of chaqured plate including loading, unloading cost of carriage from prade ground store and laying at site as per direction of Eingeer-in-Charge. |
| 7 | Fixing of railing post in position including making 16 mm dia 25 cm deep hole with the help of generator and drill machine over sleeper and all sal edging before fixing the railing post with help of 300X16 mm size nut and bolts at 1.25 mtr. |
| 8 | Carriage and laying of sal sleeper including loading, unloading cost of carriage from central store and decking on the bridge as per direction of Engineer-in-Charge. |
| 9 | Same as item above but sal edging. |
| 10 | Carriage and laying of spliced R.S. joist (5.00m long) including loading unloading cost of carriage from central store and placing on the as per direction of Engineer-in-Charge. |
| 11 | Earth work in cutting or in embankment in ordinary soil excavation to be in the form of regular \"pits not exceeding Vi meter (20\") in depth and earth work in embankment to be in 20 Cm. (8\") layers, including ramming and dressing the surface to required levels and slopes and also including 1.5 m. (5 ft) lift and 30 m. (100\") lead. The earth from cutting to be used in making embankment or to be deposited as spoil banks within 30m. (100\") distance as directed by the E/I. for approach of pantoon |
| 12 | Supply of 150 mm dia equcliptus bali including loading, unloading cartage and stacking at store. |
| 13 | Fixing of railing wire through hole of railing post and hole of vertical post and making wire stay of each rows and tighened with the help of stay clamps including making of hole in vertical ballies pst (labour only) |
| 14 | Construction of Pile culvert (Labour only |
| 15 | Empty cement bags of good condidtion (Plastic) filled with local sand including filling stitching stacking at site of work |
| 16 | Supply ofNariyalropeincluding loading, unloading cartage and stacking at store. |
| 17 | 20 mm Plastic rope |
| 18 | Large bamboos of 7.5 cm dia |
| 19 | Supply of 30x300 mm size nut bolt including loading, unloading cartage and stacking at store. |
| 20 | Mallahi nail of 15 cm to 30 cm long |
| 21 | Supply of 30x150 mm size nut bolt including loading, unloading cartage and stacking at store. |
| 22 | Supply of 30 mm washerincluding loading, unloading cartage and stacking at store. |
| 23 | Small Boat with Mallah |
| 24 | Cartage of pantoon in river from bridge to safe place at Saray upto 0.5 km distance. |
| 25 | Bundaling with the help of 10 cm horizontal ballies and 15 cm vertical ballies @ 50 cm c/c ballies and fixing below 1.00 to 3.00 M of water level and placing sand filled bag upto 30 cm above water level |
| 26 | Dismentalling of chequred plate road and lifting of chequred plate laying in the alignment of road for loading into truck, including cost of cartage, loading unladong T & P and duly stacked in store |
| 27 | Extraction of 10 mm dia wire rope wira from railing post and making roll |
| 28 | Dismantalling and carrying railing post fixed in position including operning of 300X16 mm nut and bolt including loading, unloading cartage and duly stacked at store |
| 29 | Dismantalling and carrying sal edging fixed over the sleeper including loading, unloading cartage and duly stacked in store |
| 30 | Dismantalling and carrying sal sleeper in dacking over the bridge including cleaning the kapsa soil and kansa loading, unlading carriage and duly stacked |
| 31 | Carrying the spliced R.S. joist 5.2 m long between two pantoon after dismanteling of pantoon pair including loading, unloading cartage and duly stacked in store |
| 32 | Supply of 4 Chaukidar for 365 Days at two No. of Ghats - (1) Saryu Ghat (2) Ghaghra Ghat |
| 33 | Supply of Crane of capacity 80 tones for lifting purpose of pantoon including its fuel, wages of driver all complete |
| 34 | Supply of 8 Labour for the period of 75 days regular for unsusceptible work such as loading and unloading, levelling of ground and other work required as per instruction of Engineer-in-Charge |
| 35 | Supply of water Tanker with tractor for Period of 90 Days during the availability of Traffic over pantoon |
| 36 | Supply of JCB Machine with POL and Driver for levelling of ground during errection of Pantoon bridge |
| 37 | Mild steel or iron work in heavy sizes such as trusses, built up gates, record racks, roof work, gates etc; wrought to required form, including drilling holes riveting or welding where necessary & their fixing, required for proper completion of the work. for repair of pantoon |
| 38 | Painting or varnishing new iron work in small areas or new wood with two coat (up to one sq. meter) of ready mixed priming paint and one coat of approved superior quality ready mix paint (2n quality synthetic enamel paint of approved brand such as British paint, Shalimar, Asian or equivalent as approved by E/I) or Varnish including supply of all materials, labour, T&P etc. required for proper completion of the work. Paint to be used should confirm the I. S. I. No. 103-1950. S.I. No. 641+642 |
| 39 | Hire charges of 33 KVA generator for welding work including P.O.L. |