Supply Of (A) Bg Ttr(P) Of The Existing 60Kg Rail 1 In 12 (Fs) By 60 Kg 1 In 12 (Tws) Pt. No. 101 At Abfc Yard, Pt. No. 111, 113, 115, 116 At Blk Yard, Pt. No. 121, 122 At Rqj Yard (Total = 7 Sets), Bg Ttr(P) Of The Existing 52Kg Rail 1 In 8.5 (Fs) By 60 Kg 1 In 8.5 (Fs) Pt. No. 107, 108 At Pjp Yard, Pt. No. 108, 111 At Gil Yard (Total = 4 Sets), Bg Ttr(P) Of The Existing 60Kg Rail 1 In 12 (Fs) By 60 Kg 1 In 12 (Tws) With Sleeper Pt. No. 102, 103, 104, 105, 107, 125, 124, 123, 122, 121, 127 At Abfc Yard, Pt No. 101, 105, 106, 103 At Blk Yard, Pt No. 101, 102, 103, 105, 106, 107, 126, 124, 125, 127, 131 At Rqj Yard (Total = 26 Sets) Under The Jurisdiction Of Den/Line/Kir. (B) Bg Ttr(P) Of The Existing 60Kg Rail 1 In 12 (Fs) By 60 Kg 1 In 12 (Tws)Pt. No. 101, 105, 102, 110 At Mxj Yard, Pt. No. 101, 103, 105, 102, 106 At Tmh Yard, Pt. No. 101, 105, 102, 104, 106, 110 At Dmz Yard, Pt. No. 103, 105, 102, 106, 110 At Cat Yard Under The Jurisdiction Of Den/Line/Kir (Grand Total = 20 Sets).(A) Bg Ttr(P) Of The Existing 60Kg Rail 1 In 12 (Fs) By 60 Kg 1 In 12 (Tws) Pt. No. 101 At Abfc Yard, Pt. No. 111, 113, 115, 116 At Blk Yard, Pt. No. 121, 122 At Rqj Yard (Total = 7 Sets), Bg Ttr(P) Of The Existing 52Kg Rail 1 In 8.5 (Fs) By 60 Kg 1 In 8.5 (Fs) Pt. No. 107, 108 At Pjp Yard, Pt. No. 108, 111 At Gil Yard (Total = 4 Sets), Bg Ttr(P) Of The Existing 60Kg Rail 1 In 12 (Fs) By 60 Kg 1 In 12 (Tws) With Sleeper Pt. No. 102, 103, 104, 105, 107, 125, 124, 123, 122, 121, 127 At Abfc Yard, Pt No. 101, 105, 106, 103 At Blk Yard, Pt No. 101, 102, 103, 105, 106, 107, 126, 124, 125, 127, 131 At Rqj Yard (Total = 26 Sets) Under The Jurisdiction Of Den/Line/Kir. (B) Bg Ttr(P) Of The Existing 60Kg Rail 1 In 12 (Fs) By 60 Kg 1 In 12 (Tws)Pt. No. 101, 105, 102, 110 At Mxj Yard, Pt. No. 101, 103, 105, 102, 106 At Tmh Yard, Pt. No. 101, 105, 102, 104, 106, 110 At Dmz Yard, Pt. No. 103, 105, 102, 106, 110 At Cat Yard Under The Jurisdiction Of Den/Line/Kir (Grand Total = 20 Sets).,