|
| 1 | Excavation in Foundation as per DSR Item No 2.8.1 |
| 2 | Providing and laying cement concrtete 1:4:8 as per DSR No 4.1.8 |
| 3 | Sand filling in Plinth including supply of necessary quantity of sand as per DSR Item No 2.27 |
| 4 | Providing and Injecting chemical emulsion antitermite as per DAR No 2.35.3 |
| 5 | Providing and Laying cement concrete for reinforcement upto plinth level as per DSR Item No 5.33.1.1 |
| 6 | Providing and Laying cement concrete for reinforcement above plinth level as per DSR Item No 5.33.2.1 |
| 7 | Providing and applying a coat of Residual petroleum bitumen DSR No 4.13 |
| 8 | Brcik work in superstructure as per DSR Item No 4.13 |
| 9 | Providing and Laying Brick coba with brick ballast as per DSR Item No 22.7.1 |
| 10 | Providing and fixing of Flush door shutter including nesessary fittings as per DSR Item No 9.21.1 |
| 11 | Extra for Providing And fixing flush doorwith decorative veneering as per DSR Item No 9.22.1 |
| 12 | Providing and fabrication of M.S choukhat, Door,windows and grill as per DSR Item No 10.25.2 |
| 13 | Providing wood work in frame of doors and window as per DSR Item No 9.1.1 |
| 14 | Providingand fixing factory made UPVC white colour sliding glazed window as per M R |
| 15 | Fly proof stainless steel grade 304 wire gauge 0.5 mm dia wire as per DSR Item No 9.7.8 |
| 16 | Providing and Laying of TMT Steel bar for rinforcement as per DSR Item No 5.22.6 |
| 17 | Fixing of Door as per DSR Item No 14.2.1 |
| 18 | Fixing of window as per DSR Item No 14.2.2 |
| 19 | 12 mm cement plaster as per DSR Item No 13.4.2 |
| 20 | 15 mm cement plaster as per DSR Item No 13.5.2 |
| 21 | Add for Plaster drip/ groove in plaster surface or mouding to RCC Projection as per DSR Item No 5.30 |
| 22 | Providing and Laying of vitrified Floor tile as per DSR Item No 11.41.2 |
| 23 | Providing and Laying of vitrified Floor tile as per DSR Item No 11.46.2 |
| 24 | 9 mm thick AC4 -3064 Elegant work wooden Flooring Make ACTION TESA over Vitrified Tile etc complete for proper completion the work |
| 25 | wood polishing two or more code on new wooden work as per DSR Item No 13.68.1 |
| 26 | Finishing wall with Premium Acrylic Smooth exterior paint as per DSR Item No 13.47.1 |
| 27 | Oil Bound two or more coat as per DSR item No 13.41.1 |
| 28 | Providing and Applying white cement based putty as per DSR Item No 13.80 |
| 29 | Providing and fixing of door stoper as per DSR Item No 9.82 |
| 30 | Providing and fixing of aluminium sliding door as per DSR Item No 9.96.2 |
| 31 | Providing and fixing Aluminium tower bolt 250 mm as per DSR Item No 9.97.2 |
| 32 | Providing and fixing Aluminium tower bolt 200 mm as per DSR Item No 9.97.3 |
| 33 | Providing and fixing of Aluminium handle as per DSR Item No 9.100.1 |
| 34 | Providing and fixing Gypsum False ceiling as per DSR Item No 12.52.3 |
| 35 | Providing and fixing of PVC wall paneling with WPC wood, DECO wood Veneer with Melamine polish as per MR |
| 36 | P/F of curtain rod as per DSR Item No 9.46.3 |
| 37 | Centering and shuttering in foundation as per DSR Item No 5.9.1 |
| 38 | Centering and shuttering in landing balconies as per DSR Item No 5.9.3 |
| 39 | Centering and shutting in Lintel, Beams , Plinth Beam, girders and contilevers as per DSR Item No 5.9.5 |
| 40 | Centering and shuttering in Columns and pillors as per DSR Item No 5.9.6 |